PN- 92754 - Brant Hall Repairs, Ft. Gordon Georgia

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912HN22B3003
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation from the Department of the Army Corps of Engineers Savannah District seeks renovation and repair work for Brant Hall at Fort Gordon, Georgia. The scope of work includes upgrading building systems and infrastructure to support classrooms and labs for instruction. Renovations and repairs are needed for insulation, interior finishes, ceilings, roofing, plumbing, HVAC, electrical, fire detection and alarm systems. Connectivity to utility monitoring and IT/security systems must also be provided. The independent government estimate for work is $20,195,729. Proposals were due by September 15th and will be evaluated with award determined to be in the best interest of the government.

There is no set-aside designated for this procurement. The primary NAICS code is 238210 and PSC code S206. The abstract of offers lists a response range from $42,328.43 to -$20,195,729 with all bids over 99% below the independent estimate. Renovations are to be completed within the existing building footprint to support 16 classrooms, 13 labs, 7 classrooms and 2 labs, and 22 classrooms and 3 labs along with necessary support spaces totaling approximately 75,000 square feet. Work must be finished and facilities ready to support training by the period of performance.

Notice text

2 versions

Update #2 · Latest ·

The renovation of Brant Hall will take place within its existing footprint. Space planning standards will be used to govern the space allocation for the instructors, students, and circulation space. The U Wing will consist of 16 classroom and 13 Labs. The V1 wing will have 7 classrooms and 2 labs. The V2 wing will have 22 Classrooms and 3 labs. The classrooms and labs will be both 750SF and 1500SF and some will have removable dividers. For more detail on the architectural layout see the attached floorplan. The following systems are in need of repair to restore the building?s life span and bring the building in compliance with current code. These systems include Insulation, interior finishes, drop ceilings, EPDM roofing, plumbing, restroom fixture and finishes, HVAC duct and HVAC controls, electrical wiring, electrical service and distribution, fire detection and alarm systems, utility monitoring and control system, and building information systems. When determined to be more cost efficient, these scoped items shall be repaired by replacement. All Passive IT infrastructure shall be included in the scope of this project. When turned over to the client all classroom and lab workstations shall be ready to receive MUE and other project equipment. The project will provide the pathways and infrastructure to accommodate electronic security systems. The project shall improve vehicle access into the 2 outside training areas next to the facility. The project abates hazardous materials in compliance with the Current Army Regulations. These materials include asbestos containing materials as well as lead-based paint. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B3003' to obtain more details.*

Update #1 ·

The renovation of Brant Hall will take place within its existing footprint. Space planning standards will be used to govern the space allocation for the instructors, students, and circulation space. The U Wing will consist of 16 classroom and 13 Labs. The V1 wing will have 7 classrooms and 2 labs. The V2 wing will have 22 Classrooms and 3 labs. The classrooms and labs will be both 750SF and 1500SF and some will have removable dividers. For more detail on the architectural layout see the attached floorplan. The following systems are in need of repair to restore the building?s life span and bring the building in compliance with current code. These systems include Insulation, interior finishes, drop ceilings, EPDM roofing, plumbing, restroom fixture and finishes, HVAC duct and HVAC controls, electrical wiring, electrical service and distribution, fire detection and alarm systems, utility monitoring and control system, and building information systems. When determined to be more cost efficient, these scoped items shall be repaired by replacement. All Passive IT infrastructure shall be included in the scope of this project. When turned over to the client all classroom and lab workstations shall be ready to receive MUE and other project equipment. The project will provide the pathways and infrastructure to accommodate electronic security systems. The project shall improve vehicle access into the 2 outside training areas next to the facility. The project abates hazardous materials in compliance with the Current Army Regulations. These materials include asbestos containing materials as well as lead-based paint.

For additional details, visit: 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B3003' 

Files

Notice history

Notice Type Posted
PN- 92754 - Brant Hall Repairs, Ft. Gordon Georgia Award Award Notice
This notice Latest solicitation Solicitation
PN- 92754 - Brant Hall Repairs, Ft. Gordon Georgia Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Building 262 Renovation, FLETC Glynco, Georgia Georgia 31524, United States · NAICS 236220 Federal Law Enforcement Training Center Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors