North Fork Touchet River Culvert Replacement
Award Notice Posted
- Solicitation number
- AG-04KK-S-13-0003
- Agency
-
Region 6 - Pacific Northwest Region
Forest Service, Department of Agriculture
- Awarded
- to Curt J Pieratt
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG-04KK-C-13-0001 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- North Fork Touchet River near... Dayton, Washington 99328, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
This project includes the removal of one corrugated metal pipe on the North Fork Touchet River. The existing culvert is approximately 126' long and has a 48" diameter. Project work also includes the installation of a structural plate arch on pre-cast footers in place of the existing culvert. Stream simulation work in the channel will also be included in the scope of this project. De-watering will be required for this project. This will include redirecting the river for the duration of this project and installing erosion and pollution control devices during all phases of this project. The Contractor shall ensure that all instream work will be completed within the instream work window of July 15th through August 20th, as determined by Washington Department of Fish and Wildlife.
The Government estimate is between $100,000 and $250,000.
It is estimated that this solicitation will be posted on or around 5/1/2013 and responses will be due on or around 06/04/2013.
Update #1 ·
This project includes the removal of one corrugated metal pipe on the North Fork Touchet River. The existing culvert is approximately 126' long and has a 48" diameter. Project work also includes the installation of a structural plate arch on pre-cast footers in place of the existing culvert. Stream simulation work in the channel will also be included in the scope of this project. De-watering will be required for this project. This will include redirecting the river for the duration of this project and installing erosion and pollution control devices during all phases of this project. The Contractor shall ensure that all instream work will be completed within the instream work window of July 15th through August 20th, as determined by Washington Department of Fish and Wildlife.
The Government estimate is between $100,000 and $250,000.
It is estimated that this solicitation will be posted on or around 5/1/2013 and responses will be due on or around 5/30/2013.
Files
| File | Type | Posted |
|---|---|---|
| WA1_dvb.mht | MHT file | |
| j._SF-25A.pdf | ||
| h._SF-24.pdf | ||
| f._r6_fs_6300_52.doc | DOC document | |
| g._Experience.Questionnaire.doc | DOC document | |
| i._SF-25.pdf | ||
| k._SF-25B.pdf | ||
| AG-04KK-S-13-0003_bidders.rtf | RTF text file | |
| North_Fork_Touchet_FSSS.docx | DOCX document | |
| AG-04KK-S-13-0003.rtf | RTF text file | |
| North_Fork_Touchet_Drawings.pdf |
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| 2013 North Fork Touchet River Culvert Replacement | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity