Provide and install heavy-duty push bumpers and PIT wraps

Closed Pre-Solicitation Posted

Solicitation number
140P2126Q0185
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
811111 General Automotive Repair
PSC
J023 Maint/Repair/Rebuild Of Equipment- Ground Effect Vehicles, Motor Vehicles, Trailers, And Cycles
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The National Park Service is seeking information from capable upfitters to provide and install heavy-duty push bumpers and PIT wraps for federal law enforcement SUVs and sedans during fiscal year 2027, with responses due by September 9, 2026. This is a sources-sought notice only; the Government is not soliciting quotes, bids, or proposals at this time and will not accept unsolicited proposals or pay for response costs.

Respondents should submit company name and address, point of contact information, UEI and CAGE code, and primary business size or socioeconomic status via email to michelle_shoshone@ios.doi.gov. Applicants must provide product brochures in PDF format for the types of PIT and push bars their companies can supply, including standard push bumpers, lower PIT wraps (single rail fender bars), full wrap/heavy-duty grille and headlight guards, light-ready/LED-integrated PIT bars, and winch-ready/heavy-duty options. Brochures must document any vehicle restrictions applicable to each product type.

The specific vehicle makes, models, and model years that will require modification remain undetermined at the sources-sought stage. Respondents should indicate standard lead times for their products to support future acquisition planning. Participation in this information-gathering phase does not restrict or guarantee eligibility for any subsequent RFQ, IFB, or RFP.

Notice text

This is a REQUEST FOR INFORMATION ONLY. This notice is issued solely for information and planning purposes - it does not constitute a Request for Quote (RFQ)/Invitation for Bid (IFB)/Request for Proposal (RFP) or a promise to issue an RFQ, IFB or RFP in the future. This notice does not commit the U.S. Government to contract for any supply or service. Further, the U.S. Government is not seeking quotes, bids or proposals at this time and will not accept unsolicited proposals in response to this sources sought notice. The U.S. Government will not pay for any information or administrative costs incurred in response to this notice. Submittals will not be returned to the responder. Not responding to this notice does not preclude participation in any future RFQ or IFB or RFP, if any is issued.

The Government is seeking capable upfitters to provide and install heavy-duty push bumpers and PIT wraps for federal law enforcement SUVs and sedans during fiscal year 2027.
The vehicle type that PIT/Push bars will be installed on is unknown at the time of this sources sought.

In response to this sources sought, please provide the following information by email to michelle_shoshone@ios.doi.gov

1. Company Name & Address:
* Point of Contact (Name, Title, Email, Phone):
* Unique Entity ID (UEI) & CAGE Code:
* Primary Business Size / Socioeconomic Status (e.g., Large, SB, SDVOSB, WOSB)

2. Please provide brochures in .pdf format for the following types of PIT/push bars that your company can provide to support a future acquisition. If there are vehicle restrictions for the PIT/push bar type, please ensure that data is included.
a) Standard Push Bumper
b) Lower PIT Wraps (Single Rail Fender Bars)
c) Full Wrap / Heavy-Duty Grille & Headlight Guards
d) Light-Ready / LED-Integrated PIT Bars
e) Winch-Ready / Heavy Duty (HD)

3. Since exact vehicle makes, models, and model years (e.g., Ford Police Interceptor Utility, Chevy Tahoe PPV, Dodge Durango) are currently undetermined, what is your standard lead time for manufacturing and delivering mounting hardware once vehicle specs are finalized?

4. Do you maintain an inventory of standard, multi-vehicle compatible push bumpers, or are all mounting brackets manufactured strictly built-to-order?

5. It is anticipated that installation will be required within 50 miles of each of the following 3 locations. If your company can not support installation within 50 miles of each of these locations; how can you support this acquisition? For example, would your company pick up the vehicles for installation and deliver upon completion? Describe how you can support this acquisition.
a) 1901 Anacostia Drive SE
Washington, DC 20020
b) 210 New York Ave
Staten Island, NY 10305
c) 1217 Ralston Ave
San Francisco, CA 94129

6. If installation occurs beyond the 50-mile radius, does your company provide flatbed/transport pick-up and redelivery services? If yes, is transport pricing structured on a flat-rate per vehicle or a mileage-based rate?

7. Does your company offer mobile upfitting/installation teams capable of performing installation on-site at Government facilities (e.g., an agency bay or secure parking lot) at the designated locations?

8. What is your facility's secure vehicle storage capacity (indoor/fenced lot with 24/7 security) at or near each of the three performance locations?

9. Are installation services available directly on your GSA schedule, or are they provided as open-market items?

10. What is your typical turnaround time (in business days) per vehicle for installing a push bumper / PIT wrap assembly once a vehicle is delivered to your shop?

11. What standard commercial warranty is provided on both the hardware (finish/corrosion) and the installation labor?

12. Are your PIT bars engineered and tested to ensure non-interference with OEM vehicle crash sensors, forward-facing radar, and Supplemental Restraint Systems (SRS airbags)?

13. Please state your company's business size and socioeconomic status under NAICS 336390 (Motor Vehicle Parts Manufacturing - 1,000 employees) and/or NAICS 811111 (General Automotive Repair - $9.0M). If you are a Large Business manufacturer, do you anticipate utilizing local certified Small Business upfitters or subcontractors to perform installation within the designated 50-mile geographic zones?

14. Optional Capability Question: Does your company have the capability (either directly or via a GSA Contractor Team Arrangement / Subcontracting partnership) to provide and install Mobile Data Terminal (MDT) mounting/docking hardware alongside push bumper/PIT bar installations as part of a single turnkey fleet upfit requirement?

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity