NV FLAP 400(1), Logandale Trails Access Road

Closed Pre-Solicitation Posted

This opportunity was awarded. See its 2 award notices in the notice history.

Solicitation number
6982AF24B000020
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Logandale, Nevada 89021, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Transportation Federal Highway Administration is seeking contractors for the NV FLAP 400(1), Logandale Trails Access Road project in Logandale, Nevada. The project consists of approximately 3 miles of roadway construction, including excavation, aggregate base, asphalt concrete paving, concrete curb, barrier, and minor concrete pavement. Key requirements include the use of a desert tortoise biologist during construction. The project is expected to be advertised in August 2024, with construction starting in February 2025 and finishing in October 2025. The estimated cost range for the project is between $10,000,000 and $20,000,000.

This opportunity is not set-aside for any specific business size or type. The agency has not provided information about any incumbent contractors or the project's budget breakdown. The principal work items include 45,000 cubic yards of roadway excavation, 20,000 cubic yards of waste, 16,000 tons of aggregate base, 10,000 tons of asphalt concrete pavement, 4,500 linear feet of concrete curb, 1,200 linear feet of concrete barrier, and 1,100 square yards of minor concrete pavement.

Notice text

2 versions

Update #2 · Latest ·

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE

THIS WILL BE ADERVTISED AS FULL AND OPEN COMPETITION. 

PROJECT NUMBER and NAME:  NV FLAP 400(1), LOGANDALE TRAILS ACCESS ROAD

PROJECT DESCRIPTION:

The project is in Logandale, Nevada in Clark County located 58 miles north east of Las Vegas, Nevada.  The project begins on the west side of town and ends at the parking area for Logandale Trails, which is part of Nevada State Parks. The terrain is mostly rolling with elevation varying from 1,400 to 1,830 feet. The project consists of 4R work.

The project consists of roadway construction of approximately 3 miles with some large cuts and fills. The roadway will then get aggregate base and paved. Other elements of work include construction on low water crossings protected by concrete barrier and riprap then topped with concrete pavement. A desert tortoise biologist will be required at different stages of construction.

PRINCIPAL WORK ITEMS: Major items of work for the project include the following:

  • Roadway Excavation – 45,000 CUYD
  • Waste – 20,000 CUYD
  • Aggregate Base – 16,000 TON
  • Asphalt Concrete Pavement – 10,000 TON
  • Curb, Concrete – 4,500 LNFT
  • Concrete barrier – 1,200 LNFT
  • Minor Concrete Pavement – 1,100 SQYD

ANTICIPATED SCHEDULE: 

Advertise: August 2024

It is anticipated construction will start approximately February 2025 and finish approximately October 2025.

ESTIMATED COST RANGE:  The anticipated cost range is between $10,000,000 and $20,000,000.

This will be advertised as full and open competition. 

Update #1 ·

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE

PROJECT NUMBER and NAME:  NV FLAP 400(1), LOGANDALE TRAILS ACCESS ROAD

PROJECT DESCRIPTION:

The project is in Logandale, Nevada in Clark County located 58 miles north east of Las Vegas, Nevada.  The project begins on the west side of town and ends at the parking area for Logandale Trails, which is part of Nevada State Parks. The terrain is mostly rolling with elevation varying from 1,400 to 1,830 feet. The project consists of 4R work.

The project consists of roadway construction of approximately 3 miles with some large cuts and fills. The roadway will then get aggregate base and paved. Other elements of work include construction on low water crossings protected by concrete barrier and riprap then topped with concrete pavement. A desert tortoise biologist will be required at different stages of construction.

PRINCIPAL WORK ITEMS: Major items of work for the project include the following:

  • Roadway Excavation – 45,000 CUYD
  • Waste – 20,000 CUYD
  • Aggregate Base – 16,000 TON
  • Asphalt Concrete Pavement – 10,000 TON
  • Curb, Concrete – 4,500 LNFT
  • Concrete barrier – 1,200 LNFT
  • Minor Concrete Pavement – 1,100 SQYD

ANTICIPATED SCHEDULE: 

Advertise: August 2024

It is anticipated construction will start approximately February 2025 and finish approximately October 2025.

ESTIMATED COST RANGE:  The anticipated cost range is between $10,000,000 and $20,000,000.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
ND FLAP SDN 7NE(1) Hoffer Lake Access Latest Award Notice
NV FLAP 400(1), Logandale Trails Access Road Award Notice
NV FLAP 400(1), Logandale Trails Access Road Latest solicitation Solicitation
NV FLAP 400(1), Logandale Trails Access Road This notice Pre-Solicitation
NV FLAP 400(1), Logandale Trails Access Road Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity