Pseudo-Satellite Antenna for GPS Signal Rebroadcast

Closed Solicitation Posted

Solicitation number
A14-066
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSC
AC12 National Defense R&D Services; Department Of Defense - Military; Applied Research
More information

Notice details come from DoD SBIR/STTR (DSIP). Updated .

Notice text

DoD SBIR topic A14-066

Component: ARMY

Command: PEO IEW&S

Phase: SBIR Program Phase I Action

Technology Areas: Electronics

Keywords: GPS; Global Positioning System; Anti-Jam; Antenna; Position; Navigation; Timing; PNT; Pseudo-Satellite; Pseudolite

Objective:

The objective of this project is to develop and demonstrate Global Positioning System (GPS) pseudo-satellite antenna solutions that are capable of installation and operation on a US Army Tier II/III UAS and US Army Ground Vehicles.

Description:

While GPS is the most prevalent navigation method in use today, its weak satellite signal is vulnerable to both unintentional interference and deliberate jamming from an adversary. With so much of the Army’s operations and infrastructure depending on GPS, means are urgently needed to assure the continued availability of GPS-based Position, Navigation, and Timing (PNT) capabilities. Traditionally this has been solved through neutralization of the jammer or nulling or cancellation of the jammer signal. An alternative method is the reception, processing, and re-broadcast of the GPS Signal by a pseudo-satellite, or pseudolite. The intent of this initiative is to develop antenna solutions to broadcast the GPS augmentation signal according to IS-ICD-250. On a Tier II/III UAS, this antenna will need to be installed as a secondary payload and will be used to broadcast the GPS augmentation signal. On terrestrial platforms, the antenna will need to transmit the GPS augmentation signal according to IS-ICD-250. It is intended that no more than two antenna solutions will be necessary, one for the air tier and one for the terrestrial platforms. The antennas must function with existing pseudolite transceiver hardware developed under other US Army programs which will be used in later phases for test and demonstration.

Phase I:

Phase I will perform a feasibility study of the antennas for the Tier II/III UAS and terrestrial platforms and their respective missions. This study will document the viability, risks, and tradeoffs. This feasibility study will also identify technical approaches to the required antenna solutions. The platform antenna of highest technical risk to meet the key performance requirements will be developed into a deliverable prototype capable of demonstration in a laboratory environment. It is envisioned that no more than one meeting will be held at Aberdeen Proving Ground, Maryland. All other communications and meetings will be via telecon/VTC or held at the contractor facility. US Government contractors maybe used to facilitate proposal evaluation but they will not be technical evaluators.

Phase II:

Antenna apertures, based on the technical approaches presented and prototype developed within Phase I, will be developed and produced in support of relevant field environment testing and evaluation on terrestrial and aviation platforms. Contractor will validate that the antennas meet the performance objectives and will demonstrate the pseudolite capability in a field environment. A plan will be developed to detail the development, demonstration, maturation, and validation and verification (V+V) of these capabilities to assist in a transition to Phase III. The small business will deliver one prototype antennas for each of the platforms, one for the air platform and one for the terrestrial platform.

Phase III:

Develop and implement a technology transition plan with Product Director Positioning Navigation and Timing (PD PNT). The transition should include further technology maturation to Information Assurance, Environmental, EMI/EMC and Airworthiness considerations. Finalize the antenna hardware and software, and conduct qualification testing of the product with R&D prototype and actual pseudolite production hardware. This technology is applicable to the US Army and other DoD users that require Assured PNT capability. The envisioned production rate is 20 antennas per month, for a total of approximately 1,500 systems to support Army pseudolite requirements.

Files

File Type Posted
A14-066.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors