PSL Cell 9 Upgrade
Closed Solicitation Posted
- Solicitation number
- W912CH-24-R-L007
- Agency
-
TACOM Life Cycle Management Command
Army Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 335999 All Other Miscellaneous Electrical Equipment and Component Manufacturing
- PSC
- 6145 Wire And Cable, Electrical
- Place of performance
- Warren, Michigan, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command TACOM Life Cycle Management Command is seeking proposals for the PSL Cell 9 Upgrade project. The objective is to procure and deliver new shielded wiring, cables, probes, and EMI protective equipment required to accurately test and collect data on highly electrified propulsion technologies being developed and tested at the Ground Vehicle Systems Center's Propulsion Systems Laboratory. This equipment is needed to mitigate electromagnetic interference (EMI) and enable full load cooling testing on electrified Abrams vehicles in Cell 9. Questions are due by May 6, 2024, with responses provided by May 9, 2024. Proposals are due by August 1, 2024.
This is a Small Business Set-Aside solicitation. The new EMI-protected equipment may also be used in other GVPM test cells and the Electrical Components Laboratory as they transition to highly electrified propulsion component and vehicle testing. The place of performance is Warren, MI. No potential incumbents or award values were provided in the solicitation documents.
Notice text
2 versions
Update #2 · Latest ·
C.1 Project Title: PSL, Cell 9, Shielded Wiring for Electrified Powertrain Testing
C.2 Objectives: Electrified power train components and electrified propulsion continue to be developed and tested by the US Army, Ground Vehicle Systems Center (GVSC), Ground Vehicle Power and Mobility (GVPM), Propulsion Systems Laboratory (PSL) facility. The electrified propulsion technologies under development emit an Electromagnet Interference (EMI) that can be disruptive to the accuracy and control of the existing Data Acquisition (DAQ) equipment. The existing DAQ equipment typically uses wiring and cables compatible with the low EMI interference generated from the testing of conventional mechanical propulsion systems. New multi-strand wires and cables which are shielded and grounded, specialized probes, and EMI protective jackets are required to accurately test and collect data while testing electrified propulsion technologies. Currently, GVPM cell 9 is the only test cell capable of performing the critical full load cooling test on an Abrams class vehicle. Cell 9 requires the stated new EMI protected laboratory equipment if full load cooling testing is to be performed on an electrified Abrams. It is envisioned that the new EMI protected laboratory equipment may also be used in GVPM test cells 2, 4, 5, and the Electrical Components Laboratory (ECL) which are also transitioning towards the development and testing of highly electrified propulsion components, powerpacks, and full vehicles. This action is a Full and Open Competiton. Please see attached Amendment 0003 to Solicitation W912CH-24-R-L007 for full description on SF 30 Block 14 Continuation Page.
Questions are due by 28 June 2024 to Rodolfo Hernandez at rodolfo.hernandez-diaz.civ@army.mil.
Update #1 ·
C.1 Project Title: PSL, Cell 9, Shielded Wiring for Electrified Powertrain Testing
C.2 Objectives: Electrified power train components and electrified propulsion continue to be developed and tested by the US Army, Ground Vehicle Systems Center (GVSC), Ground Vehicle Power and Mobility (GVPM), Propulsion Systems Laboratory (PSL) facility. The electrified propulsion technologies under development emit an Electromagnet Interference (EMI) that can be disruptive to the accuracy and control of the existing Data Acquisition (DAQ) equipment. The existing DAQ equipment typically uses wiring and cables compatible with the low EMI interference generated from the testing of conventional mechanical propulsion systems. New multi-strand wires and cables which are shielded and grounded, specialized probes, and EMI protective jackets are required to accurately test and collect data while testing electrified propulsion technologies. Currently, GVPM cell 9 is the only test cell capable of performing the critical full load cooling test on an Abrams class vehicle. Cell 9 requires the stated new EMI protected laboratory equipment if full load cooling testing is to be performed on an electrified Abrams. It is envisioned that the new EMI protected laboratory equipment may also be used in GVPM test cells 2, 4, 5, and the Electrical Components Laboratory (ECL) which are also transitioning towards the development and testing of highly electrified propulsion components, powerpacks, and full vehicles. Please see attachment for full description. This action is a Small Business Set-Aside.
Questions are due by 6 May 2024 to Rodolfo Hernandez at rodolfo.hernandez-diaz.civ@army.mil.
Responses to questions will be provided by 9 May 2024.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Power supply | Land and Maritime | No set-aside | |
| Transformer, psrl | Land and Maritime | No set-aside | |
| NG SEW-electrical components | ACC Rock Island | Total Small Business |