Pompey Pillar National Monument Rock Stabilization
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140L3623R0001
- Agency
- Bureau of Land Management Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Bureau of Land Management Billings, Montana 59101, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Bureau of Land Management intends to solicit proposals to stabilize multiple areas located at Pompey's Pillar National Monument near Billings, Montana. Work will include installation of geotechnical instrumentation, testing and placement of rockbolts, anchors and micropiles, shotcrete, drainage controls and erosion prevention measures. A single award will be made based on best value per the Federal Acquisition Regulation's Tradeoff Procedures. Proposals are due February 18, 2023 to the BLM Montana State Office.
This total small business set-aside contract is estimated between $1,000,000 to $5,000,000 under NAICS code 237990 for Specialty Trade Contractors. The successful contractor must commence work within 10 days of notice to proceed on or around May 29, 2023 and complete all work by October 19, 2023. Christine Mundt of the BLM is the point of contact for any questions at cmundt@blm.gov or 406-896-5030.
Notice text
The Department of Interior, Bureau of Land Management (BLM), Montana State Office intends to solicit proposals for construction activities to the stabilization of multiple areas located on the Pompey's Pillar National Monument Site in accordance with the technical specification, appendices, and drawings. The project work is located near Billings, Montana in Yellowstone County.
BLM will issue Solicitation Number 140L3623R0001 via https://sam.gov/content/opportunities, at the link provided in this notice. The principal components of the work to be performed include, but are not limited to:
* Installation of geotechnical instrumentation including vibrating wire strain gauges on rockbolts, borehole pressure gauges, and vibrating wire crack gauges with remote datalogging and transmitting capabilities.
* Installation and testing of rockbolts and anchors for verification of design assumptions.
* Installation of cement grouted micropiles.
* Installation of cement anchored rockbolts and anchors.
* Protection of natural resources within the project construction limits.
* Protection of cultural resources within the project construction limits.
* Selective removal of trees and vegetation on site to facilitate construction and minimize future rock joint deterioration.
* Placement of dry-packed cemented-based mortars to stabilize deteriorating and eroding shale joints.
* Selective scaling of rock surfaces.
* Installation and maintenance of erosion and sedimentation control measures.
* Installation of reinforced structural and architectural shotcrete.
* Installation of structural steel support posts.
* Installation of concrete curbs, membranes and other related drainage controls.
Pursuant to Part 15 and Part 36 of the Federal Acquisition Regulations, BLM intends to issue a Request for Proposal (RFP) on or around January 4, 2023. The estimated price range of this acquisition is between $1,000,000 and $5,000,000. BLM anticipates issuing the RFP under the total small business set-aside program. The applicable North American Industry Classification System (NAICS) Code is 237990 and the associated Small Business Size Standard is $39.5 Million.
A single contract award will be made to the offeror that submits a proposal that has been determined to be the best value based on the Tradeoff Procedures within the Federal Acquisition Regulations. A firm-fixed priced contract is contemplated. Proposals will be due on or around February 18, 2023, at BLM's Montana State Office, 5001 Southgate, Billings, Montana. Offerors may submit electronic proposals as a response to the anticipated solicitation. Electronic proposals will be subject to the same rules as paper proposals.
The Government anticipates award of this procurement on or around May 19, 2023. The successful contractor will be required to commence work within 10 calendar days after the date the Contractor receives the notice to proceed (on or around May 29, 2023) and complete the entire work ready for use within 143 calendar days (October 19, 2023). The time stated for completion shall include final cleanup of the premises.
For further information about the requirement, offerors should contact Christine Mundt at cmundt@blm.gov or at (406) 896-5030.
All prospective contractors must be registered in the System for Award Management (SAM) to be eligible for award. If you have not updated SAM since October of 2020, you are advised to update early to be sure you are in compliance with the expanded Section 889 prohibitions on not using certain covered technology products.
The successful contractor shall electronically submit all payment requests for the anticipated contract through the U.S. Department of the Treasury's Invoice Processing Platform (IPP). If the contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the contractor must submit a waiver request in writing to the Contracting Officer with its offer.
Attachments
| File | Type | Posted |
|---|---|---|
| PSN-PPNM_Rock_Stabilization_1.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Ppnm rock stabilization | Award Notice | |
| Ppnm rock stabilization | Solicitation | |
| Pompey Pillar National Monument Rock Stabilization | Pre-Solicitation |