Notice text

3 versions

Update #3 · Latest ·

It is the intent of the US Army Corps of Engineers, Detroit District, to extend for no more than six months the existing sole-source firm-fixed price contract to Fishbeck, Thompson, Carr and Huber, Inc. (FTC&H) of Grand Rapids, Michigan. FTC&H has performed operations and maintenance (O&M) on the Ott-Story facility for over ten years, and has the experience necessary to continue performance for an additional six months with significant savings to the Government. O&M tasks for this facility include, but are not limited to:


(a) Maintain the groundwater monitoring system and collect and analyze samples in accordance with the Contractor's approved Sampling and Analysis Plan (SAP) which consists of two main parts : Quality Assurance Project Plan (QAPP) and a Field Sampling Plan (FSP). These documents to be prepared and submitted for approval;
(b) Achieve and maintain desired flows from each groundwater extraction well to the groundwater treatment system;
(c) Inspect the extraction and treatment system to determine maintenance requirements;
(d) Operate and maintain the groundwater treatment facility to achieve desired effluent water quality criteria in accordance with the NPDES permit;
(e) Operate and maintain the air pollution control systems to meet all air emission criteria as developed by the State of Michigan;
(f) Operate and maintain the sludge dewatering equipment to achieve an effective and efficient solids management program and provide for a service to transport and dispose of dewatered sludge;
(g) Perform all required and preventative maintenance of facility equipment;
(h) Maintain all system operating records in the existing electronic database; and
(i) Accurately prepare and submit all documentation and reports as required directly to the State of Michigan and/or the USEPA and/or the USACE in accordance with the mandated timeframes.


Any responsible source who believes it is capable of meeting this requirement may submit a capability statement not-to-exceed two pages to Thomas McKay at LRE-Quotes@usace.army.mil by the response date stated on this notice. A determination not to compete the proposed requirement based upon the responses to this notice is solely within the discretion of the Government.


 

Update #2 ·

This contract action was accomplished using other than competitive procedures because there is only one responsible source as this is a follow-on contract, and no other supplies or services will satisfy agency requirements (FAR 6.302-1). See posted J&A for further information.

The awarded contract is for the operation and maintenance of a unique ground water treatment facility (GWTF), including an extensive extraction well preventive maintenance program that has been operating for over 13 years. The sole purpose of the GWTF is to remove existing contamination from the groundwater. The treated groundwater is discharged three miles south of the GWTF into the North Branch of the Muskegon River. The GWTF consists of an extraction well system, the treatment plant, effluent discharge and monitoring wells. The site is on the USEPA Superfund National Priority List (NPL). The NPL consists of the nations worst contaminated sites.

Update #1 ·

This contract action was accomplished using other than competitive procedures because there is only one responsible source as this is a follow-on contract, and no other supplies or services will satisfy agency requirements (FAR 6.302-1). See posted J&A for further information.

The awarded contract is for the operation and maintenance of a unique ground water treatment facility (GWTF), including an extensive extraction well preventive maintenance program that has been operating for over 13 years. The sole purpose of the GWTF is to remove existing contamination from the groundwater. The treated groundwater is discharged three miles south of the GWTF into the North Branch of the Muskegon River. The GWTF consists of an extraction well system, the treatment plant, effluent discharge and monitoring wells. The site is on the USEPA Superfund National Priority List (NPL). The NPL consists of the nations worst contaminated sites.

Notice history

Notice Type Posted
Operation and Maintenance of the Ott-Story Groundwater Treatment Facility at Dalton Township, Michigan Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors