Parachute Packing Press
Open Pre-Solicitation Posted
- Solicitation number
- N6833526Q1223
- Agency
-
Naval Air Warfare Center
Naval Air Systems Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy's Naval Air Systems Command, Naval Air Warfare Center, intends to procure one Parachute Packing Press Model GSU-449/E (PN COM00150-1; NSN 1670-99-555-6604) on a sole-source basis, with responses due December 3, 2026. No set-aside is used. The Government cites 10 U.S.C. 2304(c)(1) and FAR 6.302-1(b)(1), stating that only one responsible source and no other supplies or services will satisfy agency requirements.
The item supports the F/A-18 Kuwait Classic program for a Foreign Military Sales partner. The Government states that a different part number would require funding a Preliminary Design Review, Critical Design Review, First Article Test, and Test & Evaluation effort for a new vendor, along with changes to Integrated Logistics Support estimated at $100,000 to $150,000. Market research was performed by the Lakehurst Technical team and identified no other vendors.
The latest update identifies the Original Equipment Manufacturer as Martin Baker (CAGE U1604). Its CONUS branch (CAGE 1Q842) does not supply this item within the states. Martin Baker has two authorized distributors, Allied Defense Industries (CAGE 0GD25) and Integrated Procurement Technologies (CAGE 4K0V2/05ZJ1), and owns the proprietary engineering data and detailed product drawings. The Government recommends a sole-source, firm-fixed-price procurement to Allied Defense Industries (CAGE 0GD25).
Notice text
3 versions
Update #3 · Latest ·
UPDATED/CORRECTED:
This effort is for the procurement of (1) Parachute Packing Press Model GSU-449/E (PN: COM00150-1; NSN: 1670-99-555-6604) for the F/A-18 Kuwait Classic program.
Under authority 10 U.S.C.2304(c)(1) and implemented in FAR 6.302-l(b)(l), to try to develop this “asset" would incur costs that are not expected to be recouped through competition. Any attempt to procure a different part number would require the Government to fund a Preliminary Design Review (PDR) Critical Design Review (CDR) First Article Test (FAT) and Test & Evaluation (T&E) effort for a new vendor. The Government would have to fund personnel to be on the Source Selection Team to review proposals. Any change in form, fit or function would require changes to the existing Integrated Logistics Support (ILS) (technical publications, spares inventory, calibration) which would incur additional costs for update in the amount of $100,000 to $150,000. The process required to obtain an alternate asset is cost-prohibitive and would force the FMS Partner to utilize an asset that is not supported, compatible or interchangeable with the USN-approved configuration. Hence, the FMS partner would forfeit the fundamental benefits granted per the signed Letter of Acceptance (LOA).
This requirement will be processed under the authority 10 U.S.C.2304(c)(1), only one responsible source and no other supplies or services will satisfy agency requirements. Market Research was performed by the Lakehurst Technical team. The Original Equipment Manufacturer (OEM) of this item is Martin Baker, CAGE: U1604. The CONUS branch of Martin Baker (1Q842) does not supply this item within the states. Martin Baker has only two authorized distributors, Allied Defense Industries, CAGE: 0GD25 and Integrated Procurement Technologies, CAGE: 4K0V2/05ZJ1. Martin Baker owns all of the proprietary rights to the engineering data and detailed product drawings. No additional vendors were identified through market research. As such, we recommend a limited competition, firm-fixed price procurement between the OEM Martin Baker and their authorized distributors, Allied Defense Industries, CAGE: 0GD25 and Integrated Procurement Technologies, CAGE: 4K0V2/05ZJ1.
Update #2 ·
UPDATED/CORRECTED:
This effort is for the procurement of (1) Parachute Packing Press Model GSU-449/E (PN: COM00150-1; NSN: 1670-99-555-6604) for the F/A-18 Kuwait Classic program.
Under authority 10 U.S.C.2304(c)(1) and implemented in FAR 6.302-l(b)(l), to try to develop this “asset" would incur costs that are not expected to be recouped through competition. Any attempt to procure a different part number would require the Government to fund a Preliminary Design Review (PDR) Critical Design Review (CDR) First Article Test (FAT) and Test & Evaluation (T&E) effort for a new vendor. The Government would have to fund personnel to be on the Source Selection Team to review proposals. Any change in form, fit or function would require changes to the existing Integrated Logistics Support (ILS) (technical publications, spares inventory, calibration) which would incur additional costs for update in the amount of $100,000 to $150,000. The process required to obtain an alternate asset is cost-prohibitive and would force the FMS Partner to utilize an asset that is not supported, compatible or interchangeable with the USN-approved configuration. Hence, the FMS partner would forfeit the fundamental benefits granted per the signed Letter of Acceptance (LOA).
This requirement will be processed under the authority 10 U.S.C.2304(c)(1), only one responsible source and no other supplies or services will satisfy agency requirements. Market Research was performed by the Lakehurst Technical team. The only known manufacturer of this item is Martin Baker and there authorized distributor, Allied Defense Industries, CAGE: 0GD25. Allied Defense Industries owns all of the proprietary rights to the engineering data and detailed product drawings. No other vendors were identified through market research. As such, we recommend a sole-source, firm-fixed price procurement to Allied Defense Industries, CAGE: 0GD25.
Update #1 ·
This effort is for the procurement of (1) Parachute Packing Press Model GSU-449/E (PN: COM00150-1; NSN: 1670-99-555-6604) for the F/A-18 Kuwait Classic program.
Under authority 10 U.S.C.2304(c)(1) and implemented in FAR 6.302-1(b)(1)(i), this authority shall be used when the program needs can only be satisfied from only one source with unique capabilities. Any attempt to procure a different part number would require the Government to fund a Preliminary Design Review (PDR) Critical Design Review (CDR) First Article Test (FAT) and Test & Evaluation (T&E) effort for a new vendor. The Government would have to fund personnel to be on the Source Selection Team to review proposals. Any change in form, fit or function would require changes to the existing Integrated Logistics Support (ILS) (technical publications, spares inventory, calibration) which would incur additional costs for update in the amount of $200,000 to $250,000. The process required to obtain an alternate asset is cost-prohibitive and would force the FMS Partner to utilize an asset that is not supported, compatible or interchangeable with the USN-approved configuration.
This requirement will be processed under the authority FAR 6.302-1(b)(1)(i), whereby only one source with unique capability can supply the requested item. Market Research was performed by the Lakehurst Technical team. The Original Equipment Manufacturer of these items is Allied Defense Industries | Cage 0GD25. The US Government does have some technical data rights (e.g., drawings), but is unable to compete this request due to specific proprietary items to Eaton within the design of the end item. Acquisition Method Code: 3H - acquire directly from the manufacturer/US GOV does not have sufficient data. No additional market research was conducted for the reasons discussed above, and as such, it is the Governmnt's intention to conduct the repair procurement on a sole-source basis to Allied Defense Industries | Cage 0GD25.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Ejection Seat Cable Assembly | Naval Air Warfare Center | No set-aside | |
| N0038326PR0R483_FMS | Naval Supply Systems Command | No set-aside | |
| Panel, indicator, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| Support, structural, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| Panel assembly | Naval Supply Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity