North East River Maintenance Dredging, Cecil County, MD
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest special notice from .
- Solicitation number
- W912DR26BA007
- Agency
-
ENDIST Baltimore
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KF Maintenance Of Dredging Facilities
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Baltimore District intends to solicit dredging services for the North East River in Cecil County, Maryland, with a response deadline of June 30, 2026; this procurement is set aside for Total Small Business. The project will employ a hydraulic cutterhead pipeline dredge to remove up to 100,000 cubic yards of silty to sandy material to an authorized depth of 7 feet plus two feet allowable over-depth. Material will be transported via approximately 6 miles of pipeline through the North East River, Stony Run Creek, and tidal and nontidal wetlands to an existing upland placement site. The dredging window is restricted to October 16, 2026 through February 15, 2027—the only permitted period for North East River dredging operations. Construction duration is estimated at approximately 120 calendar days from Notice to Proceed. The estimated magnitude is between $1 million and $5 million. NAICS 237990 (Other Heavy and Civil Engineering Construction); PSC Z1KF (Maintenance of Dredging Facilities).
Notice text
The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed.
Notice history
| Notice | Type | Posted |
|---|---|---|
| North East River Maintenance Dredging, Cecil County, MD | Award Notice | |
| North East River Maintenance Dredging, Cecil County, MD | Special Notice | |
| North East River Maintenance Dredging, Cecil County, MD | Solicitation | |
| This notice | Pre-Solicitation | |
| North East River Maintenance Dredging, Cecil County, MD | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Annual Maintenance Dredging of Morehead City Inner Harbor | ENDIST Wilmington | No set-aside | |
| Atchafalaya river BAY, bar, and crewboat cut cutterhead dredge NOS. 4-2026, OM26062 | ENDIST New Orleans | No set-aside | |
| Norfolk Harbor Inner Channel to Newport News Maintenance Dredging located in Hampton Roads, Virginia | ENDIST Norfolk | No set-aside | |
| Fort Eustis Dredge Material Management Area (FEDMMA) | ENDIST Norfolk | Total Small Business | |
| Pass-a-grille-pass, maintenance dredging, pinellas county, florida | ENDIST Jacksonville | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity