Ngwsp block 2-3 HDD
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140R4026R0002
- Agency
-
Bureau of Reclamation
Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- Forecast
- San Juan Lateral Block 2-3 HDD Federal forecast
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Bureau of Reclamation is soliciting construction services for Horizontal Directional Drilling (HDD) work on the Navajo-Gallup Water Supply Project (NGWSP) Block 2-3 in New Mexico. This project will involve constructing water transmission pipelines across multiple river and arroyo crossings using four HDD bores ranging from 2,000 to 3,295 feet, with 36-inch and 42-inch diameter buried pipelines. The solicitation will be competitively awarded on a best-value basis, and contractors must be registered in the System for Award Management (SAM). Bidders will be required to provide a 20% bid guarantee along with 100% payment and performance bonds. A pre-award site visit is anticipated around November 5, 2025, and questions and comments regarding the draft solicitation must be submitted within one week of its posting. The formal solicitation was expected to be released on approximately October 29, 2025, via SAM.gov, with proposals due on January 28, 2026.
This opportunity is set aside for small businesses under NAICS code 237110 (Water and Sewer Line and Related Structures Construction), with a size standard of $45 million. The estimated contract value ranges between $30 and $60 million. The project location spans from south of the Frank Chee Willetto Reservoir to the San Juan Lateral Water Treatment Plant, encompassing water transmission infrastructure critical to the regional water supply system. No incumbent contractor information was identified in the pre-solicitation materials. Eligible small businesses must ensure compliance with all bonding and registration requirements, and should plan accordingly for the site visit and subsequent proposal submission to meet the January 28, 2026 deadline.
Notice text
2 versions
Update #2 · Latest ·
NGWSP BLOCK 2-3 HDD - For all draft solicitation documents, see pre-solicitation notice posted under 140R4025R0027. This solicitation (and the estimated date for the site visit) have been delayed.
Update #1 ·
NGWSP BLOCK 2-3 HDD - For all draft solicitation documents, see pre-solicitation notice posted under 140R4025R0027.
Files
| File | Type | Posted |
|---|---|---|
| 01_140R4026R0002_Presol_Notice_6OCT25_1.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Ngwsp block 2-3 HDD | Award Notice | |
| Ngwsp block 2-3 HDD | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| NGWSP Cutter Lateral Reach 21 Booster Plant | Bureau of Reclamation | Total Small Business | |
| Turnout Buildings | Bureau of Reclamation | No set-aside | |
| East canal efficiency improvements | Bureau of Reclamation | Total Small Business | |
| Bgndrf piping upgrades | Bureau of Reclamation | Total Small Business | |
| White Horse Hill National Game Preserve Water Main Extension | — | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity