Poplar Island Cell 6 and Cell 11 Dike Raisings
Closed Solicitation Posted
- Solicitation number
- W912DR24B0006
- Agency
-
ENDIST Baltimore
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Baltimore District is seeking to award a firm-fixed-price construction contract for the Poplar Island Cell 6 and Cell 11 Dike Raisings project. The proposed project involves using approximately 300,000 cubic yards of stockpiled sand to raise the existing containment cell dikes on Poplar Island in Talbot County, Maryland. The primary purpose is to raise the Cell 6 sand dike from +25 feet to +30 feet, and the secondary purpose is to raise a portion of the Cell 11 sand bench by 3-5 feet. All work must be completed within 430 calendar days. The solicitation is being procured via an Invitation for Bid (IFB) under FAR 14, Sealed Bidding.
This procurement is set aside for small businesses. The Government Estimate for the total base bid is $16,825,192, and the lowest responsive bid received was $8,900,435. The work will be performed within Cells 4, 6, 1D, and 11 of the remote Poplar Island site, which is only accessible by boat. Any remaining sand from the Cell 4 stockpile that is not used in the raisings will be hauled to another stockpile on the island.
Notice text
FY24 Poplar Island Cell 6 and Cell 11 Dike Raisings. The USACE Baltimore District has been tasked to solicit for and award a construction contract for the Poplar Island Cell 6 and Cell 11 Dike Raisings project. The proposed project will be a competitive, firm-fixed-price contract procured in accordance with FAR 14, Sealed Bidding, via an Invitation for Bid (IFB). Poplar Island is an ecosystem restoration project located in the upper-middle Chesapeake Bay in Talbot County, Maryland, approximately 39 miles south-southeast of the Port of Baltimore and two miles northwest of Tilghman Island. The overall scope of this project is to use approximately 300,000 cubic yards of stockpiled sand to raise two existing containment cell dikes on the island. The primary purpose of this contract is to raise the entire Cell 6 sand dike (approximately 14,000 linear feet) from an elevation of +25 feet to +30 feet. The work will be completed by manually hauling sand from an on-site sand stockpile located in an adjacent Cell 4. The secondary purpose of this contract is to use remaining sand in the Cell 4 stockpile to raise a portion of the Cell 11 sand bench (approximately 15,000 linear feet) by approximately three to five feet. All newly placed sand dike and bench sections will be shaped, compacted, and seeded with native grasses. Any remaining sand from the Cell 4 stockpile that is not used in the raisings will be hauled to another stockpile on the island, located approximately 1.8 miles north in Cell 1D. All work will be performed within Cells 4, 6, 1D, and 11 of Poplar Island, a remote location accessible only by boat. The Contractor shall provide all necessary labor, equipment, materials, and transportation to perform the construction. The anticipated period of performance is approximately 430 calendar days.
Files
| File | Type | Posted |
|---|---|---|
| Abstract of Bids W912DR24B0006 Poplar Island Cell 6 and Cell 11.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Poplar island cell 6 and cell 11 dike raisings, talbot county, MD | Pre-Solicitation | |
| Poplar island cell 6 and cell 11 dike raisings, talbot county, MD | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Mid-Bay James Island Restoration Phase 2 | ENDIST Baltimore | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity