Power Pole Replacement and Right-of-Way Clearing
Closed Solicitation Posted
- Solicitation number
- W912BV23Q0089
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237130 Power and Communication Line and Related Structures Construction
- PSC
- Y1NZ Construction Of Other Utilities
Notice details come from SAM.gov. Updated .
About this opportunity
The contractor will be responsible for the removal and replacement of 15 power poles, including all necessary accessories, and the clearing of the existing electrical service right of way through tree removal and trimming. The work is divided into a base task and two options, all to be performed at the Tenkiller Project Office location. The base task involves the removal and replacement of 12 power poles, Option 1 involves clearing approximately 1,800 linear feet of right of way, and Option 2 involves the removal and replacement of 3 power poles and the installation of a new electrical disconnect and transformer.
Products and Services:
- Removal of 15 existing power poles.
- Purchase and installation of 15 new power poles with all necessary accessories.
- Clearing of existing electrical service right of way through tree removal and trimming.
- Installation of extra guy wires to secure the entire electrical service.
- Purchase and installation of a new electrical disconnect with breaker and riser with weather head, and a pole mount pot type transformer.
Notice text
2 versions
Update #2 · Latest ·
Contractor shall be responsible for providing all supervision, labor, tools, equipment, and other incidental items (unless otherwise noted) necessary for the removal of 15 existing power poles and the purchase and reinstallation/replacement of a total of 15 new power poles, with the appropriate cross arms, insulators ,guywires, and other needed accessories. Extra guy wires will be installed to secure entire electrical service. All installation will be in accordance with state and local requirements and specifications. Power poles, accessories, disconnect, and transformer shall be new and meet current NESC industry standards. Contractor shall also be responsible for providing all supervision, labor, tools, equipment, and other incidental items (unless otherwise noted) necessary for the clearing of existing electrical service right of way by tree removal and tree trimming. These items have been divided into a BASE with TWO OPTIONS, and will be performed at the Tenkiller Project Office location: BASE - Contractor will remove 12 existing power poles. Contractor will purchase and install 12 new power poles, with all new associated cross-arms, cutouts, fuses, accessories, guy wires, anchors, etc. Extra guy wires will be installed to secure entire electrical service.? OPTION 1 - Contractor will clear approximately 1,800 linear feet of existing right of way to the appropriate width. This work will include tree removal and tree trimming. Right of way width should be to where a fallen tree or limb will not disrupt electric power service. Trees that are removed will be to ground level.? OPTION 2 - Contractor will remove 3 existing power poles. Contractor will purchase and install 3 new power poles, and all associated cross-arms, cutouts, fuses, accessories, guy wires, anchors, etc., purchase and install 1 new electrical disconnect with breaker and riser with weather head, and purchase and install 1 pole mount pot type transformer with appropriate voltage size. This is not an amendment. Rather, it is intended to rectify the oversight in omitting the Statement of Work in the release of W912BV23Q0089.
Update #1 ·
Contractor shall be responsible for providing all supervision, labor, tools,equipment, and other incidental items (unless otherwise noted) necessary for theremoval of 15 existing power poles and the purchase and reinstallation/replacementof a total of 15 new power poles, with the appropriate cross arms, insulators,guywires, and other needed accessories. Extra guy wires will be installed to secureentire electrical service. All installation will be in accordance with state and localrequirements and specifications. Power poles, accessories, disconnect, andtransformer shall be new and meet current NESC industry standards. Contractorshall also be responsible for providing all supervision, labor, tools, equipment, andother incidental items (unless otherwise noted) necessary for the clearing of existingelectrical service right of way by tree removal and tree trimming.These items have been divided into a BASE with TWO OPTIONS, and will be performed atthe Tenkiller Project Office location:BASE - Contractor will remove 12 existing power poles. Contractor will purchaseand install 12 new power poles, with all new associated cross-arms, cutouts, fuses,accessories, guy wires, anchors, etc. Extra guy wires will be installed to secureentire electrical service.? OPTION 1 - Contractor will clear approximately 1,800 linear feet of existing rightof way to the appropriate width. This work will include tree removal and treetrimming. Right of way width should be to where a fallen tree or limb will notdisrupt electric power service. Trees that are removed will be to ground level.? OPTION 2 - Contractor will remove 3 existing power poles. Contractor willpurchase and install 3 new power poles, and all associated cross-arms, cutouts, fuses,accessories, guy wires, anchors, etc., purchase and install 1 new electricaldisconnect with breaker and riser with weather head, and purchase and install 1 polemount pot type transformer with appropriate voltage size.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Tenkiller Hydropower Excitation System Replacement | ENDIST Tulsa | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity