Pine Valley Reservoir Toe Drain

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1284N819R0010
Agency
Region 4 - Intermountain Region Forest Service, Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Pine Valley Reservoir From the North Follow I-15 S to UT-56 W/W 200 N in Cedar City. Take exit 59 from I-15 S Continue on UT-56 W. Take Bench Rd, UT-18 S and Pine Valley Hwy E to FH 035/Pine Valley Recreation Area Rd in Washington County From the South (St. George, UT area) Follow I-15 N and UT-18 N to E Center St/Pine Valley Hwy E Follow Pine Valley Hwy E to FH 035/Pine Valley Recreation Area Rd Pine Valley, Utah 84781, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

***Ammendment 2***
The purpose of this amendment is to address questions, answers, clarifications and incorporate pictures from the Site Visit which was held on June 11, 2019.
Proposal due date remains the same of Tuesday, July 9, 2019 at 1:00 PM Mountain Time.
.

Update #2 ·

The Dixie National Forest in Utah anticipates installing a Toe Drain at Pine Valley Reservoir.


Project is located at the Pine Valley Reservoir within the Pine Valley Recreation Area. The location is searchable in commonly used free navigation apps.



The project consists of:


Installing a toe drain at the Pine Valley Dam as shown in the construction drawings. It also includes slope excavation, grouted riprap placement and spillway masonry repair This project requires the Contractor to supply all labor, materials, equipment, tools, transportation, freight and delivery, as well as all necessary licenses and permits required to complete the project in reasonably close conformity with the drawings and specification, and in accordance with the provisions of the contract.



A Site Visit will be held on Tuesday, June 11, 2019 at 9:00 AM at Pine Valley Reservoir


Per FAR 36.204 the estimated price range is estimated to be between $250,000 and $500,000


This project is a total Small Business Set Aside.


Three (3) copies of the offeror proposal must be submitted



All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition.



SAM REGISTRATION REQUIREMENTS: Prospective contractors must be registered in the System for Award Management (SAM) prior to award www.sam.gov.




***The purpose of this amendment is to correct the date for the site visit to June 11, 2019 at 9:00 AM at Pine Valley Reservoir***

.

Update #1 ·

The Dixie National Forest in Utah anticipates installing a Toe Drain at Pine Valley Reservoir.


Project is located at the Pine Valley Reservoir within the Pine Valley Recreation Area. The location is searchable in commonly used free navigation apps.



The project consists of:


Installing a toe drain at the Pine Valley Dam as shown in the construction drawings. It also includes slope excavation, grouted riprap placement and spillway masonry repair This project requires the Contractor to supply all labor, materials, equipment, tools, transportation, freight and delivery, as well as all necessary licenses and permits required to complete the project in reasonably close conformity with the drawings and specification, and in accordance with the provisions of the contract.



A Site Visit will be held on Tuesday, July 9, 2019 at 9:00 AM at Pine Valley Reservoir


Per FAR 36.204 the estimated price range is estimated to be between $250,000 and $500,000


This project is a total Small Business Set Aside.


Three (3) copies of the offeror proposal must be submitted



All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition.



SAM REGISTRATION REQUIREMENTS: Prospective contractors must be registered in the System for Award Management (SAM) prior to award www.sam.gov.

.

Attachments

Show all 11

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Pine Valley Reservoir Toe Drain Award Award Notice
Pine Valley Reservoir Toe Drain This notice · Latest solicitation Solicitation
Pine Valley Reservoir Toe Drain Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity