Phase I Pre-Qualifications for Runway Repair and Airfield Lighting RFP
Closed Solicitation Posted
- Solicitation number
- W912ER26R0014
- Agency
-
ENDIST Middle East
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Kingdom of Jordan
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Middle East seeks establishment of a pre-qualified contractor pool for runway repair and airfield lighting work at an undisclosed location in the Kingdom of Jordan, with Phase 1 pre-qualification proposals due July 10. This is a full and open competition; only contractors pre-qualified in Phase 1 will receive the Phase 2 RFP for award of a firm-fixed price Design-Bid-Build contract to a single contractor.
Place of performance is Jordan. The scope requires replacement of 13,504 square meters of Portland Cement Concrete pavement and 13,354 square meters of asphalt with new, modified-heavy load concrete to extend the military runway touchdown zone, plus associated lighting and markings replacement. All work must comply with International Civil Aviation Organization standards. The selected firm must demonstrate capability to perform civil works, specifically earthwork, runway construction, and runway repair within the Kingdom of Jordan. A secondary scope element is design-after-award work for the Aircraft Arresting System Absorber Shelters foundational structure. The period of performance is 540 calendar days after issuance of the Notice to Proceed. NAICS code is 237310, Highway, Street, and Bridge Construction; PSC code is Z2BD, Repair or Alteration of Airport Runways and Taxiways. Phase 2 evaluation will use best value trade-off procedures under FAR Part 15 and Part 36. The proposal due date has been extended from the original posting to increase competition; previously submitted proposals need not be resubmitted.
Notice text
2 versions
Update #2 · Latest ·
Update: The Contracting Officer has determined through additional market research that extending the proposal due date/time for the Phase 1 Pre-Qualification RFP to increase competition is in the best interest of the Government. If an interested contractor has already submitted a proposal, they are not required to re-submit it. The SWM intends to issue a RFP and award a firm-fixed price (FFP) Design-Bid-Build (DBB) contract to a single contractor after the establishment of a prequalified pool of contractors on a full and open competition basis (Phase 1 ? Establish a Pre-Qualification Pool of Contractors). Only the pre-qualified contractors included within the limited competition pool will receive the Phase 2 RFP ? Runway Repair and Airfield Lighting). The United States Government (USG) will evaluate the received Phase 2 proposals using the best value trade off source selection procedures in accordance with (IAW) Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 15 - Contracting by Negotiation and RFO Part 36 - Construction and Architect-Engineer Contracts. The project site is located at an undisclosed location within the Kingdom of Jordan. The SWM is evaluating the ability of businesses to perform a comprehensive pavement repair and replacement of concrete pavement at an undisclosed location in the Kingdom of Jordan. The main effort requires replacing 13,504 Square Meters (SM) of Portland Cement Concrete (PCC) pavement and 13,354 SM of asphalt with new, modified-heavy load concrete to extend the touchdown zone of the military runway. This work, which must comply with International Civil Aviation Organization (ICAO) standards, includes replacing associated lighting and markings. The selected firm must have the capability to perform Civil Works, specifically earthwork, runway construction, and runway repair within the Kingdom of Jordan. A secondary part of the scope is design-after-award work for which the contractor will design and construct the foundational structure for the Aircraft Arresting System (AAS) Absorber Shelters. The period of performance is 540 calendar days on the awarded project which starts after issuance of the Notice to Proceed (NTP). Performance Period: The anticipated period of performance is 540 calendar days after issuance of the notice to proceed. Attachments: This notice does not include any attachments. Points of Contact: The points of contact for this notice are Jerry O. Andes II at Jerry.O.Andes@usace.army.mil or (540) 665-3777 and Diane E. deLathouder at Diane.E.deLathouder@usace.army.mil or (540) 665-3615.
Update #1 ·
The SWM intends to issue a RFP and award a firm-fixed price (FFP) Design-Bid-Build (DBB) contract to a single contractor after the establishment of a prequalified pool of contractors on a full and open competition basis (Phase 1 ? Establish aPre-Qualification Pool of Contractors). Only the pre-qualified contractors included within the limited competition pool will receive the Phase 2 RFP ? Runway Repair and Airfield Lighting). The United States Government (USG) will evaluate the received Phase 2 proposals using the best value trade off source selection procedures in accordance with (IAW) Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 15 - Contracting by Negotiation and RFO Part 36 - Construction and Architect-Engineer Contracts. The project site is located at an undisclosed location within the Kingdom of Jordan.The SWM is evaluating the ability of businesses to perform a comprehensive pavement repair and replacement of concrete pavement at an undisclosed location in the Kingdom of Jordan. The main effort requires replacing 13,504 Square Meters (SM) of Portland Cement Concrete (PCC) pavement and 13,354 SM of asphalt with new, modified-heavy load concrete to extend the touchdown zone of the military runway. This work, which must comply with International Civil Aviation Organization (ICAO) standards, includes replacing associated lighting and markings. The selected firm must have the capability to perform Civil Works, specifically earthwork, runway construction, and runway repair within the Kingdom of Jordan. A secondary part of the scope is design-after-award work for which the contractor will design and construct the foundational structure for the Aircraft Arresting System (AAS) Absorber Shelters. The period of performance is 540 calendar days on the awarded project which starts after issuance of the Notice to Proceed (NTP). Performance Period: The anticipated period of performance is 540 calendar days after issuance of the notice to proceed. Attachments: This notice does not include any attachments. Points of Contact: The points of contact for this notice are Jerry O. Andes II at Jerry.O.Andes@usace.army.mil or (540) 665-3777 and Diane E. deLathouder at Diane.E.deLathouder@usace.army.mil or (540) 665-3615.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Touchdown 08 Airfield Pavement Repair and Replacement | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity