O¿Donnell Dam Stabilization and Erosion Control
Closed Solicitation Posted
- Solicitation number
- 140L6426R0001
- Agency
-
Arizona Region
Bureau of Land Management, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
Notice details come from SAM.gov. Updated .
About this opportunity
The Bureau of Land Management Arizona Region seeks quotes for O'Donnell Dam Stabilization and Erosion Control work at O'Donnell Creek in Las Cienegas National Conservation Area, Santa Cruz County, Arizona, with quotes due October 12 at 5:00 PM MDT (amended from October 9). The procurement is a 100% Total Small Business Set-Aside under FAR Part 13 simplified acquisition, NAICS 237990.
Place of performance is Las Cienegas National Conservation Area, Arizona. Work runs from October 30, 2026 through May 30, 2028. The contractor must stabilize an active headcut, protect an existing fish barrier, and reduce erosion using hand tools only—no powered equipment permitted. All work must occur between October 15 and April 1 annually to avoid bird breeding season. Rock materials must be sourced from The Nature Conservancy's Canelo Hills Preserve approximately 0.5 miles from site and transported by hand or wheelbarrow only. Primary tasks include constructing one Zuni bowl headcut stabilization structure (approximately 55 cubic yards), installing three to four one-rock-high grade control structures, installing one media luna sheet-flow spreader, acquiring and transporting materials, and performing year-two seeding and maintenance with BLM-approved locally sourced native species. Deliverables include a work plan due within 15 days of award, as-built documentation, year-two seeding and maintenance report, and final project summary report due within 30 days of completion.
The estimated magnitude is between $25,000 and $100,000, firm fixed-price. Prevailing wage rates apply per Department of Labor determinations for Arizona construction. Performance and payment bonds are required within 10 days of award. Quoters must be registered in SAM at submission and award. Mandatory site visit is September 15 at 9:00 AM MST; RSVP required by September 13. Questions due September 23 at 12:00 PM MST. Evaluation weighs technical approach, past experience, past performance, and price approximately equally.
Notice text
O'Donnell Dam Stabilization and Erosion Control
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity