North American Electric Reliability (NERC) Modeling & Testing

Closed Solicitation Posted

Solicitation number
W912P522Q0052
Agency
ENDIST Nashville US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
541380 Testing Laboratories and Services
PSC
H259 Equipment And Materials Testing- Electrical And Electronic Equipment Components
Place of performance
Nashville, Tennessee 37203, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers seeks modeling and testing services to ensure three power plant locations comply with North American Electric Reliability Corporation standards. Contractors must perform baseline testing, model development and validation of generators, governors, turbines, exciters and power system stabilizers at Old Hickory Power Plant, Center Hill Power Plant and Wolf Creek Power Plant. Contractors are required to complete testing, submit draft and final reports with acceptable dynamic models to the SERC regional entity by various deadlines between 60 to 165 calendar days from award. Proposals are due by 3:00 PM on September 19, 2022 and will be evaluated based on technical approach and price.

This total small business set-aside contract will be performed in Nashville, Tennessee. Pricing is line item by location with possible award values ranging from $100,000 to $500,000. NAICS codes include 221112 and 562910, and the predominate PSC code is R425. Incumbent contractors may include engineering firms currently supporting modeling validation at these three Corps power plant locations. The performance work statement outlines mandatory generator modeling and testing requirements to be completed at each location within the designated contract periods.

Notice text

2 versions

Update #2 · Latest ·

*Amendment 0001 incorporates a revised Performance Work Statement (PWS).

The U.S. Army Corps of Engineers (USACE) has three locations that require model validation testing of generators, governors, turbines, exciters, and power system stabilizers (PSS) to ensure compliance with the North American Electric Reliability Corporation (NERC) standards.  The three locations include Old Hickory Power Plant in Davidson County, Tennessee, Center Hill Power Plant in De Kalb County, Tennessee, and Wolf Creek Power Plant in Coffey County, KY.  All work shall be accomplished in accordance with the Performance Work Statement.

Update #1 ·

The U.S. Army Corps of Engineers (USACE) has three locations that require model validation testing of generators, governors, turbines, exciters, and power system stabilizers (PSS) to ensure compliance with the North American Electric Reliability Corporation (NERC) standards.  The three locations include Old Hickory Power Plant in Davidson County, Tennessee, Center Hill Power Plant in De Kalb County, Tennessee, and Wolf Creek Power Plant in Coffey County, KY.  All work shall be accomplished in accordance with the Performance Work Statement.

Attachments

Files attached to this notice, newest first
File Type Posted
W912P522Q0052 0001 Solicitation Amendment NERC Modeling and Testing.pdf PDF
W912P522Q0052 Solicitation NERC Modeling and Testing.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
North American Electric Reliability (NERC) Modeling & Testing This notice · Latest solicitation Solicitation
North American Electric Reliability (NERC) Modeling & Testing Pre-Solicitation
FY22 NERC Generator Model Validation Testing Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity