Project Labor Agreement Survey Notice, Lower Norco Bluffs Improvements, Norco, CA
Closed Special Notice Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912PL20B0005
- Agency
-
ENDIST Los Angeles
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Norco Ca Usa
Notice details come from SAM.gov. Updated .
About this opportunity
This Special Notice was published by the U.S. Army Corps of Engineers Los Angeles District to solicit feedback from construction contractors on the potential use of a Project Labor Agreement for the Lower Norco Bluffs Improvements project in Riverside County, California. The Notice seeks input on key questions related to PLAs by January 8, 2021 from firms with a NAICS code of 237990 and experience relevant to the project scope.
The Notice details a large scale construction project with an estimated cost between $25-100 million to place earth fill and install riprap slope protection along 7,330 feet of bluffs in Norco, California over a 720 day duration. Contractors are invited to submit responses no longer than three pages to the identified point of contact addressing whether PLAs should be used on selected large contracts in the area and the potential benefits, schedule and cost impacts, and other factors to consider. The objective is to gather industry feedback on applying Project Labor Agreement provisions and clauses 52.222-33 and 52.222-34 to the Corps of Engineers contract for this project.
Notice text
The U.S. Army Corps of Engineers, Los Angeles District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLA) for large scale construction project (exceeding $25 million) within Riverside County, Norco California. The project consists of an earth fill placed against the existing bluffs, approximately 7,330 feet in length, revetted with riprap slope protection and a launchable stone toe blanket. The project will tie into existing high ground at the upstream (Station 90+20) and downstream (Station 19+90) project extents. The embankment fill will raise the grade between 12 and 25 feet above existing grade to provide protection up to a 100-year flow event water surface elevation (WSE). The proposed embankment slope is 2H:1V and is revetted with riprap slope protection 42 inches thick measured perpendicular to the slope face. Expected scour is between 5 and 14 feet below the existing thalweg (between 6 and 19 feet below existing grade at the project alignment). To eliminate the need for dewatering, excavation is planned down to 2 feet above typical groundwater averaging 5 feet below existing grade. A launchable stone toe is intended to provide some protection from scour. The launchable stone toe is 9 feet high and varies in width, between 10 and 30 feet, depending on the expected scour depth along the project alignment.
Estimated Construction prince range is $25,000,000 - $100,000,000.
The proposed project duration is 720 calendar days after the contractors receipt of the notice to proceed
Replies to this notice are being sought from firms with the North American industry Classification System (NAICS) 237990.
A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Federal Acquisition Regulation (FAR) Policy:
(a) A Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in
Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects.
(b) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will (1) Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and
(2) Be consistent with law. Reference: Provision: 52.222-33 Notice of Requirement for Project Labor Agreement Clause 52.222-34 Project Labor Agreement.
The construction community is invited to comment on the use of PLA.
Please provide responses to any or all of the following questions:
(1) Should PLAs be executed on selected large dollar, large scale civil works construction contracts in Riverside county, California?
(2) Are there concerns by prime contractors on the availability of skilled construction labor?
(3) Would a PLA benefit a project which contains a unique and compelling mission-critical schedule? How?
(4) What type of project should not be considered for PLA clauses?
(5) What is the time impact to the completion of the contract due to a PLA?
(6) What is the cost impact to the bid/proposal due to a PLA?
(7) What other factors should the Corps consider before deciding to include PLA provisions in a Corps of Engineers Los Angeles District contract?
Please limit your responses to no more than three (3) pages in length. Provide your comments via e-mail transmission to Michael.g.robinson@usace.army.mil not later than 8 January 2021.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Lower Norco Bluffs Toe Protection | Award Notice | |
| Lower Norco Bluffs Toe Protection | Solicitation | |
| Lower Norco Bluffs Toe Protection | Pre-Solicitation | |
| This notice | Special Notice | |
| Santa Ana River Mainstem, Prado Basin improvements, at various locations | Pre-Solicitation | |
| Repair by Replacement of Electrical Distribution Circuit South Loop 2, Vandenberg AFB, CA | Solicitation | |
| Repair by Replacement of Electrical Distribution Circuit South Loop 2, Vandenberg AFB, CA | Pre-Solicitation | |
| Repair by Repalacement of Electrical Distribution Circuit South Loop 2, Vandenberg AFB, CA | Pre-Solicitation |