About this opportunity

The Army Corps of Engineers, Louisville District, published a Special Notice on March 25, 2026, announcing its intent to award a sole source contract to Sandhills Utility Service, Inc. for the construction of a microgrid system at Fort Bragg Special Operations Training Facility in North Carolina. The notice is issued in compliance with federal procurement regulations and serves to inform the contracting community of this sole source determination. The project involves substantial infrastructure development with an estimated value exceeding $50 million and a performance period of 990 calendar days. The opportunity is classified under NAICS Code 237130 (Power and Communication Line and Related Structures Construction) with a size standard of $45 million.

The microgrid construction project aims to enhance energy security and resilience at Fort Bragg by developing a black-start capable system that can island from the main grid during outages, ensuring continuity of mission-essential operations. The system will integrate a 4-megawatt fixed-tilt ground-mounted photovoltaic solar array, a minimum 6-megawatt energy storage system, and a new 6-megawatt diesel generator with fuel storage and polishing capabilities, along with associated control systems and underground electrical infrastructure. Interested parties must submit information by the April 9, 2026 deadline. The sole source justification is based on Sandhills Utility Service, Inc.'s position as the sole local utilities provider for Fort Bragg, as they own and operate the existing utility infrastructure to which the new microgrid must connect. This project represents a critical infrastructure modernization effort for the Department of Defense installation, requiring seamless integration with the current power delivery systems.

Notice text

In compliance with RFO 5.101 coupled with the guidance set forth by RFO DFARS PGI 206.103-170(d) this Notice for Request for Information is hereby published to inform of the following:

The Louisville District intends to award a sole source contract to Sandhills Utility Service, Inc for services to construct a microgrid system at Fort Bragg Special Operations Training Facility in North Carolina that includes a 4-Megawatt (MW) fixed-tilt ground-mounted photovoltaic (PV) solar array, a minimum 6MW/ Energy Storage System (ESS), and a new 6MW diesel generator(s) with fuel storage and a fuel polishing system. The system will feature a master controller, synchronization controllers, automatic transfer switches, transformers, reclosers, inverters, rectifiers, and underground electrical infrastructure. It will be installed on a closed restricted network (CRN), and isolating switches will interface with the existing Supervisory Control and Data Acquisition (SCADA) system. Protective relay controls will be added to the existing 6MW diesel generators. The applicable Size Standard is North American Industry Classification System (NAICS) Code 237130, with a size standard of 45,000,000.00. Estimated period of performance is 990 calendar days. Construction magnitude is more than $50,000,000.00.

The construction of the microgrid system will require integration into the utility service provider’s extant power infrastructure. The microgrid is designed to provide extended backup power by islanding from the main grid during an outage. Installing this black-start capable microgrid at Fort Bragg will greatly improve the energy security and resilience of the installation and will significantly increase the ability to ensure continuity of operations and mission-essential functions. Sandhills Utility Services, Inc is the sole local utilities provider for the Fort Bragg installation. They own, operate, and maintain the existing utility infrastructure that the new microgrid must connect to, as the microgrid will function as a component of the private utility provider’s established electrical distribution system. As the owner and operator of the utility system, Sandhills Utility Services, Inc maintains exclusive ownership, operational control, and authority over the existing infrastructure and is solely authorized to approve, interface, operate, and maintain interconnected systems within its electrical distribution network

Sole sourcing the contemplated construction project to the utility provider is expected to attenuate the risk of future stranded assets, in the event that the utility provider does not allow that interface to occur. Sole sourcing directly with the utility provider effectively avoids later disputes concerning conveyance and expedites the transfer of operation and maintenance obligations.

Based on the foregoing reasons, it is in the best interest of the government to sole-source the construction project to the private utility provider. This notice does not constitute a solicitation for offers, proposals, etc. However, interested firms must send a capabilities statement NO LATER THAN 11:00AM EDT on 09 April 2026.

 Capability Statements should be sent to the attention of Adrienne Manuel, Contracting Division POC, at Adrienne.C.Manuel@usace.army.mil

Please ensure that the subject line of your email includes "RFI  W912QR26FTBSOTF”

Award is anticipated on or about August 30, 2026. This announcement is in accordance with RFO 5.101(a).




 

Similar open opportunities

Opportunity Agency Set-aside Responses due
Market Intelligence: JDWC Progressive Design-Build OTA Fort Bragg, North Carolina 28310 · NAICS 236220 ENDIST Savannah No set-aside
Infantry Platoon Battle Course (IPBC) Fort Bragg, North Carolina Fort Bragg, NC · NAICS 236220 ENDIST Savannah No set-aside
US Army assessment of Thermal Power Station Operations Aberdeen Proving Ground, Maryland 21005, United States · NAICS 611430 ACC Aberdeen Proving Ground No set-aside
Sources Sought -Building 493 Generator and Backup Power Installation- Red River Army Depot Texarkana, Texas 75501, United States · NAICS 238210 ENDIST Fort Worth No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity