Proactive Methodology for Identifying Problem Aerospace Parts
Closed Solicitation Posted
- Solicitation number
- AF112-208
- Agency
-
Oklahoma City Air Logistics Complex
Air Logistics Complexes, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- More information
Notice details come from DoD SBIR/STTR (DSIP). Updated .
Notice text
DoD SBIR topic AF112-208
Component: USAF
Command: OC-ALC
Phase: SBIR Program Phase I Action
Technology Areas: Materials
Keywords: Product Improvement; Cost reduction
Objective:
Develop a methodology to accurately predict/evaluate parts performance/reliability with compounding problem criteria factors for early corrective actions and acquisition of aerospace parts.
Description:
In today’s Department of Defense (DoD) aging aircraft fleet environment, the acquisition process for replacement parts are increasing in longer lead times that result in higher acquisition costs, costly repair adjustments with shorter service life while awaiting acquisition of replacements, and longer depot flow days. DoD recognizes the need to improve acquisition processes by developing a gated processes with criteria to support improved funding, risk, and alternative options for the acquisition process. One approach is the development to better predict "Bad Actor” parts before acquisition begins. A Bad Actor is a serial-numbered item that has lower life cycle service life resulting in decreased reliability, repair processes, or field maintenance activities. The development of an analysis tool is needed with the necessary methodology that can accurately identify and rank bad actors so that System Engineering best practices can be applied for corrective action before replacement acquisition is performed. This will aid in preventing common mode failures and to more accurately rank problem components. Currently, methods for ranking failing system/component (bad actors) are based either on failures or antiquated maintenance indicators (establish by the Original Equipment Manufacturer (OEM)) that if considered cumulatively could produce a projected unacceptable level of false risk. Additionally, benefits of implementing this concept can also lead to replacement of the defective part with an improved design replacement with higher service life, enhanced repair preformed, or identifying the need to change the processes used in determining field inspection/repair procedures.
Phase I:
Develop concepts to provide a methodology to identity bad actors and demonstrate examples utilizing existing sample parts. Provide details for methodology and criteria developed, any processes utilized and information systems required, and the concept analytical tools produced.
Phase II:
Further develop a prototype methodology from phase I. Provide a final report that will document validated results, measured metrics and final criteria, and benefits based on demonstration of provided requirements. A final report will be provided to the government that documents the results of the Phase II demonstrations.
Phase III:
DUAL USE COMMERCIALIZATION: Military Application: The improved processes would apply to all military aging aircraft components and systems where components have to periodically be replaced. Commercial Application: Applications should apply to various commerical aging aircraft components where components have to periodically be replaced.
Files
| File | Type | Posted |
|---|---|---|
| AF112-208.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity