Nez Perce-Clearwater NF / Red River Ranger District / Bear Creek Road Obliteration (Service)

Award Notice Posted

Solicitation number
12034318Q0193
Agency
Awarded
to Barger, Dale A
Set-aside
Total Small Business

Opportunity facts

Contract number
12034318P0294 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Red River Ranger District 300 American River Road Elk City, Idaho 83525, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

This acquisition requires service work and therefore, no bonding is required. It is anticipated that the solicitation will be issued in May 2018 with contract award planned for the beginning of June, 2018.




Description of Work:
Bear Creek Road Obliteration Phase I: The project consists of 12.10 miles of full road obliteration by re-contouring and decompacting on the Red River Ranger District. Work includes structure removal, surface de-compaction and restoring natural slopes on features such as roads, skid trails, excavated skid roads and log landings. Work also includes seeding and applying available slash on disturbed soil.


Project Location: Directions from Grangeville, Idaho to project center: Head east on Mt Idaho Grade for 9.6 miles. Merge onto ID-14E and continue east for 28.4 miles. Turn left (north) up Newsome Creek Road (Forest Service Road 1858) for 0.3 miles. Turn right on FSR 307 and continue for 4.1 miles. A majority of the project can be accessed off of the 307 Road.



Period of Performance: The period of performance will extend from the date of contract award through October 31, 2018. 





Update #1 ·

This acquisition requires service work and therefore, no bonding is required. It is anticipated that the solicitation will be issued in May 2018 with contract award planned for the beginning of June, 2018.




Description of Work:
Bear Creek Road Obliteration Phase I: The project consists of 12.10 miles of full road obliteration by re-contouring and decompacting on the Red River Ranger District. Work includes structure removal, surface de-compaction and restoring natural slopes on features such as roads, skid trails, excavated skid roads and log landings. Work also includes seeding and applying available slash on disturbed soil.


Project Location: Directions from Grangeville, Idaho to project center: Head east on Mt Idaho Grade for 9.6 miles. Merge onto ID-14E and continue east for 28.4 miles. Turn left (north) up Newsome Creek Road (Forest Service Road 1858) for 0.3 miles. Turn right on FSR 307 and continue for 4.1 miles. A majority of the project can be accessed off of the 307 Road.



Period of Performance: The period of performance will extend from the date of contract award through October 31, 2018. 





Files

File Type Posted
SF30_Amendment0002_EXTEND.pdf PDF
SF30_Amendment_0001_Set-aside_Adminchange.pdf PDF
06._Experience_Questionaire.doc DOC document
RFQ_12034318Q0193_Bear_Ck_Rd_Obliteration.pdf PDF
02._Bear_Creek_Specs.pdf PDF
04._Wage_Determination_No._2015-5511.pdf PDF
03._Idaho_Workers_Comp.docx DOCX document
05._FAR_52.212-4.pdf PDF
01._Bear_Creek_Oblit_Plans.pdf PDF