N045--Loch Raven VAMC Bldg 6 Boiler Replacement 512-26-1-444-0006
Closed Pre-Solicitation Posted
- Solicitation number
- 36C24526Q0071
- Agency
-
Veterans Integrated Service Network 5
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Department of Veterans Affairs Loch Raven Vamc Baltimore, Maryland 21218, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5 is seeking qualified entities to replace an existing Weil McClain Water Tube Boiler (209MBH) located in Building 6 at the Loch Raven VA Medical Center in Baltimore, Maryland. This Sources Sought Notice (36C24526Q0071) requests responses from organizations capable of providing boiler replacement services, including all material, labor, equipment, and supervision necessary to complete the project. Interested vendors must demonstrate their qualifications by submitting comprehensive capability statements, previous experience with similar projects for the Veterans Health Administration or comparable facilities, available contract vehicles (such as GSA FSS), relevant certifications and licenses, and confirmation of their ability to self-perform work or manage subcontracting in compliance with applicable limitations. The procurement falls under NAICS code 238220 (Plumbing, Heating, and Air-Conditioning Contractors) and PSC code N045 (Installation of Equipment—Plumbing, Heating, and Waste Disposal Equipment). All interested entities must submit responses by October 31, 2025, at 11:00 AM EST via email to William.Galletta@va.gov, with required information including business name, Unique Entity ID, socio-economic status, contact person details, and certification documentation.
This pre-solicitation notice carries no set-aside designations, allowing all qualified contractors to compete regardless of business classification. The project requires the contractor to remove the existing boiler, install a new CSD-1 compliant boiler using existing utility lines with potential minor modifications, and install a new PVC vent line, with the entire scope of work to be completed within 30 calendar days of the Notice to Proceed. No specific award value or budget range is disclosed in the pre-solicitation materials, and no incumbent contractor is identified. Vendors responding to this notice should prepare to address their self-performance capabilities or, if subcontracting is contemplated, explain how they will ensure compliance with subcontracting limitations as required by federal regulations. The condensed project timeline of 30 days emphasizes the importance of contractor readiness and resource availability in the evaluation process.
Notice text
Page 1 of 1
Department of Veterans Affairs NCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for Loch Raven VA Medical Center.
Please respond to this RFI/Sources Sought 36C24526Q0071 with your:
1. Business name (including Unique Entity ID (SAM.gov)
2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned,
Disadvantaged Small Business, 8(a), etc.), and
3. Person of contact (including telephone number & email address).
4. Capability statement and summary of previous experience providing these types of
services for the Veterans Health Administration or other similar facilities.
5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (include
applicable NAICS)
6. Brief Summary of categories of services that your company can/cannot provide.
7. Certification(s) / Licenses for meeting the local requirements to provide these
services at the Huntington VAMC (if applicable)
8. Confirmation that your organization has the capability & expertise to meet the
performance requirements while complying with applicable limitations in
subcontracting by responding to the questions below with your response:
a. Do you intend to self-perform this effort?
b. If you are located outside the immediate area, how will you self-perform?
c. Or do you intend to subcontract work under this contract?
d. If you intend to subcontract work under this contract, how will you ensure
compliance with the limitations on subcontracting?
Response Instructions:
Responses must be received by Friday 10/31/ 2026 @ 11:00 AM EST. Responses to the information requested above must be submitted via email to William.Galletta@va.gov
SCOPE OF WORK
LR Bldg 6 Boiler Replacement
Project: 512-25-052
GENERAL SCOPE OF WORK:
The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Loch Raven Campus. Contractor is to remove the existing boiler in the Building 6 mechanical room a Weil McClain Water Tube Boiler rated at 209MBH and replace it with a CSD-1 compliant boiler on the existing equipment pad. The old boiler should be properly disposed of after removal with disposal receipts provided to VA. New boiler should use existing utility lines for tie-in s where possible except for the existing Vent line. Per NBCI code, the vent line must be PVC and the atmospheric metal duct deteriorate. Contractor to confirm feasibility of utility line tie-ins and vent line replacement during pre-bid walk through. Utility tie-ins may require minor modifications to fit the existing space and new boiler. Contractor to follow boiler manufacturer install instructions for proper installation. Contractor will provide materials to meet ICRA requirements set forth by safety based on the work to be completed. Contractor to provide warranty and start-up after install of new boiler to confirm proper operation.
Remove and dispose of existing Weil McClain Water Tube Boiler (209MBH).
Provide disposal receipts to VA.
Provide and install CSD-1 compliant Boiler sized to match existing boiler.
Utilize existing utility lines for tie-ins where possible except for the vent line. New PVC vent line must be installed.
Contractor to adhere to any and all local, state, federal, and VA specifications and guidelines. Work will be completed in 30 calendar days from Notice To Proceed.
Files
| File | Type | Posted |
|---|---|---|
| 36C24526Q0071.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| J044--NOTICE OF INTENT TO SOLE SOURCE Baltimore VAMC Steam System Preventive Maintenance from Vicinity Energy Baltimore Corporation | Veterans Integrated Service Network 5 | No set-aside | |
| J048--NEW - Energy Center Steam Header& Boilers valves, gaskets, and vent replacement | Veterans Integrated Service Network 17 | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295 | Veterans Integrated Service Network 12 | Service-Disabled Veteran-Owned Small Business | |
| 16292 Steam Boiler Replacement | Air Force Sustainment Center | Total Small Business | |
| J045--FY27 Boilers Maintenance & Testing | Veterans Integrated Service Network 8 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity