Provide replacement crane
Awarded Award Notice Posted
- Solicitation number
- W911PT18Q0078
- Agency
- TACOM Life Cycle Management Command Army Materiel Command, Department of Defense
- Awarded
- to Pollock Research & Design, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- W911PT18P0152 Federal contract award
- NAICS code
- 333923 Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
- PSC
- Not on record
- Place of performance
- 1 Buffington St Watervliet, New York 12189, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
PROVIDE REPLACEMENT CRANE FOR B233, LOCATED IN A BAY BLDG 110 NORTH END. CRANE - UNDER RUNNING SINGLE GIRDER, 18 FEET - 0 INCH SPAN, 3TON CAPACITY, 460V-3PHASE-60 HZ, 115V SINGLE PHASE CONTROL VOLTAGE, 2 SPEED HOIST. HOIST WITH MOTORIZED TROLLEY, W/ELECTRIC CHAIN HOIST - 3TON CAPACITY, 460VAC-3PHASE-60HZ, 115V SINGLE PHASE CONTROL VOLTAGE, ONE SPEED LIFT, PAINTED SAFETY YELLOW. SERVICE CONTRACT LABOR STANDARDS 15-4143 REV 7 APPLIES AND INCORPORATED. TECH POC; LES MCELYA, 518-266-5253. SCOPE OF WORK
A. Provide replacement Hoist and install equipment
1. Contractor will provide replacement cost of crane-underrunning single girder, 18 feet -o inch span, 3 ton capacity, 460v-3phase-60hz, 115v single phase control voltage, 2 speed bridge
2. Contractor will provide cost of motorized trolley with electric chain hoist - 3 ton capacity, 460vac 3-phase-60hz, 115v single phase control voltage, one speed lift.
3. Contractor will provide cost of installation of replacement crane and removal of old crane..
Update #1 ·
Added: Apr 03, 2018 4:19 pm
PROVIDE REPLACEMENT CRANE FOR B233, LOCATED IN A BAY BLDG 110 NORTH END. CRANE - UNDER RUNNING SINGLE GIRDER, 18 FEET - 0 INCH SPAN, 3TON CAPACITY, 460V-3PHASE-60 HZ, 115V SINGLE PHASE CONTROL VOLTAGE, 2 SPEED HOIST. HOIST WITH MOTORIZED TROLLEY, W/ELECTRIC CHAIN HOIST - 3TON CAPACITY, 460VAC-3PHASE-60HZ, 115V SINGLE PHASE CONTROL VOLTAGE, ONE SPEED LIFT, PAINTED SAFETY YELLOW. SERVICE CONTRACT LABOR STANDARDS 15-4143 REV 7 APPLIES AND INCORPORATED. TECH POC; LES MCELYA, 518-266-5253. SCOPE OF WORK
A. Provide replacement Hoist and install equipment
1. Contractor will provide replacement cost of crane-underrunning single girder, 18 feet -o inch span, 3 ton capacity, 460v-3phase-60hz, 115v single phase control voltage, 2 speed bridge
2. Contractor will provide cost of motorized trolley with electric chain hoist - 3 ton capacity, 460vac 3-phase-60hz, 115v single phase control voltage, one speed lift.
3. Contractor will provide cost of installation of replacement crane and removal of old crane.
Attachments
| File | Type | Posted |
|---|---|---|
| 18Q0078.doc | DOC document |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity