North East River Maintenance Dredging, Cecil County, MD

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest special notice from .

Solicitation number
W912DR26BA007
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Baltimore District intends to solicit dredging services for the North East River in Cecil County, Maryland, with a response deadline of June 30, 2026; this procurement is set aside for Total Small Business. The project will employ a hydraulic cutterhead pipeline dredge to remove up to 100,000 cubic yards of silty to sandy material to an authorized depth of 7 feet plus two feet allowable over-depth. Material will be transported via approximately 6 miles of pipeline through the North East River, Stony Run Creek, and tidal and nontidal wetlands to an existing upland placement site. The dredging window is restricted to October 16, 2026 through February 15, 2027—the only permitted period for North East River dredging operations. Construction duration is estimated at approximately 120 calendar days from Notice to Proceed. The estimated magnitude is between $1 million and $5 million. NAICS 237990 (Other Heavy and Civil Engineering Construction); PSC Z1KF (Maintenance of Dredging Facilities).

Notice text

The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed.

Notice history

Notice Type Posted
North East River Maintenance Dredging, Cecil County, MD Award Award Notice
North East River Maintenance Dredging, Cecil County, MD Latest special notice Special Notice
North East River Maintenance Dredging, Cecil County, MD Solicitation
This notice Pre-Solicitation
North East River Maintenance Dredging, Cecil County, MD Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Annual Maintenance Dredging of Morehead City Inner Harbor Morehead City, North Carolina, United States · NAICS 237990 ENDIST Wilmington No set-aside
Atchafalaya river BAY, bar, and crewboat cut cutterhead dredge NOS. 4-2026,  OM26062 Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
Norfolk Harbor Inner Channel to Newport News Maintenance Dredging located in Hampton Roads, Virginia Virginia, United States · NAICS 237990 ENDIST Norfolk No set-aside
Fort Eustis Dredge Material Management Area (FEDMMA) Fort Eustis, Virginia, United States · NAICS 237990 ENDIST Norfolk Total Small Business
Pass-a-grille-pass, maintenance dredging, pinellas county, florida NAICS 237990 ENDIST Jacksonville Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity