Occupant Sensor Suite for Blast Events
Closed Solicitation Posted
- Solicitation number
- A12-059
- Agency
-
PEO Ground Combat Systems
Acquisition Support Center, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- More information
Notice details come from DoD SBIR/STTR (DSIP). Updated .
Notice text
DoD SBIR topic A12-059
Component: ARMY
Command: PEO GCS
Phase: SBIR Program Phase I Action
Technology Areas: Electronics; Sensors
Keywords: Mine; IED; Blast; seat; sensors; black box; occupant; protection; safety; sensor; accelerometers; Data; Recorder
Objective:
Currently no method exists to record occupant data from combat vehicles during blast events, desired end product is a universal occupant sensor suite to record blast data in any vehicle.
Description:
The Tank Automotive Research Development and Engineering Center’s (TARDEC) survivability group has identified the lack of accurate battlefield data from blast events as a significant gap in the design of occupant protection systems. By accurately monitoring blast events on the battlefield, research can focus on counteracting threats as they emerge. In contrast, our current method entails performing blast experiments at test centers to simulate different scenarios that may or may not accurately represent actual threats.
The Army does not have an accurate model of an occupant during a blast event for threats encountered on the battlefield. Data acquired from the Occupant Sensor Suite will improve modeling predictions of occupant sustained blast events. This is turn will lead to the development of dynamic models that can establish key design parameters throughout all occupant protection design activity.
Phase I:
Phase I consists of an investigation of the aspects (forces, displacements, etc.) sustained by the occupant during a blast event. The most critical aspects, considered system inputs, will be identified. The inputs shall provide sufficient data to accurately model and analyze the human response for designing future occupant protection systems. Formulas and calculations shall be documented. The following aspects shall be consider in sensor selection: High fidelity (Able to record data at required sample rate), Max Life (Up to 20 years), Connectivity to Army's Vehicle Data Recorder, Operating Conditions/Temperatures, Calibrationless, Low cost (Target: $100 per seat, Acceptable: <$500, Minimum Requirement : <$1000). Study shall detail locations of sensors and plan for mass integration into Army Platforms. Recommended platform is the MRAP, but any currently fielded seat from any Army Combat Vehicle can be referenced with Government approval.
Phase II:
A fully functional seat demonstrator is expected upon completion of Phase II contract. SEAT: Contractor must select a seat that meets Government POC’s approval. Government approval is needed to ensure seat is representative of occupant seats found throughout the Army. REPORT: Report shall include the following: (1) SENSORS: Sensors used with specifications, purpose/output of sensors, general locations of sensors (to address varying types of seats and vehicles). (2) DATA ANALYSIS: Detailed information regarding filtering of data and/or post processing methods for data analysis. Report shall include how to incorporate the data acquired into useful data for modeling or design parameters. This includes formulas that were needed for conversion into English Units, adjusting accelerometer axis on angled surfaces, etc. Include computer code used for processing. (3) TESTING VERIFICATION: Report shall provide details on test setup, operation, and results. Verification of the accuracy and reasonability of test results must be documented. A Government Subject Matter Expert (SME) can verify reasonability of test results, contact your POC for a suitable SME. Accuracy can be proved by calibration certificates and/or calibration test results. If needed, Selfridge Air National Guard Base located in Southeast Michigan has a drop tower that simulates blast events. Please contact the Government POC regarding scheduling and costs associated with testing.
ADDITIONAL INFORMATION: If during the Phase II work period an SME finds the sensor suite or the data insufficient, such as not providing useful data or information, the contractor has the ability to readdress the issue and retest within the Phase II time frame. The Occupant Sensor Suite shall be integrated into an actual vehicle seat and connected to the Vehicle Blast Data Recorder. Contact the POC for more information regarding the Vehicle Blast Data Recorder. Overall results of Phase II are the effective communications with the Vehicle Blast Data Recorder, seat integration, and the usefulness of the results. If no Vehicle Blast Data Recorder is available, contractor may develop his own Data Collection System that meets the requirements of the Vehicle Blast Data Recorder.
Phase III:
Occupant Sensor Suite can be implemented on all seat positions on all ground combat vehicles (US Army, Marines, etc.) to evaluate emerging occupant threats. The Sensor Suite will serve as an additional and critical input to the Army led Vehicle Blast Data Recorder. Technology can be integrated into other unique systems as a method to evaluate ride quality. Technology can be inserted into the automotive industry, racing industry, and aviation to evaluate their particular occupant aspects.
Files
| File | Type | Posted |
|---|---|---|
| A12-059.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity