Playground Zipline Demolition
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 647ABGZiplineDemo
- Agency
-
Pacific Air Forces
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238910 Site Preparation Contractors
- Place of performance
- Hawaii 96818, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
Pacific Air Forces' 766th Enterprise Sourcing Squadron is conducting market research to identify small business sources for specialized demolition and site restoration of a zip line structure at the "Field of Dreams" playground at Joint Base Pearl Harbor Hickam, with responses due by May 29, 2026. This is a Total Small Business set-aside.
Work is performed at the playground located between Vickers and Worthington on JBPHH. The contractor shall remove all zip line equipment by cutting at the concrete footer or removing surface mount bolts and anchors, preserve existing concrete footers and curbing undamaged, reinstall foam underlayment, patch specialized turf surfacing to eliminate tripping and fall hazards per CPSC Public Playground Safety Handbook standards, and remove all scrap materials from the installation. All work must be completed within 90 calendar days of contract award.
Respondents must demonstrate precision demolition experience, specialized playground safety surfacing capability, regulatory compliance familiarity with CPSC and OSHA/EPA standards, and current DBIDS clearance for personnel. Hawaii state General Engineering (A) or Specialty (C-24) licensing is required. The contractor must provide all personnel, equipment, tools, materials, supervision, and transportation. Work requires AF Form 103 clearance from Base Civil Engineering prior to any digging and AF Form 3000 submittals for material approval. Project invoices are submitted through WAWF within 30 days of completion and final inspection.
Interested firms shall submit a capability statement not exceeding five pages (PDF or Word) demonstrating experience with precision demolition and playground safety surfacing, including two past-performance examples from the last five years and bonding capacity information. This sources sought is for market research only and does not constitute a commitment to award.
Notice text
1.0 DISCLAIMER
This Sources Sought is for informational and market research purposes only in accordance with FAR Part 10. THIS IS NOT A REQUEST FOR PROPOSAL (RFP), REQUEST FOR QUOTATION (RFQ), OR INVITATION FOR BID (IFB). This notice does not constitute a commitment by the Government to issue a solicitation or award a contract. The Government will not pay for any effort expended or any material provided in response to this announcement. Note: Any future solicitation may be issued subject to the Availability of Funds (FAR 52.232-18).
2.0 BACKGROUND AND OBJECTIVE
The 766th Enterprise Sourcing Squadron (766 ESS) is conducting market research to identify potential and eligible small business sources capable of performing specialized demolition and site restoration at the "Field of Dreams" playground located between Vickers and Worthington on JBPHH.
The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to perform the following:
-
Remove all zip line equipment.
-
Cut equipment at the top of the concrete footer OR remove surface mount bolts and anchors.
-
Ensure existing concrete footers, safety surfacing, and curbing remain intact and undamaged.
-
Reinstall foam/buffings underlayment to restore site integrity.
-
Patch specialized turf surfacing to provide a smooth surface completely free of tripping and fall hazards in accordance with the Consumer Product Safety Commission (CPSC) Public Playground Safety Handbook.
-
Remove and properly dispose of all demolished and scrap materials off the installation.
3.0 SUBMISSION INSTRUCTIONS
Interested firms are requested to complete the attached Capability Statement (Attachment 1). Responses should clearly demonstrate the firm's experience with precision demolition and specialized playground safety surfacing.
-
Page Limit: Maximum of five (5) pages.
-
Format: PDF or Microsoft Word.
Files
| File | Type | Posted |
|---|---|---|
| Field of Dreams Zip Line Removal - SOW.docx | DOCX document | |
| Capability Statement Zip Line Demolition.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Playground Zipline Demolition | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Construct Egress Maintenance Facility, F-22 | Army National Guard | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity