Ouachita river basin – ouachita river blakely mountain DAM – intake service bridge maintenance and repainting

Closed Solicitation Posted

Solicitation number
W912EE23B0010
Agency
Responses due
Set-aside
Woman-Owned Small Business

Opportunity facts

Place of performance
Arkansas, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks offers to perform maintenance and repainting work on the bridge superstructure and bearings of the Blakely Mountain Dam Intake Structure Service Bridge in Garland County, Arkansas. The work includes mobilization, abrasive blasting, repainting of the bridge, and environmental protection measures. The solicitation was issued by the U.S. Army Corps of Engineers Vicksburg District. Bids are due by May 3, 2023 and will be evaluated based on responsiveness, responsibility, and price. The estimated value of the contract is between $1,000,000 and $5,000,000.

This is a women-owned small business set-aside designated under NAICS 237310 and PSC J-36. The place of performance is Garland County, Arkansas. The solicitation was amended to increase the estimated value from $250,000-$500,000 to $1,000,000-$5,000,000. Drawings of the bridge and additional specifications are provided to support offerors in preparing proposals for this requirement.

Notice text

3 versions

Update #3 · Latest ·

The work consists of furnishing all plant, labor, materials and equipment, and repainting the bridge
superstructure and bearings of the Blakely Mountain Dam Intake Structure Service Bridge in Garland County, Arkansas.
Principal features of work include mobilization and demobilization, abrasive blasting, repainting of bridge, and environmental
protection. The estimated value of the proposed work is between $250,000 and $500,000. Drawings are forthcoming. An amendment has been issued to reflect the provision for the site visit.

Update #2 ·

The work consists of furnishing all plant, labor, materials and equipment, and repainting the bridge
superstructure and bearings of the Blakely Mountain Dam Intake Structure Service Bridge in Garland County, Arkansas.
Principal features of work include mobilization and demobilization, abrasive blasting, repainting of bridge, and environmental
protection. The estimated value of the proposed work is between $250,000 and $500,000. Drawings are forthcoming.

Update #1 ·

The work consists of furnishing all plant, labor, materials and equipment, and repainting the bridge
superstructure and bearings of the Blakely Mountain Dam Intake Structure Service Bridge in Garland County, Arkansas.
Principal features of work include mobilization and demobilization, abrasive blasting, repainting of bridge, and environmental
protection. The estimated value of the proposed work is between $1,000,000 and $5,000,000. Drawings are forthcoming.

Files

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Ouachita River Basin, Ouachita River Blakely Mountain Dam, Intake Service Bridge Maintenance and Repainting Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors