Poplar Island – Lateral Expansion Contract 1, Poplar Island, Talbot County MD

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
w912dr-16-b-0019
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Usace District, Baltimore, 10 South Howard Street Baltimore Md 21201 USA

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

The proposed IFB procurement is UNRESTRICTED under NAICS code 237990 - Other Heavy and Civil Engineering Construction (Marine Construction). The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00.

The Government intends to solicit an Invitation for Bids for a Construction Contract to begin construction on the lateral expansion of Poplar Island. Poplar Island is located in the Chesapeake Bay between Jefferson and Coaches Islands, and is approximately 20 minutes (by boat) northwest of Tilghman Island. All expansion construction work will take place in open water off the north end of existing Poplar Island

Lateral Contract 1 work consists of foundation preparation, dike construction, and dredging. Unsuitable foundation material will be excavated by either hydraulic or mechanical dredging methods, and the areas will be backfilled via direct pipeline of material dredged from the northern access channel and turning basin or with previously stockpiled materials. Dike construction will be accomplished by hydraulic or mechanical placement using material from designated stockpile or borrow areas and includes placement of armor stone to be procured from off-site sources. Dredging of the access channel and turning basin will be accomplished by either hydraulic or mechanical methods. Suitable dredged materials will be stockpiled or used for foundation backfill and unsuitable materials will be placed in specified area(s). Optional work items include additional areas of unsuitable foundation removal and backfill and dredging of borrow sand for stockpile. Construction duration will be approximately 400 calendar days.

The solicitation will be posted on FedBizOpps (FBO) at www.fbo.gov on or about 7 July 2016.

For information concerning the North American Industry Classification System (NAICS), go to http://www.census.gov/cgi-bin/sssd/naics/naicsrch?chart=2007.

Interested contractors must be registered with the System for Award Management (SAM) database to receive a government contract award. You may register with SAM at https://www.sam.gov/portal/public/SAM/.

Update #2 ·

The proposed IFB procurement is UNRESTRICTED under NAICS code 237990 - Other Heavy and Civil Engineering Construction (Marine Construction). The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00.

The Government intends to solicit an Invitation for Bids for a Construction Contract to begin construction on the lateral expansion of Poplar Island. Poplar Island is located in the Chesapeake Bay between Jefferson and Coaches Islands, and is approximately 20 minutes (by boat) northwest of Tilghman Island. All expansion construction work will take place in open water off the north end of existing Poplar Island

Lateral Contract 1 work consists of foundation preparation, dike construction, and dredging. Unsuitable foundation material will be excavated by either hydraulic or mechanical dredging methods, and the areas will be backfilled via direct pipeline of material dredged from the northern access channel and turning basin or with previously stockpiled materials. Dike construction will be accomplished by hydraulic or mechanical placement using material from designated stockpile or borrow areas and includes placement of armor stone to be procured from off-site sources. Dredging of the access channel and turning basin will be accomplished by either hydraulic or mechanical methods. Suitable dredged materials will be stockpiled or used for foundation backfill and unsuitable materials will be placed in specified area(s). Optional work items include additional areas of unsuitable foundation removal and backfill and dredging of borrow sand for stockpile. Construction duration will be approximately 400 calendar days.

The solicitation will be posted on FedBizOpps (FBO) at www.fbo.gov on or about 7 July 2016.

For information concerning the North American Industry Classification System (NAICS), go to http://www.census.gov/cgi-bin/sssd/naics/naicsrch?chart=2007.

Interested contractors must be registered with the System for Award Management (SAM) database to receive a government contract award. You may register with SAM at https://www.sam.gov/portal/public/SAM/.

Update #1 ·

The proposed IFB procurement is UNRESTRICTED under NAICS code 237990 - Other Heavy and Civil Engineering Construction (Marine Construction). The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00.

The Government intends to solicit an Invitation for Bids for a Design-Bid-Build Construction Contract to begin construction on the lateral expansion of Poplar Island. Poplar Island is located in the Chesapeake Bay between Jefferson and Coaches Islands, and is approximately 20 minutes (by boat) northwest of Tilghman Island. All expansion construction work will take place in open water off the north end of existing Poplar Island

Lateral Contract 1 work consists of foundation preparation, dike construction, and dredging. Unsuitable foundation material will be excavated by either hydraulic or mechanical dredging methods, and the areas will be backfilled via direct pipeline of material dredged from the northern access channel and turning basin or with previously stockpiled materials. Dike construction will be accomplished by hydraulic or mechanical placement using material from designated stockpile or borrow areas and includes placement of armor stone to be procured from off-site sources. Dredging of the access channel and turning basin will be accomplished by either hydraulic or mechanical methods. Suitable dredged materials will be stockpiled or used for foundation backfill and unsuitable materials will be placed in specified area(s). Optional work items include additional areas of unsuitable foundation removal and backfill and dredging of borrow sand for stockpile. Construction duration will be approximately 400 calendar days.

The solicitation will be posted on FedBizOpps (FBO) at www.fbo.gov on or about 7 July 2016.

For information concerning the North American Industry Classification System (NAICS), go to http://www.census.gov/cgi-bin/sssd/naics/naicsrch?chart=2007.

Interested contractors must be registered with the System for Award Management (SAM) database to receive a government contract award. You may register with SAM at https://www.sam.gov/portal/public/SAM/.

Notice history

Notice Type Posted
Poplar Island Lateral Expansion Contract 1, Poplar Island, Talbot County MD Award Award Notice
This notice Latest pre-solicitation Pre-Solicitation
Poplar Island – Lateral Expansion Contract 1/ Talbot County, MD Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors