Ouachita Pier Repair
Closed Solicitation Posted
- Solicitation number
- 70Z02925QNEWO0010
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- 5530 Plywood And Veneer
- Place of performance
- Chattanooga, Tennessee 37416, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Coast Guard is seeking a small business contractor to perform pier repair services at the CGC Ouachita facility located in Chattanooga, Tennessee. The solicitation (70Z02925QNEWO0010) requires comprehensive pier restoration, specifically focusing on replacing damaged and degraded wooden decking to improve safety and extend the pier's operational lifespan. Contractors must eliminate tripping hazards, replace deteriorated lumber and hardware, and thoroughly clean work areas upon completion. Proposals are due by March 17, 2025, at 15:00 local time, with contractors expected to begin work within 10 days of notice to proceed and complete the entire project within 30 calendar days. Key evaluation considerations will include the contractor's ability to submit a comprehensive safety plan within 7 days of award, provide a detailed work schedule, and coordinate effectively with the Coast Guard point of contact, Daniel Collard.
The contract is a total small business set-aside with a NAICS code of 237990 and a size standard of $35 million, with an estimated project value between $25,000 and $100,000. The project includes specific workforce participation goals of 12.5% minority and 6.9% female representation. Contractors must adhere to U.S. Army Corps of Engineers safety requirements and OSHA regulations, with particular attention to hazards associated with working over water. The place of performance is specifically at the Coast Guard facility in Chattanooga, Tennessee (ZIP 37416), where the government will provide electricity and potable water utilities. Contractors are required to maintain daily cleanup, handle material deliveries, and coordinate any utility interruptions at least two working days in advance, ensuring minimal disruption to ongoing operations.
Notice text
- REPLACE DAMAGED/DEGRADED WOOD ON THE PIER TO PROLONG LIFE OF PIER AND IMPROVE SAFETY BY ELIMINATING TRIPPING HAZARDS
- CHECK FOR PROPER LUMBER/HARDWARE REPLACEMENT
- CLEAN UP WORK AREAS.
- CHECK OUT WITH COAST GUARD SITE REPRESENTATIVE UPON COMPLETION.
Files
| File | Type | Posted |
|---|---|---|
| 70Z02925QNEWO0010_0_US (1).pdf | ||
| SOW Pier Repair.pdf | ||
| Attachment A.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Drydock repairs for the CGC patoka | — | No set-aside | |
| USCG STA coos BAY (47302-47242) FY27 DD repair | — | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity