NV BLM 10(1) red rock canyon scenic loop drive & parking areas

Award Notice Posted

Solicitation number
DTFH6816B00020
Agency
Awarded
to Las Vegas Paving Corporation
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6816C00032 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Red Rock Canyon National Conservation Area, Nevada 89161, United States

Notice details come from SAM.gov. Updated .

Notice text

THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENATIVE ADVERTISEMENT DATE IS JULY 2016. THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS


Project Number: NV BLM 10(1)


Project Name: Red Rock Canyon Scenic Loop Drive and Parking Areas


Project Description:


The work will be located at Red Rock Canyon National Conservation Area in Nevada. The Scenic Loop Drive and Parking Areas improvements will occur at the following locations: along the 12.5 mile Scenic Loop Drive, along 0.5 miles of Rocky Gap Road, at 12 parking areas along the route, and along 2.4 miles of a new alignment between Sandstone Quarry and the Visitor Center. The project includes pavement rehabilitation of the roadways, expansion of the parking areas, and a new route to reduce the travel length.


Schedule A (12.9 miles in length) - Pavement Rehabilitation of Scenic Loop Drive, Rocky Gap Road, and Calico 1 Parking Lot Expansion


Significant items include (approximate quantities subject to change):
• 35,300 Tons Asphalt Concrete Pavement
• 180,500 SY Full Depth Reclamation
• 18,900 LF Curb, Asphalt
• 3,820 CY Embankment Construction
• 3,900 SF Reinforced Concrete Retaining Wall



Schedule B includes Schedule A and 11 Parking Areas - Parking Expansion at All Other Areas


Significant items include (approximate quantities subject to change):
• 6,000 Tons Asphalt Concrete Pavement
• 17,000 SY Full Depth Reclamation
• 2,300 SF Reinforced Concrete Retaining Wall



Option X (2.42 miles in length) - New Alignment for Return Route from Sandstone Quarry to Visitor Center


Significant items include (approximate quantities subject to change):
• 6,900 Tons Asphalt Concrete Pavement
• 15,500 CY Embankment Construction
• 191 CY Structural Concrete


It is anticipated this project will be advertised in July 2016 with construction beginning in August 2016 and extending through September 2017.

The contracting range for this project is $8,000,000 to $13,000,000.


 

Notice history

Notice Type Posted
NV BLM 10(1) Red Rock Canyon Scenic Loop Drive & Parking Areas Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors