Prince Jonah Kūhiō Kalanianaʻole Courtyard Inflation Reduction Act Waterproofing and Concrete Replacement – Design-Build (DB) Services

Award Notice Posted

Solicitation number
47PK0125C0004
Agency
Awarded
to Nan Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
47PK0125C0004 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Y1AZ Construction Of Other Administrative Facilities And Service Buildings
Place of performance
Honolulu, Hawaii 96850, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The General Services Administration Public Buildings Service Region 9 awarded a $10,768,113 design-build contract to Nan, Inc. for waterproofing and concrete replacement services at the Prince Jonah Kūhiō Kalanianaʻole Federal Building and Courthouse courtyard in Honolulu, Hawaii. The project addresses critical water infiltration issues that have caused flooding in the basement and threatens electrical systems, requiring a complete waterproofing solution for the exterior courtyard, playground, stairway, and accessible ramp areas. The work is partially funded by the Inflation Reduction Act and includes installation of low embodied carbon concrete paving, security walls, drainage improvements, lighting, landscaping, and fountain reinstallation while maintaining the building's historic character and full operational capacity throughout construction. The contract has a performance period of 937 calendar days to substantial completion, with the project located at 300 Ala Moana Boulevard in Honolulu.

Notice text

Contract Award: 47PK0125C0004

Awarded Contractor: Nan, Inc; J1P1SQSCUYK6

636 Laumaka St.

Honolulu, HI 96819-2312

Award Amount: $10,768,113

Place of Contract Performance: 300 Ala Moana Blvd, Honolulu, HI 96850

Description: Project Description
The Prince Jonah Kuhio Kalanianaole (PJKK) Federal Building and Courthouse in Honolulu, HI provides office space for the United States District Court for the District of Hawaii, the United States Attorney for the District of Hawaii, the United States Court of Appeals for the Ninth Circuit (Honolulu Division), the offices of Hawaii's U.S. Senators, the offices of Hawaii’s U.S. Representatives for Hawaii’s 1st congressional district and Hawaii’s 2nd congressional district,and branch offices for the federal government. The lead agencies are U.S. Judicial Courts, US Marshals, US Coast Guard, and US Attorney. Other larger tenants include DHS-CBP and ICE,
SSA, and Fish & Wildlife. Since this is the only federal building in Honolulu, there are about 60 different federal agency tenants covering both Hawaii and the Southern Pacific areas.


Over the past 40 years, the Courtyard at the PJKK Federal Building and Courthouse has experienced water infiltration from cracking of paving joints which has subjected the structural slab to corrosive action. During periods of heavy rain and high tide, flooding occurs at the Courtyard and at the basement level, presenting a threat to the subterranean electrical rooms.


This project provides upgrades to the existing paved exterior courtyard, infant/toddler
playground, exterior stairway, and accessible ramp. The intent is to provide a complete
waterproofing solution to eliminate leaks within the basement while improving the appearance of these public areas with an updated planter and landscaping design.


A Feasibility Study was completed in June 2017 and subsequently a Project Development Study was completed in April 2018. A Determination of Eligibility (DOE) report for Historic Property was completed in May 2023.


This project will be partially funded by the Inflation Reduction Act (IRA) and includes installation of low embodied carbon (LEC) concrete paving, security walls, exit stair; ramp, and planter replacement at the courtyard. Associated necessary IRA scope includes design, demolition, new waterproofing membrane, and fountain dismantling and reinstallation after completion of waterproofing and concrete paving replacement. Non-IRA funding includes courtyard drainage, site lighting & controls, fences & gates, handrails at stair & ramp, irrigation, planting and
landscaping, and replacement playground surfacing in the courtyard.


1. SUPPLEMENTAL PROJECT INFORMATION
This project requires producing design drawings and specifications that specify use of materials that will be funded in accordance with GSA’s IRA LEC Concrete Requirements. Successful project delivery will also include GSA-led consultation with Hawaii State Historic Preservation Department (SHPD) on concurrence of the final Courtyard design.


2. CONTRACT TYPE
As noted in the Agreement, this SOW is for a Firm Fixed Price (FFP) Contract.


3. OPTIONS
a. Option 1 – Not used.

b. Option 2 – Playground Shade Sail Structure
c. Option 3 – Cascade Sculptural Art – Overhanging Art Restoration Cleaning
Project Requirements


1. Provide complete waterproofing solution in the Courtyard to eliminate leaks into the
basement.
2. Improve the Courtyard exterior lighting, drainage system, and irrigation at planters.
Provide systems that will provide maximum life and require minimal maintenance.
3. Provide an accessible path of travel for emergency exit from the Courtyard without
having to reenter the building.
4. Maintain the property’s significant historic character.
5. Maintain full operations for both the Federal Building and Courthouse throughout
construction, including the public entrance to the IRS office via the courtyard.
6. Maintain site security throughout construction.
7. Minimize impact to adjacent ongoing functions at the Federal Building and Courthouse.
8. Courtyard design shall be appropriate and commensurate with the stature of the PJKK facility and the current courtyard function as an outdoor space with visual appeal for building tenants and visitors to gather and get a breath of fresh air.
9. Develop a design that is compatible and complementary in layout, materials choice and detailing to create a unified harmony between the historic and contemporary
components while still differentiating between them.
10. Seek to avoid or minimize adverse effects to the historic property, through the
development of options that meet the Secretary of the Interior’s (SOI) Standards for the
Treatment for Historic Properties.

11. Design a facility capable of adapting to the observed and expected changes in climate and safeguarding the federal investment over the intended service life.
13. Build dynamic partnerships and a cohesive team with all contracted parties and GSA, aligning goals and vision to successfully deliver this project’s scope on-time and on-budget.

This award is not set-aside for small businesses.

Period of Performance: 937 calendar days to Substantial Completion.

Awarded contract 47PK0125C0004 to Nan Inc for 10768113.00 on 2025-07-01.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors