Pack Creek Road Decommissioning II
Awarded Award Notice Posted
- Solicitation number
- AG-02RC-S-14-0083
- Agency
- Region 1 - Northern Region Forest Service, Department of Agriculture
- Awarded
- to Cat Tracks, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG-02RC-P-14-0208 Federal contract award
- NAICS code
- 115310 Support Activities for Forestry
- PSC
- Not on record
- Place of performance
- The project is located approximately 100 miles Northeast of Kooskia, Idaho. From Kooskia, Idaho travel east on US Highway 12 to Lolo Pass Visitor Center (Montana Border). Turn right off of US Highway 12 onto FS Road 373. Travel approximately 0.7 miles on FS Road 373 to junction of FS Road 373A to the right. Turn onto FS Road373A and travel 0.3miles to the beginning of project at the junction of Road 860944 ( Staked As 5955-T2) Left., United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Added: Jul 10, 2014 6:00 pm Six offers received.
Update #2 ·
Added: May 19, 2014 3:10 pm Modified: Jun 19, 2014 3:33 pmTrack Changes The Packer Creek Road Decommissioning project consists of decommissioning approximately 15-20 miles of roads, and several spur roads. Main Access roads are also scheduled to be decommissioned and put into Intermittent Storage for future use. Road decommissioning treatments range from outslopes to complete recontouring. Roadways will be decompacted as described in drawings and worklists. All fill material in draws will be removed and stream channels restored to natural grade and dimensions. All disturbed areas will be seeded. In addition, native forbs and shrubs will be transplanted from areas adjacent to the road. Grade control structures will be constructed in newly reconstructed stream channels.
Update #1 ·
Added: May 19, 2014 3:10 pm The Packer Creek Road Decommissioning project consists of decommissioning approximately 20-22 miles of roads, and several spur roads. Main Access roads are also scheduled to be decommissioned and put into Intermittent Storage for future use. Road decommissioning treatments range from outslopes to complete recontouring. Roadways will be decompacted as described in drawings and worklists. All fill material in draws will be removed and stream channels restored to natural grade and dimensions. All disturbed areas will be seeded. In addition, native forbs and shrubs will be transplanted from areas adjacent to the road. Grade control structures will be constructed in newly reconstructed stream channels.
Attachments
| File | Type | Posted |
|---|---|---|
| Pack_Creek_Rd_Decommisioining_Appendix_A_(Specifications).doc | DOC document | |
| Nez_Perce-Clearwater_NF_-_Pack_Creek_II_Rd_Decommissioning_(AG-02RC-S-14-0083).doc | DOC document | |
| Pack_Creek_Rd_Decommissioning_Drawings.pdf | ||
| Pack_Creek_Road_Decomm_II_(Location_Map).pdf |