Nonmixing, Rapid-escape Airlock
Closed Solicitation Posted
- Solicitation number
- AF191-023
- Agency
-
Air Force Civil Engineer Center
Air Force Installation and Mission Support Center, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- More information
Notice details come from DoD SBIR/STTR (DSIP). Updated .
Notice text
DoD SBIR topic AF191-023
Component: USAF
Command: AFCEC
Phase: SBIR Program Phase I Action
Technology Areas: Materials
Keywords: aerosol; airlock; contaminant; dust; isolation; nanoparticle; vapor
Objective:
Airlock operating at current or lower rates of effusion and passage rate equal to or faster than current technology allows, occupies less space than current technology, and achieves equal or better decontamination.
Description:
The principal functions of an airlock are to isolate a clean area from a surrounding contaminated environment and, in the shortest time possible, to effect final decontamination of personnel exiting the contaminated area into the clean zone. Current technology employs either large flush volumes or hinged casino doors that move through dead space, so chamber volumes are large and time for air exchanges is relatively long. Opening and closing the doors causes mixing of contaminated air from the chamber being exited into the cleaner chamber being entered.
An alternative technology called a zero-volume airlock was tested, which used an opposed pair of inflated bladders that filled a chamber. To enter, individual personnel were to sidle through the seam between the two bladders, which provided good clearance at a relatively low effusion rate of air from the pressurized clean area. However, sliding resistance made passage slow and arduous, and effectively precluded carrying or wearing gear of any sort.
A second approach atomized hydrogen peroxide into a conventional airlock design and activated the vapor with a nonthermal plasma discharge. Volunteer personnel entered in pairs through casino doors. Minimal attenuation of a semivolatile vapor was observed throughout, and the plasma appeared to contribute nothing to activity of the peroxide, likely because of the short lifetimes of the excited species generated. Effectiveness of decontamination of the personnel was not tested.
This topic solicits an innovative airlock design and feasibility demonstration of a novel prototype airlock that decreases transfer of contaminated air between chambers, that provides faster clearance rates than current technology of vapor and particles—at the same or lower rate of air leakage from the clean area—and that allows rapid passage of personnel from an area of chemical, microbiological or nanoparticulate contamination. The goal of the ultimate product is to achieve sustained 99.99% removal of contaminant volatiles and/or particles for a passage of 60 seconds or less. The prototypes and designs may occupy a footprint no larger than that of current technology. A strong premium will attach to novelty and to decreasing the necessary rate of effusion from the clean area. Portability will be a plus.
Phase I:
Develop a design & justify that it can be expected to meet criteria for extent of decontamination & passage rate. Show that volunteers wearing and carrying representative protective and functional gear can transit between chambers of a minimal two-chamber prototype safely and without extreme effort. Deliver a full-scale design, detail the prototype tested & interpret results of the demonstration.
Phase II:
Refine phase I design, build full-scale prototype for field testing. Using volunteers as above, demonstrate passage rate of 60 per hour from a space filled with hydrocarbon vapor or ~1 µm fluorescent particles. Determine residence time & concentration in each chamber during passage into a space at +2 in H2O overpressure. Refine design to improve passage rate, better accommodate personnel requirements for operating space, &/or otherwise increase processing rate &/or efficiency of decontamination.
Phase III:
Develop & build production design, including all materials needed to maximize attainable reduction of chemical and particulate contamination. Deliver production model for evaluation. Modify design & materials as needed to fix deficiencies noted during evaluation & deliver final production model.
Files
| File | Type | Posted |
|---|---|---|
| AF191-023.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity