Nez Perce-Clearwater NFs - Burpee Mountain Rock Crushing/Stockpiling

Award Notice Posted

Solicitation number
12034319Q0045
Agency
Awarded
to Seubert Excavators, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
12034319P0278 Federal contract award
NAICS code
212319 Other Crushed and Broken Stone Mining and Quarrying
PSC
Not on record
Place of performance
Red River Ranger Station 300 American River Road Elk City, Idaho 83525, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Awarded Vendors: Seubert Excavators, Inc.. Contract Award Dollar Amount: $649,225.00. Contract Award Date: 2019-08-20.

Update #3 ·

This contract requires commercial rock crushing/stockpiling services. Rock crushing shall occur within the established USFS Burpee Mountain Pit. The contractor shall crush approximately 50,000 Tons of Grading F Surface Course, 10,000 Tons of Grading P Base Course and 5000 CY of Class 3 Rip Rap for stockpile. Half of the crushed rock of each gradation (25,000 Tons Grading F, 5,000 Tons Grading P and 2500 CY Rip Rap) shall be hauled to Dixie Summit for stockpiling. The contract also requires clearing and grubbing, maintaining the haul route upon completion of stockpiling activities, seeding and all other incidental items necessary to complete the project in accordance with the plans and specifications.

The project is located on the Red River Ranger District in the Nez Perce-Clearwater National Forests. The Dixie Summit Stockpile is located about 15 miles south of Elk City, ID on Road 222, and Burpee Mountain Pit is 5.5 southwest of Dixie Summit on Road 1188. Dixie Summit is in Section 2, Township 26N, Range 8E (45°36'55.26"N, 115°26'35.80"W) and Burpee Mountain Pit is in Section 20, Township 26N, Range 8E (45°34'20.77N, 115°.29'41.79"W)


The Request for Quotes was issued with all attachments on 7/18/2019.**Attendance at an organized site visit is MANDATORY for quote submission. See the provision on page 43 of the solicitation for details.


Work on the project site shall commence no earlier than June 15, 2020. All work shall be completed by October 15, 2020. As a commercial service project, no bonding is required.


An organized site visit was held on 7/31/2019. Notes were uploaded to FBO 8/6/2019. Amendment 1 was issued on 8/6/2019 to clarify and change small sections of Attachment 1, FSSS and provide a modified SF-1449 for quote submission. Quoters are required to acknowledge the solicitation amendment by signing and submitting the SF-30 with the other required quotation documents or via an alternative method detailed in Block 11 of the SF-30. The date for receipt of quotes is unchanged.




.

Update #2 ·

This contract requires commercial rock crushing/stockpiling services. Rock crushing shall occur within the established USFS Burpee Mountain Pit. The contractor shall crush approximately 50,000 Tons of Grading F Surface Course, 10,000 Tons of Grading P Base Course and 5000 CY of Class 3 Rip Rap for stockpile. Half of the crushed rock of each gradation (25,000 Tons Grading F, 5,000 Tons Grading P and 2500 CY Rip Rap) shall be hauled to Dixie Summit for stockpiling. The contract also requires clearing and grubbing, maintaining the haul route upon completion of stockpiling activities, seeding and all other incidental items necessary to complete the project in accordance with the plans and specifications.

The project is located on the Red River Ranger District in the Nez Perce-Clearwater National Forests. The Dixie Summit Stockpile is located about 15 miles south of Elk City, ID on Road 222, and Burpee Mountain Pit is 5.5 southwest of Dixie Summit on Road 1188. Dixie Summit is in Section 2, Township 26N, Range 8E (45°36'55.26"N, 115°26'35.80"W) and Burpee Mountain Pit is in Section 20, Township 26N, Range 8E (45°34'20.77N, 115°.29'41.79"W)


The Request for Quotes was issued with all attachments on 7/18/2019.**Attendance at an organized site visit is MANDATORY for quote submission. See the provision on page 43 of the solicitation for details.


Work on the project site shall commence no earlier than June 15, 2020. All work shall be completed by October 15, 2020. As a commercial service project, no bonding is required.




.

Update #1 ·

This contract requires commercial rock crushing/stockpiling services. Rock crushing shall occur within the established USFS Burpee Mountain Pit. The contractor shall crush approximately 50,000 Tons of Grading F Surface Course, 10,000 Tons of Grading P Base Course and 5000 CY of Class 3 Rip Rap for stockpile. Half of the crushed rock of each gradation (25,000 Tons Grading F, 5,000 Tons Grading P and 2500 CY Rip Rap) shall be hauled to Dixie Summit for stockpiling. The contract also requires clearing and grubbing, maintaining the haul route upon completion of stockpiling activities, seeding and all other incidental items necessary to complete the project in accordance with the plans and specifications.

The project is located on the Red River Ranger District in the Nez Perce-Clearwater National Forests. The Dixie Summit Stockpile is located about 15 miles south of Elk City, ID on Road 222, and Burpee Mountain Pit is 5.5 southwest of Dixie Summit on Road 1188. Dixie Summit is in Section 2, Township 26N, Range 8E (45°36'55.26"N, 115°26'35.80"W) and Burpee Mountain Pit is in Section 20, Township 26N, Range 8E (45°34'20.77N, 115°.29'41.79"W)


The Request for Quotes shall be issued in mid-March to mid-April with contract award scheduled for mid-May. Work on the project site shall commence no earlier than June 1, 2019. All work shall be completed by October 31, 2019.

.

Files

File Type Posted
Amend1.doc DOC document
Amendment1_Attachment1_SF1449.docx DOCX document
MandatorySiteVisitNotes.docx DOCX document
Attachment7_-Drill_Logs_90_-81_90_-82_(1).pdf PDF
Attachment2_BURPEE_FSSS.docx DOCX document
Attachment5_Drill_Locations_Sketch.pdf PDF
Attachment1_WageDetermination.docx DOCX document
RFQ.doc DOC document
Attachment3_Drawings.pdf PDF
Attachment6_Drill_Logs_82_87_83_87.pdf PDF