Notice text

Nez Perce Clearwater NF, Lochsa Ranger District, Smith Creek Culvert Replacement, FS Road 101 at Milepost 2.00, Work consists of the removal of an existing 36 inch culvert and replacing with a new 48 inch by 90 ft long CMP. Project consist of, but not limited to clearing the roadway to the project site for contractor access, structure excavation, excavation and reshaping of the channel in the vicinity of the culvert, installation of 48 inch CMP placement of riprap, installation of embankment material, structure backfill, embankment and excavation of the roadway approaches, channel reconstruction.  The project is located approx 14 miles east of Kooskia, Idaho in Idaho County.  From Kooskia, ID travel east on U.S. Hwy 12 approx 14 miles and turn North onto FSR 101. Travel approximately 2.00 miles to Project Site.  Period of Performance estimated July October 2, 2021. Estimated price range between $100,000 - $250,000Nez Perce Clearwater NF, Lochsa Ranger District, Smith Creek Culvert Replacement, FS Road 101 at Milepost 2.00, Work consists of the removal of an existing 36 inch culvert and replacing with a new 48 inch by 90 ft long CMP. Project consist of, but not limited to clearing the roadway to the project site for contractor access, structure excavation, excavation and reshaping of the channel in the vicinity of the culvert, installation of 48 inch CMP placement of riprap, installation of embankment material, structure backfill, embankment and excavation of the roadway approaches, channel reconstruction.  The project is located approx 14 miles east of Kooskia, Idaho in Idaho County.  From Kooskia, ID travel east on U.S. Hwy 12 approx 14 miles and turn North onto FSR 101. Travel approximately 2.00 miles to Project Site.  Period of Performance estimated July October 2, 2021. Estimated price range between $100,000 - $250,000.

Files

File Type Posted
SmithCreek_RFQ_21Q0017.docx DOCX document
SmithCr_Drawings.pdf PDF
Wage Decision ID20210080.pdf PDF
Smith Creek FSSS_rev1.docx DOCX document
SF18_1240LU21Q0017.pdf PDF

Notice history

Notice Type Posted
NezPerce Clearwater NF, Lochsa RD, Smith Creek Culvert Replacement Award Award Notice
This notice Latest solicitation Solicitation
NezPerce Clearwater NF, Lochsa RD, Smith Creek Culvert Replacement Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity