PiggyBack Crane Repairs

Closed Solicitation Posted

Solicitation number
W9123726QA039
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Meldahl Locks and Dam 2443 US Highway 52, Felicity, OH 45120

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Engineering District Huntington seeks crane repair services at Meldahl Locks and Dam, with proposals due July 10, 2026. This procurement is a Total Small Business set-aside.

Work consists of replacing the hydraulic swivel coupling and trolley hydraulic hoses on the piggyback crane, furnishing all labor, equipment, access, and materials. The contractor must replace existing brackets with draw chains using only new components and is responsible for proper handling, maintenance, storage, and protection of all materials and equipment until installation and acceptance. The contractor shall test the crane post-installation to ensure it operates without further issues, remedy any deficiencies discovered, and retest until the crane returns to service. Prior to work initiation, the contractor must secure all crane operating machinery, immobilize all components to prevent damage, and de-energize the crane system before removal. Coordination with project personnel on Lock-Out Tag-Out procedures is required.

Place of performance is Meldahl Locks and Dam, Felicity, Ohio. The NAICS code is 811310, Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance. The PSC code is J039, Maint/Repair/Rebuild Of Equipment—Materials Handling Equipment.

Notice text

This work consists of furnishing all labor, equipment, access, and materials for replacing the hydraulic swivel coupling and trolley hydraulic hoses that operate the hydraulic swivel coupling on the piggyback crane meeting the requirements of this specification at Meldahl Locks and Dam. The existing brackets shall be replaced by the contractor with draw chains. All components shall be new. The Contractor shall be responsible for the proper handling, maintenance, storage and protection of all materials and equipment until installed and accepted. Once all these items are installed, the Contractor shall test the crane to ensure the crane operates without further issues to these components. Contractor shall remedy any issues and retest until the crane is returned to service. Prior to any work being performed, the Contractor shall ensure that all crane operating machinery is properly secured and all components immobilized to prevent damage. The crane system must be de-energized prior to removal. Coordinate with the Project Personnel to properly Lock-Out Tag-Out (LOTO) the equipment being serviced. See attached photographs for further details.

Similar open opportunities

Opportunity Agency Set-aside Responses due
Repair/Replace Overhead Cranes on Fort Drum Fort Drum, New York 13602, United States · NAICS 811310 MICC Fort Drum Total Small Business
Wolf creek powerhouse bridge crane rehabilitation Jamestown, Kentucky, United States · NAICS 333923 ENDIST Nashville No set-aside
Amff LINE1 crane 2 replacement Warner Robins, Georgia 31098, United States · NAICS 333923 Air Force Sustainment Center No set-aside
Building 19 Crane Rail Assessment Naval Surface Warfare Center Carderock DIVISION9500 MacArthur Blvd, West Bethesda, MD 20817 20817 · NAICS 811310 Naval Sea Systems Command Total Small Business
Material Handling Equipment (MHE) and Industrial Equipment (IE) Maintenance and Repair Services South El Monte, CA 91733 91733 · NAICS 811310 ENDIST Los Angeles Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors