North Fork Touchet River Culvert Replacement

Award Notice Posted

Solicitation number
AG-04KK-S-13-0003
Agency
Awarded
to Curt J Pieratt
Set-aside
Total Small Business

Opportunity facts

Contract number
AG-04KK-C-13-0001 Federal contract award
PSC
Not on record
Place of performance
North Fork Touchet River near... Dayton, Washington 99328, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

This project includes the removal of one corrugated metal pipe on the North Fork Touchet River.  The existing culvert is approximately 126' long and has a 48" diameter.  Project work also includes the installation of a structural plate arch on pre-cast footers in place of the existing culvert.  Stream simulation work in the channel will also be included in the scope of this project.  De-watering will be required for this project.  This will include redirecting the river for the duration of this project and installing erosion and pollution control devices during all phases of this project.  The Contractor shall ensure that all instream work will be completed within the instream work window of July 15th through August 20th, as determined by Washington Department of Fish and Wildlife.

The Government estimate is between $100,000 and $250,000.

It is estimated that this solicitation will be posted on or around 5/1/2013 and responses will be due on or around 06/04/2013.

Update #1 ·

This project includes the removal of one corrugated metal pipe on the North Fork Touchet River.  The existing culvert is approximately 126' long and has a 48" diameter.  Project work also includes the installation of a structural plate arch on pre-cast footers in place of the existing culvert.  Stream simulation work in the channel will also be included in the scope of this project.  De-watering will be required for this project.  This will include redirecting the river for the duration of this project and installing erosion and pollution control devices during all phases of this project.  The Contractor shall ensure that all instream work will be completed within the instream work window of July 15th through August 20th, as determined by Washington Department of Fish and Wildlife.

The Government estimate is between $100,000 and $250,000.

It is estimated that this solicitation will be posted on or around 5/1/2013 and responses will be due on or around 5/30/2013.

Files

File Type Posted
WA1_dvb.mht MHT file
j._SF-25A.pdf PDF
h._SF-24.pdf PDF
f._r6_fs_6300_52.doc DOC document
g._Experience.Questionnaire.doc DOC document
i._SF-25.pdf PDF
k._SF-25B.pdf PDF
AG-04KK-S-13-0003_bidders.rtf RTF text file
North_Fork_Touchet_FSSS.docx DOCX document
AG-04KK-S-13-0003.rtf RTF text file
North_Fork_Touchet_Drawings.pdf PDF
Show all 11

Notice history

Notice Type Posted
2013 North Fork Touchet River Culvert Replacement Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors