Product Manager Force Protection Systems (PdM FPS)Systems Engineering and Technical Assistance (SETA) Contract

Award Notice Posted

Solicitation number
W911QY12R0024
Agency
Awarded
to Strategy And Management Services, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W911QY-12-D-0026 Federal IDV award
NAICS code
541990 All Other Professional, Scientific, and Technical Services
PSC
Not on record
More information

Notice details come from SAM.gov. Updated .

Notice text

8 versions

Update #8 · Latest ·

The U. S. Army Contracting Command, Natick Contracting Division in support of Product Manager Force Protection Systems (PdM FPS) has a requirement for Systems Engineering and Technical Assistance (SETA) contract to provide personnel, equipment, tools, materials, supervision, and other items and non-personal services. The objective is to provide SETA support to PdM FPS during all phases of pre-acquisition, technology development (TD), engineering and manufacturing development (EMD) production and deployment, and operations and support for Force Protection/Physical Security Equipment (FP/PSE) development/non-development programs and projects to assure the development process is fully integrated with respect to design, test and evaluation, production, operation and logistic support. The primary mission of PdM FPS is research, development, acquisition (RDA), and the commercial product evaluation of FP/PSE under purview of the Army pursuant to DoDI 3224.03. In addition, PdM FPS is responsible for: centralized management of PF/PSE for US Army users, joint service applications, and actions required to type classify such equipment developed by other services or Federal agencies for which a stated U.S. Army requirement exists; and assistance to other Services and Federal Agencies in the development and acquisition of FP/PSE systems. This includes support to the DoD Physical Security Equipment Action Group (PSEAG) and its associated working groups such as the Interagency Technical Support Working Group (TSWG). The following Technology Development (TD), Engineering and Manufacturing Development (EMD) and Other Procurement Army (OPA) funded programs/products are currently being managed or supported by PdM FPS to meet DoD specific requirements: Integrated Commercial Intrusion Detection System (ICIDS); Mobile Detection Assessment Response System (MDARS); Battlefield Anti-Intrusion System (BAIS)(AN/PRS-9); Lighting Kit, Motion Detector (LKMD)(AN/GAR-s); Force Protection Suite Project; Entry Control Point (ECP) Project; Non-Intrusive Inspection System (NIIS) Project; Rapid Deployment Integrated Surveillance System (RDISS) Project; Automated Installation Entry (AIE) Project and planning and execution of DoD Force Protection Equipment Demonstrations (FPED). Emerging requirements for which SETA support would be required include Integrated Ground Security Surveillance and Response Capability (IGSSR-C); Tactical Security System (TSS); and Tunneling Detection. The contract will be an Indefinite Delivery/Indefinite Quantity (ID/IQ) in which Task Orders may be issued and will be for a one year base period, a first option period of one year and a second option period of three months.

Update #7 ·

The U. S. Army Contracting Command, Natick Contracting Division in support of Product Manager Force Protection Systems (PdM FPS) has a requirement for Systems Engineering and Technical Assistance (SETA) contract to provide personnel, equipment, tools, materials, supervision, and other items and non-personal services. The objective is to provide SETA support to PdM FPS during all phases of pre-acquisition, technology development (TD), engineering and manufacturing development (EMD) production and deployment, and operations and support for Force Protection/Physical Security Equipment (FP/PSE) development/non-development programs and projects to assure the development process is fully integrated with respect to design, test and evaluation, production, operation and logistic support. The primary mission of PdM FPS is research, development, acquisition (RDA), and the commercial product evaluation of FP/PSE under purview of the Army pursuant to DoDI 3224.03. In addition, PdM FPS is responsible for: centralized management of PF/PSE for US Army users, joint service applications, and actions required to type classify such equipment developed by other services or Federal agencies for which a stated U.S. Army requirement exists; and assistance to other Services and Federal Agencies in the development and acquisition of FP/PSE systems. This includes support to the DoD Physical Security Equipment Action Group (PSEAG) and its associated working groups such as the Interagency Technical Support Working Group (TSWG). The following Technology Development (TD), Engineering and Manufacturing Development (EMD) and Other Procurement Army (OPA) funded programs/products are currently being managed or supported by PdM FPS to meet DoD specific requirements: Integrated Commercial Intrusion Detection System (ICIDS); Mobile Detection Assessment Response System (MDARS); Battlefield Anti-Intrusion System (BAIS)(AN/PRS-9); Lighting Kit, Motion Detector (LKMD)(AN/GAR-s); Force Protection Suite Project; Entry Control Point (ECP) Project; Non-Intrusive Inspection System (NIIS) Project; Rapid Deployment Integrated Surveillance System (RDISS) Project; Automated Installation Entry (AIE) Project and planning and execution of DoD Force Protection Equipment Demonstrations (FPED). Emerging requirements for which SETA support would be required include Integrated Ground Security Surveillance and Response Capability (IGSSR-C); Tactical Security System (TSS); and Tunneling Detection. The contract will be an Indefinite Delivery/Indefinite Quantity (ID/IQ) in which Task Orders may be issued and will be for a one year base period, a first option period of one year and a second option period of three months. The Government will award to the Offerorwhose proposal offers the best value in terms of Technical Ability, Past Performance, and Price.The Government envisions Firm Fixed Price task orders. The guarantee minimum is anticipated to be $2,500.00 for the length of each task order (base year) and the cumulative total of all Task Orders awarded will not exceed $49,062,064.65 over the life of the contract. The Government envisions that a single award will be made; however, it reserves the right to make no award or to make multiple awards, if in the best interest of the Government. If for any reason, there are no successful proposals, or only one successful proposal, the Government reserves the right to reopen the solicitation. This will be a Service Disabled Veteran Owned Small Business set-aside. NAICS Code 541990, All Other Professional, Scientific, and Technical Services, applies with a small business size standard of $7,000,000. Firms that were notified as being in the Competitive Range shall submit their Final Proposal Revision (FPR) which shall include their Best and Final Offer (BAFO) no later than 10:00 AM (EST) on 21 May 2012.

Update #6 ·

The U. S. Army Contracting Command, Natick Contracting Division in support of Product Manager Force Protection Systems (PdM FPS) has a requirement for Systems Engineering and TechnicalAssistance (SETA) contract to provide personnel, equipment, tools, materials, supervision, and other items and non-personal services. The objective is to provide SETA support to PdM FPS during all phases of pre-acquisition, technology development (TD), engineering and manufacturing development (EMD) production and deployment, and operations and support for Force Protection/Physical Security Equipment (FP/PSE) development/non-development programs and projects to assure the development process is fully integrated with respect to design, test and evaluation, production, operation and logistic support. The primary mission of PdM FPS is research, development, acquisition (RDA), and the commercial product evaluation of FP/PSE under purview of the Army pursuant to DoDI 3224.03. In addition, PdM FPS is responsible for: centralized management of PF/PSE for US Army users, joint service applications, and actions required to type classify such equipment developed by other services or Federal agencies for which a stated U.S. Army requirement exists; and assistance to other Services and Federal Agencies in the development and acquisition of FP/PSE systems. This includes support to the DoD Physical Security Equipment Action Group (PSEAG) and its associated working groups such as the Interagency Technical Support Working Group (TSWG). The following Technology Development (TD), Engineering and Manufacturing Development (EMD) and Other Procurement Army (OPA) funded programs/products are currently being managed or supported by PdM FPS to meet DoD specific requirements: Integrated Commercial Intrusion Detection System (ICIDS); Mobile Detection Assessment Response System (MDARS); Battlefield Anti-Intrusion System(BAIS)(AN/PRS-9); Lighting Kit, Motion Detector (LKMD)(AN/GAR-s); Force Protection Suite Project; Entry Control Point (ECP) Project; Non-Intrusive Inspection System (NIIS) Project; Rapid Deployment Integrated Surveillance System (RDISS) Project; Automated Installation Entry (AIE) Project and planning and execution of DoD Force Protection Equipment Demonstrations (FPED). Emerging requirements for which SETA support would be required include Integrated Ground Security Surveillance and Response Capability (IGSSR-C); Tactical Security System (TSS); and Tunneling Detection. The contract will be an Indefinite Delivery/Indefinite Quantity (ID/IQ) in which Task Orders may be issued and will be for a one year base period, a first option period of one year and a second option period of three months. The Government will award to the Offeror whose proposal offers the best value in terms of Technical Ability, Past Performance, and Price.
The Government envisions Firm Fixed Price task orders. The guarantee minimum is anticipated to be $2,500.00 for the length of each task order (base year) and the cumulative total of all Task Orders awarded will not exceed $49,062,064.65 over the life of the contract. The Government envisions that a single award will be made; however, it reserves the right to make no award or to make multiple awards, if in the best interest of the Government. If for any reason, there are no successful proposals, or only one successful proposal, the Government reserves the right to reopen the solicitation. This will be a Service Disabled Veteran Owned Small Business set-aside. NAICS Code 541990, All Other Professional, Scientific, and Technical Services, applies with a small business size standard of $7,000,000. Proposals shall be due no later than 2:00 pm on 2 March 2012. Any questions about this requirement must be submitted in writing to Phylis Ross at phylis.g.ross @us.army.mil. All proposals shall be sent to Commander RDECOM, RDMR-SSB/Chris Kleefisch, AMRDEC, Building 5400, Room E339, Redstone Arsenal, AL 35898.

Update #5 ·

The U. S. Army Contracting Command, Natick Contracting Division in support of Product Manager Force Protection Systems (PdM FPS) has a requirement for Systems Engineering and TechnicalAssistance (SETA) contract to provide personnel, equipment, tools, materials, supervision, and other items and non-personal services. The objective is to provide SETA support to PdM FPS during all phases of pre-acquisition, technology development (TD), engineering and manufacturing development (EMD) production and deployment, and operations and support for Force Protection/Physical Security Equipment (FP/PSE) development/non-development programs and projects to assure the development process is fully integrated with respect to design, test and evaluation, production, operation and logistic support. The primary mission of PdM FPS is research, development, acquisition (RDA), and the commercial product evaluation of FP/PSE under purview of the Army pursuant to DoDI 3224.03. In addition, PdM FPS is responsible for: centralized management of PF/PSE for US Army users, joint service applications, and actions required to type classify such equipment developed by other services or Federal agencies for which a stated U.S. Army requirement exists; and assistance to other Services and Federal Agencies in the development and acquisition of FP/PSE systems. This includes support to the DoD Physical Security Equipment Action Group (PSEAG) and its associated working groups such as the Interagency Technical Support Working Group (TSWG). The following Technology Development (TD), Engineering and Manufacturing Development (EMD) and Other Procurement Army (OPA) funded programs/products are currently being managed or supported by PdM FPS to meet DoD specific requirements: Integrated Commercial Intrusion Detection System (ICIDS); Mobile Detection Assessment Response System (MDARS); Battlefield Anti-Intrusion System(BAIS)(AN/PRS-9); Lighting Kit, Motion Detector (LKMD)(AN/GAR-s); Force Protection Suite Project; Entry Control Point (ECP) Project; Non-Intrusive Inspection System (NIIS) Project; Rapid Deployment Integrated Surveillance System (RDISS) Project; Automated Installation Entry (AIE) Project and planning and execution of DoD Force Protection Equipment Demonstrations (FPED). Emerging requirements for which SETA support would be required include Integrated Ground Security Surveillance and Response Capability (IGSSR-C); Tactical Security System (TSS); and Tunneling Detection. The contract will be an Indefinite Delivery/Indefinite Quantity (ID/IQ) in which Task Orders may be issued and will be for a one year base period, a first option period of one year and a second option period of three months. The Government will award to the Offeror whose proposal offers the best value in terms of Technical Ability, Past Performance, and Price.
The Government envisions Firm Fixed Price task orders. The guarantee minimum is anticipated to be $2,500.00 for the length of each task order (base year) and the cumulative total of all Task Orders awarded will not exceed $49,062,064.65 over the life of the contract. The Government envisions that a single award will be made; however, it reserves the right to make no award or to make multiple awards, if in the best interest of the Government. If for any reason, there are no successful proposals, or only one successful proposal, the Government reserves the right to reopen the solicitation. This will be a Service Disabled Veteran Owned Small Business set-aside. NAICS Code 541990, All Other Professional, Scientific, and Technical Services, applies with a small business size standard of $7,000,000. Proposals shall be due no later than 2:00 pm on 2 March 2012. Any questions about this requirement must be submitted in writing to Phylis Ross at phylis.g.ross @us.army.mil. All proposals shall be sent to Product Manager, Force Protection Systems, Attn: Mary Byrd, Bldg 365, Suite 1, 5900 Putnam Road, Fort Belvoir, VA 22060

Update #4 ·

The U. S. Army Contracting Command, Natick Contracting Division in support of Product Manager Force Protection Systems (PdM FPS) has a requirement for Systems Engineering and TechnicalAssistance (SETA) contract to provide personnel, equipment, tools, materials, supervision, and other items and non-personal services. The objective is to provide SETA support to PdM FPS during all phases of pre-acquisition, technology development (TD), engineering and manufacturing development (EMD) production and deployment, and operations and support for Force Protection/Physical Security Equipment (FP/PSE) development/non-development programs and projects to assure the development process is fully integrated with respect to design, test and evaluation, production, operation and logistic support. The primary mission of PdM FPS is research, development, acquisition (RDA), and the commercial product evaluation of FP/PSE under purview of the Army pursuant to DoDI 3224.03. In addition, PdM FPS is responsible for: centralized management of PF/PSE for US Army users, joint service applications, and actions required to type classify such equipment developed by other services or Federal agencies for which a stated U.S. Army requirement exists; and assistance to other Services and Federal Agencies in the development and acquisition of FP/PSE systems. This includes support to the DoD Physical Security Equipment Action Group (PSEAG) and its associated working groups such as the Interagency Technical Support Working Group (TSWG). The following Technology Development (TD), Engineering and Manufacturing Development (EMD) and Other Procurement Army (OPA) funded programs/products are currently being managed or supported by PdM FPS to meet DoD specific requirements: Integrated Commercial Intrusion Detection System (ICIDS); Mobile Detection Assessment Response System (MDARS); Battlefield Anti-Intrusion System(BAIS)(AN/PRS-9); Lighting Kit, Motion Detector (LKMD)(AN/GAR-s); Force Protection Suite Project; Entry Control Point (ECP) Project; Non-Intrusive Inspection System (NIIS) Project; Rapid Deployment Integrated Surveillance System (RDISS) Project; Automated Installation Entry (AIE) Project and planning and execution of DoD Force Protection Equipment Demonstrations (FPED). Emerging requirements for which SETA support would be required include Integrated Ground Security Surveillance and Response Capability (IGSSR-C); Tactical Security System (TSS); and Tunneling Detection. The contract will be an Indefinite Delivery/Indefinite Quantity (ID/IQ) in which Task Orders may be issued and will be for a one year base period, a first option period of one year and a second option period of three months. The Government will award to the Offeror whose proposal offers the best value in terms of Technical Ability, Past Performance, and Price.
The Government envisions Firm Fixed Price task orders. The guarantee minimum is anticipated to be $2,500.00 for the length of each task order (base year) and the cumulative total of all Task Orders awarded will not exceed $49,062,064.65 over the life of the contract. The Government envisions that a single award will be made; however, it reserves the right to make no award or to make multiple awards, if in the best interest of the Government. If for any reason, there are no successful proposals, or only one successful proposal, the Government reserves the right to reopen the solicitation. This will be a Service Disabled Veteran Owned Small Business set-aside. NAICS Code 541990, All Other Professional, Scientific, and Technical Services, applies with a small business size standard of $7,000,000. Proposals shall be due no later than 2:00 pm on 2 March 2012. Any questions about this requirement must be submitted in writing to Phylis Ross at phylis.g.ross @us.army.mil. All proposals shall be sent to Product Manager, Force Protection Systems, Attn: Mary Byrd, Bldg 365, Suite 1, 5900 Putnam Road, Fort Belvoir, VA 22060

Update #3 ·

The U. S. Army Contracting Command, Natick Contracting Division in support of Product Manager Force Protection Systems (PdM FPS) has a requirement for Systems Engineering and Technical Assistance (SETA) contract to provide personnel, equipment, tools, materials, supervision, and other items and non-personal services. The objective is to provide SETA support to PdM FPS during all phases of pre-acquisition, technology development (TD), engineering and manufacturing development (EMD) production and deployment, and operations and support for Force Protection/Physical Security Equipment (FP/PSE) development/non-development programs and projects to assure the development process is fully integrated with respect to design, test and evaluation, production, operation and logistic support. The primary mission of PdM FPS is research, development, acquisition (RDA), and the commercial product evaluation of FP/PSE under purview of the Army pursuant to DoDI 3224.03. In addition, PdM FPS is responsible for: centralized management of PF/PSE for US Army users, joint service applications, and actions required to type classify such equipment developed by other services or Federal agencies for which a stated U.S. Army requirement exists; and assistance to other Services and Federal Agencies in the development and acquisition of FP/PSE systems. This includes support to the DoD Physical Security Equipment Action Group (PSEAG) and its associated working groups such as the Interagency Technical Support Working Group (TSWG). The following Technology Development (TD), Engineering and Manufacturing Development (EMD) and Other Procurement Army (OPA) funded programs/products are currently being managed or supported by PdM FPS to meet DoD specific requirements: Integrated Commercial Intrusion Detection System (ICIDS); Mobile Detection Assessment Response System (MDARS); Battlefield Anti-Intrusion System (BAIS)(AN/PRS-9); Lighting Kit, Motion Detector (LKMD)(AN/GAR-s); Force Protection Suite Project; Entry Control Point (ECP) Project; Non-Intrusive Inspection System (NIIS) Project; Rapid Deployment Integrated Surveillance System (RDISS) Project; Automated Installation Entry (AIE) Project and planning and execution of DoD Force Protection Equipment Demonstrations (FPED). Emerging requirements for which SETA support would be required include Integrated Ground Security Surveillance and Response Capability (IGSSR-C); Tactical Security System (TSS); and Tunneling Detection. The contract will be an Indefinite Delivery/Indefinite Quantity (ID/IQ) in which Task Orders may be issued and will be for a one year base period, a first option period of one year and a second option period of three months. The Government will award to the Offeror whose proposal offers the best value in terms of Technical Ability, Past Performance, and Price. The Government envisions Firm Fixed Price task orders. The guarantee minimum is anticipated to be $2,500.00 for the length of each task order (base year) and the cumulative total of all Task Orders awarded will not exceed $49,062,064.65 over the life of the contract. The Government envisions that a single award will be made; however, it reserves the right to make no award or to make multiple awards, if in the best interest of the Government. If for any reason, there are no successful proposals, or only one successful proposal, the Government reserves the right to re-open the solicitation. This will be a Service Disabled Veteran Owned Small Business set-aside. NAICS Code 541990, All Other Professional, Scientific, and Technical Services, applies with a small business size standard of $7,000,000. Proposals shall be due no later than 2:00 pm on 2 March 2012. Any questions about this requirement must be submitted in writing to Phylis Ross at phylis.g.ross @us.army.mil. All proposals shall be sent to Product Manager, Force Protection Systems, Attn: Mary Byrd, Bldg 365, Suite 1, 5900 Putnam Road, Fort Belvoir, VA 22060

Contracting Office Address:
Army Contracting Command - Natick Contracting Division, 13501 Ingenuity Drive, Ste 200, Orlando, FL 32826

Place of Performance:
Both CONUS (on-site/off-site) and OCUNUS (Afghanistan, Kuwait, Qatar and Korea) work will be performed. For CONUS work, Government furnished spaces will be provided. No GFP is identified at this time for offsite work, but may be specified at the task order level.

Point of Contact(s):
Phylis G. Ross, Contract Specialist, 407-208-5619
Patricia A. Verica, Contracting officer (407) 208-3017
ACC-APG-NCD Acquisition Center - Natick

Update #2 ·

The U. S. Army Contracting Command, Natick Contracting Division in support of Product Manager Force Protection Systems (PdM FPS) has a requirement for Systems Engineering and Technical Assistance (SETA) contract to provide personnel, equipment, tools, materials, supervision, and other items and non-personal services. The objective is to provide SETA support to PdM FPS during all phases of pre-acquisition, technology development (TD), engineering and manufacturing development (EMD) production and deployment, and operations and support for Force Protection/Physical Security Equipment (FP/PSE) development/non-development programs and projects to assure the development process is fully integrated with respect to design, test and evaluation, production, operation and logistic support. The primary mission of PdM FPS is research, development, acquisition (RDA), and the commercial product evaluation of FP/PSE under purview of the Army pursuant to DoDI 3224.03. In addition, PdM FPS is responsible for: centralized management of PF/PSE for US Army users, joint service applications, and actions required to type classify such equipment developed by other services or Federal agencies for which a stated U.S. Army requirement exists; and assistance to other Services and Federal Agencies in the development and acquisition of FP/PSE systems. This includes support to the DoD Physical Security Equipment Action Group (PSEAG) and its associated working groups such as the Interagency Technical Support Working Group (TSWG). The following Technology Development (TD), Engineering and Manufacturing Development (EMD) and Other Procurement Army (OPA) funded programs/products are currently being managed or supported by PdM FPS to meet DoD specific requirements: Integrated Commercial Intrusion Detection System (ICIDS); Mobile Detection Assessment Response System (MDARS); Battlefield Anti-Intrusion System (BAIS)(AN/PRS-9); Lighting Kit, Motion Detector (LKMD)(AN/GAR-s); Force Protection Suite Project; Entry Control Point (ECP) Project; Non-Intrusive Inspection System (NIIS) Project; Rapid Deployment Integrated Surveillance System (RDISS) Project; Automated Installation Entry (AIE) Project and planning and execution of DoD Force Protection Equipment Demonstrations (FPED). Emerging requirements for which SETA support would be required include Integrated Ground Security Surveillance and Response Capability (IGSSR-C); Tactical Security System (TSS); and Tunneling Detection. The contract will be an Indefinite Delivery/Indefinite Quantity (ID/IQ) in which Task Orders may be issued and will be for a one year base period, a first option period of one year and a second option period of three months. The Government will award to the Offeror whose proposal offers the best value in terms of Technical Ability, Past Performance, and Price. The Government envisions Firm Fixed Price task orders. The guarantee minimum is anticipated to be $2,500.00 for the length of each task order (base year) and the cumulative total of all Task Orders awarded will not exceed $49,062,064.65 over the life of the contract. The Government envisions that a single award will be made; however, it reserves the right to make no award or to make multiple awards, if in the best interest of the Government. If for any reason, there are no successful proposals, or only one successful proposal, the Government reserves the right to re-open the solicitation. This will be a Service Disabled Veteran Owned Small Business set-aside. NAICS Code 541990, All Other Professional, Scientific, and Technical Services, applies with a small business size standard of $7,000,000. Proposals shall be due no later than 2:00 pm on 2 March 2012. Any questions about this requirement must be submitted in writing to Phylis Ross at phylis.g.ross @us.army.mil. All proposals shall be sent to Product Manager, Force Protection Systems, Attn: Mary Byrd, Bldg 365, Suite 1, 5900 Putnam Road, Fort Belvoir, VA 22060

Contracting Office Address:
Army Contracting Command - Natick Contracting Division, 13501 Ingenuity Drive, Ste 200, Orlando, FL 32826

Place of Performance:
Both CONUS (on-site/off-site) and OCUNUS (Afghanistan, Kuwait, Qatar and Korea) work will be performed. For CONUS work, Government furnished spaces will be provided. No GFP is identified at this time for offsite work, but may be specified at the task order level.

Point of Contact(s):
Phylis G. Ross, Contract Specialist, 407-208-5619
Patricia A. Verica, Contracting officer (407) 208-3017
ACC-APG-NCD Acquisition Center - Natick

Update #1 ·

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

The U. S. Army Contracting Command, Natick Contracting Division in support of Product Manager Force Protection Systems (PdM FPS) has a requirement for Systems Engineering and Technical Assistance (SETA) contract to provide personnel, equipment, tools, materials, supervision, and other items and non-personal services. The objective is to provide SETA support to PdM FPS during all phases of pre-acquisition, technology development (TD), engineering and manufacturing development (EMD) production and deployment, and operations and support for Force Protection/Physical Security Equipment (FP/PSE) development/non-development programs and projects to assure the development process is fully integrated with respect to design, test and evaluation, production, operation and logistic support. The primary mission of PdM FPS is research, development, acquisition (RDA), and the commercial product evaluation of FP/PSE under purview of the Army pursuant to DoDI 3224.03. In addition, PdM FPS is responsible for: centralized management of PF/PSE for US Army users, joint service applications, and actions required to type classify such equipment developed by other services or Federal agencies for which a stated U.S. Army requirement exists; and assistance to other Services and Federal Agencies in the development and acquisition of FP/PSE systems. This includes support to the DoD Physical Security Equipment Action Group (PSEAG) and its associated working groups such as the Interagency Technical Support Working Group (TSWG). The following Technology Development (TD), Engineering and Manufacturing Development (EMD) and Other Procurement Army (OPA) funded programs/products are currently being managed or supported by PdM FPS to meet DoD specific requirements: Integrated Commercial Intrusion Detection System (ICIDS); Mobile Detection Assessment Response System (MDARS); Battlefield Anti-Intrusion System (BAIS)(AN/PRS-9); Lighting Kit, Motion Detector (LKMD)(AN/GAR-s); Force Protection Suite Project; Entry Control Point (ECP) Project; Non-Intrusive Inspection System (NIIS) Project; Rapid Deployment Integrated Surveillance System (RDISS) Project; Automated Installation Entry (AIE) Project and planning and execution of DoD Force Protection Equipment Demonstrations (FPED). Emerging requirements for which SETA support would be required include Integrated Ground Security Surveillance and Response Capability (IGSSR-C); Tactical Security System (TSS); and Tunneling Detection. The contract will be an Indefinite Delivery/Indefinite Quantity (ID/IQ) in which Task Orders may be issued and will be for a one year base period, a first option period of one year and a second option period of three months. The Government will award to the Offeror whose proposal offers the best value in terms of Technical Ability, Past Performance, and Price. The Government envisions Firm Fixed Price task orders. The guarantee minimum is anticipated to be $2,500.00 for the length of each task order (base year) and the cumulative total of all Task Orders awarded will not exceed $49,062,064.65 over the life of the contract. The Government envisions that a single award will be made; however, it reserves the right to make no award or to make multiple awards, if in the best interest of the Government. If for any reason, there are no successful proposals, or only one successful proposal, the Government reserves the right to re-open the solicitation. This will be a Service Disabled Veteran Owned Small Business set-aside. NAICS Code 541990, All Other Professional, Scientific, and Technical Services, applies with a small business size standard of $7,000,000. Proposals shall be due no later than 2:00 pm on 2 March 2012. Any questions about this requirement must be submitted in writing to Phylis Ross at phylis.g.ross @us.army.mil. All proposals shall be sent to Product Manager, Force Protection Systems, Attn: Mary Byrd, Bldg 365, Suite 1, 5900 Putnam Road, Fort Belvoir, VA 22060

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity