NRP, FWD airstair as, in repair/modification of
Closed Solicitation Posted
- Solicitation number
- N0038325QT301
- Agency
-
Naval Supply Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Supply Systems Command is seeking a repair contract for a commercial off-the-shelf (COTS) item for the P8 aircraft, specifically an NRP, FWD AIRSTAIR AS. The solicitation requires repair services exclusively from Original Equipment Manufacturers (OEM), aircraft prime contractors, or suppliers with FAA-Certified parts possessing an FAA Authorized Released Certificate. Quotes must be submitted via email to Dylan.e.payne.civ@us.navy.mil by 4:30 PM EST on June 5, 2025, with firms required to provide firm fixed prices. The government will evaluate quotes based on technical acceptability, price, Repair Turnaround Time (RTAT), and past performance, with the intent to make a single award to the most advantageous offeror. If only one acceptable quote is received, the competitive procedure will shift to sole source negotiations.
This solicitation is not set aside for any specific business category and covers aircraft parts repair with specific technical requirements. The contract demands a 90-day repair turnaround time and allows for early and incremental deliveries. Contractors must provide notification of all proposed engineering changes and maintain FAA certification standards, with an induction expiration date of 365 days after contract award. All repairs must be accompanied by an FAA Form 8130-3 Airworthiness Approval Tag, and the contractor must use SAE-AS22759 series wire instead of MIL-W-81381 wire. The monthly throughput constraint and specific repair details will be negotiated, with a reconciliation modification to be issued after final inspection and acceptance of all inducted assets.
Notice text
2 versions
Update #2 · Latest ·
CONTACT INFORMATION|4|N791.07|T1J|215-697-2579|dylan.e.payne.civ@us.navy.mil|
COMMERCIAL PRODUCT PROCUREMENT NOTICE|5||||||
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice Receiving Report (Combo)||TBD|N00383|TBD|TBD|See Schedule|TBD|||||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||
CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVEORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2025)(DEVIATION 2025-O|81||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
CUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2025)(DEVIATION|16|||||||||||||||||
SERVICES (MAR 2025)(DEVIATION 2025-O0003))|3||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||
ROYALTY INFORMATION (APR 1984)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025) (DEVIATION 2025-O0003)|12|336413|1250|||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||DO-A1|
EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)|4|Past Performance|RTAT|Price|More Important than Price|
The Required RTAT is updated from 90 days to 60 days after receipt of asset.
Offerors are instructed to submit Firm Fixed Prices for any quote submittal.
All quotes must include both a repair price and an overhaul price. Any quotes that do not include both a repair and overhaul price will not be considered.
The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to
evaluate offers, in the following order of importance:
1) Past Performance
2) RTAT
3) Price
Technical and past performance, when combined, are more important than price.
Quotes received after the closing date are considered to be late and will notbe considered for award.
\
This solicitation is for a repair of a commercial off the shelf (COTS) item forthe P8 aircraft.
This solicitation will be using competitive procedures.
Offerors are instructed to submit Firm Fixed Prices for any quote submittal.
Quotes may be emailed to the below address and must be received by 04:30PM EST on the closing date, listed in block 10 on page 1 of this solicitation:
Dylan.e.payne.civ@us.navy.mil
Quotes received after the closing date are considered to be late and will not be considered for award.
If only one acceptable quote is received in response to this solicitation, competitive procedures will shift to sole source negotiations.
This requirement can only be repaired from Original Equipment Manufacturer (OEM), aircraft prime, or suppliers who provide Federal Aviation Administration (FAA)-Certified parts which possess an FAA Authorized Released Certificate, FAA Form 8130-3 Airworthy
Approval Tag from certified repair stations pursuant to 14 CFR Part 145.
All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile,
or sent by other electronic commerce methods, such asemail. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
Early and incremental deliveries accepted.
The Government intends to make a single award to the eligible, responsible quoter whose quote is technically acceptable and which is determined most advantageous to the Government, price , RTAT, and past performance considered.
Addendum to FAR 52.212-4 Contract Terms and Conditions
Commercial Items
In addition to paragraph (a), "Inspection and Acceptance", add the following:
1. The contractor shall provide notification to the government of all proposed engineering changes that effect components managed under this contract. No changes shall be made without written authorization from the government for any change which will or may
affect:
a) Interchangeability, performance, weight, safety, reliability, service life, fit, form, function, and maintainability; or
b) Federal Aviation Administration (FAA) type certification
c) Require part re-identification for any reason
2. The change notification shall include at a minimum the affected parts number(s) and a required approval date in order to maintain current contractual performance requirements. The contractor shall make available to the government any commercially available
change documentation such as Service Bulletins or Original Equipment Manufacturer Product Line Change Notifications.
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular
business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.
Required RTAT: 90 days after receipt of asset
Throughput Constraint: Contractor must provide a throughput Constraint for eachNSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint.
Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.
Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such
pricesare based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.
\
1. SCOPE
1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document.
1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be
provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this
procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer.
1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by
IPC/EIAJ-STD-001C paragraph 5.1.4.
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS
ITEM SHOULD BE REPAIRED IN ACCORDANCE WITH VENDOR REPAIR MANUALS AND RETURNED
TO (RFI) READY FOR ISSUE CONDITION. VENDOR CONDUCTING REPAIR MUST BE AN
APRROVED FAA REPAIR FACILITY.
ALL REPAIRS MUST BE ACCOMPANIED BY FAA FORM 8130-3 AIRWORTHINESS APPROVAL
TAG,EUROPEAN AVIATION SAFETY AGENCY (EASA) FORM 1 OR EQUIVALENT COC.
4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.
5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
ALL REPAIRS MUST BE ACCOMPANIED BY FAA FORM 8130-3 AIRWORTHINESS APPROVAL
TAG,EUROPEAN AVIATION SAFETY AGENCY (EASA) FORM 1 OR EQUIVALENT COC.
Update #1 ·
CONTACT INFORMATION|4|N791.07|T1J|215-697-2579|dylan.e.payne.civ@us.navy.mil|
COMMERCIAL PRODUCT PROCUREMENT NOTICE|5||||||
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice Receiving Report (Combo)||TBD|N00383|TBD|TBD|See Schedule|TBD|||||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||
CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVEORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2025)(DEVIATION 2025-O|81||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
CUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2025)(DEVIATION|16|||||||||||||||||
SERVICES (MAR 2025)(DEVIATION 2025-O0003))|3||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||
ROYALTY INFORMATION (APR 1984)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025) (DEVIATION 2025-O0003)|12|336413|1250|||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||DO-A1|
This solicitation is for a repair of a commercial off the shelf (COTS) item forthe P8 aircraft.
This solicitation will be using competitive procedures.
Offerors are instructed to submit Firm Fixed Prices for any quote submittal.
Quotes may be emailed to the below address and must be received by 04:30PM EST on the closing date, listed in block 10 on page 1 of this solicitation:
Dylan.e.payne.civ@us.navy.mil
Quotes received after the closing date are considered to be late and will not be considered for award.
If only one acceptable quote is received in response to this solicitation, competitive procedures will shift to sole source negotiations.
This requirement can only be repaired from Original Equipment Manufacturer (OEM), aircraft prime, or suppliers who provide Federal Aviation Administration (FAA)-Certified parts which possess an FAA Authorized Released Certificate, FAA Form 8130-3 Airworthy
Approval Tag from certified repair stations pursuant to 14 CFR Part 145.
All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile,
or sent by other electronic commerce methods, such asemail. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
Early and incremental deliveries accepted.
The Government intends to make a single award to the eligible, responsible quoter whose quote is technically acceptable and which is determined most advantageous to the Government, price , RTAT, and past performance considered.
Addendum to FAR 52.212-4 Contract Terms and Conditions
Commercial Items
In addition to paragraph (a), "Inspection and Acceptance", add the following:
1. The contractor shall provide notification to the government of all proposed engineering changes that effect components managed under this contract. No changes shall be made without written authorization from the government for any change which will or may
affect:
a) Interchangeability, performance, weight, safety, reliability, service life, fit, form, function, and maintainability; or
b) Federal Aviation Administration (FAA) type certification
c) Require part re-identification for any reason
2. The change notification shall include at a minimum the affected parts number(s) and a required approval date in order to maintain current contractual performance requirements. The contractor shall make available to the government any commercially available
change documentation such as Service Bulletins or Original Equipment Manufacturer Product Line Change Notifications.
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular
business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract.
Required RTAT: 90 days after receipt of asset
Throughput Constraint: Contractor must provide a throughput Constraint for eachNSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint.
Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.
Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such
pricesare based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation.
\
1. SCOPE
1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document.
1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be
provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this
procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer.
1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by
IPC/EIAJ-STD-001C paragraph 5.1.4.
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS
ITEM SHOULD BE REPAIRED IN ACCORDANCE WITH VENDOR REPAIR MANUALS AND RETURNED
TO (RFI) READY FOR ISSUE CONDITION. VENDOR CONDUCTING REPAIR MUST BE AN
APRROVED FAA REPAIR FACILITY.
ALL REPAIRS MUST BE ACCOMPANIED BY FAA FORM 8130-3 AIRWORTHINESS APPROVAL
TAG,EUROPEAN AVIATION SAFETY AGENCY (EASA) FORM 1 OR EQUIVALENT COC.
4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.
5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
ALL REPAIRS MUST BE ACCOMPANIED BY FAA FORM 8130-3 AIRWORTHINESS APPROVAL
TAG,EUROPEAN AVIATION SAFETY AGENCY (EASA) FORM 1 OR EQUIVALENT COC.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| NRP, FWD airstair as, in repair/modification of | Pre-Solicitation | |
| 1680 - 016442529 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| NRP, FWD airstair as- and similar replacement parts, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| Solicitation QTY 1 7RH 1680 015855262 P8 | Naval Supply Systems Command | No set-aside | |
| NRP, module assembly, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| NRP, ussr, aircraft, M, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| NRP, spoiler assy -, in repair/modification of | Naval Supply Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity