Amend 0001 Mussel survey and relocation efforts
Closed Solicitation Posted
- Solicitation number
- W9126G24Q0043
- Agency
- ENDIST Fort Worth US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541620 Environmental Consulting Services
- Place of performance
- Waco, Texas 76706, United States
- Points of contact
-
- Robert Duran robert.m.duran@usace.army.mil (817) 886-1070
- Bonifacio Magdaleno bonifacio.magdaleno@usace.army.mil (817) 886-1839
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers (USACE), Fort Worth District is seeking a contractor to provide mussel survey and relocation efforts in support of a bank stabilization project along the Brazos River near the Waco Regional Treatment Facility in Texas. The contractor will be required to conduct mussel surveys following approved protocols and coordinate with state and federal wildlife agencies. Evaluation criteria include price, past performance, and technical approach, and offerors must submit a technical proposal, past performance information, and pricing. The response is due by May 24, 2024 at 10:00 AM CDT, and a site visit is scheduled for May 7, 2024.
This procurement is set aside 100% for small businesses under NAICS code 541620. The contract will be awarded as a firm-fixed price purchase order, but the specific award value or budget range is not provided. The place of performance is Robinson, TX 76706, USA.
Notice text
3 versions
Update #3 · Latest ·
Amendment 0001 is to extend response due date from 17 May 2024 to 24 May 2024 1000am CDT.
-------------------------
Mussel survey and relocation efforts. Fort Worth District has drafted a plan to mitigate channel erosion caused by flooding through bank stabilization in order to protect local, state, and federal interest for the Waco Treatment Facility, Texas. Proposed construction for this project is scheduled to start late spring or early summer of 2024. There is one state threatened (TAC 2020), federally proposed mussel species (USFWS 2021), Texas Fawnsfoot (Truncilla macrodon), that inhabit the middle Brazos River and the project area falls within the range of the proposed critical habitat A survey upstream of the Waco Treatment Facility by BioWest indicated that Texas Fawnsfoot are present near the project area (BioWest Personal Communication). USACE Worth Districts approach is to have surveys conducted for freshwater mussels at the construction sites along the streambanks and main channel of the Brazos River near the Waco Treatment Facility for relocation efforts with a focus on minimizing risk to Texas Fawnsfoot. Sampling activities will follow approved standardized protocols and will be coordinated with the Texas Parks and Wildlife Department and the U.S. Fish and Wildlife Service.
Update #2 ·
Mussel survey and relocation efforts. Fort Worth District has drafted a plan to mitigate channel erosion caused by flooding through bank stabilization in order to protect local, state, and federal interest for the Waco Treatment Facility, Texas. Proposed construction for this project is scheduled to start late spring or early summer of 2024. There is one state threatened (TAC 2020), federally proposed mussel species (USFWS 2021), Texas Fawnsfoot (Truncilla macrodon), that inhabit the middle Brazos River and the project area falls within the range of the proposed critical habitat A survey upstream of the Waco Treatment Facility by BioWest indicated that Texas Fawnsfoot are present near the project area (BioWest Personal Communication). USACE Worth Districts approach is to have surveys conducted for freshwater mussels at the construction sites along the streambanks and main channel of the Brazos River near the Waco Treatment Facility for relocation efforts with a focus on minimizing risk to Texas Fawnsfoot. Sampling activities will follow approved standardized protocols and will be coordinated with the Texas Parks and Wildlife Department and the U.S. Fish and Wildlife Service.
Update #1 ·
Mussel survey and relocation efforts. Fort Worth District has drafted a plan to mitigate channel erosion caused by flooding through bank stabilization in order to protect local, state, and federal interest for the Waco Treatment Facility, Texas. Proposed construction for this project is scheduled to start late spring or early summer of 2024. There is one state threatened (TAC 2020), federally proposed mussel species (USFWS 2021), Texas Fawnsfoot (Truncilla macrodon), that inhabit the middle Brazos River and the project area falls within the range of the proposed critical habitat A survey upstream of the Waco Treatment Facility by BioWest indicated that Texas Fawnsfoot are present near the project area (BioWest Personal Communication). USACE Worth Districts approach is to have surveys conducted for freshwater mussels at the construction sites along the streambanks and main channel of the Brazos River near the Waco Treatment Facility for relocation efforts with a focus on minimizing risk to Texas Fawnsfoot. Sampling activities will follow approved standardized protocols and will be coordinated with the Texas Parks and Wildlife Department and the U.S. Fish and Wildlife Service.
Attachments
| File | Type | Posted |
|---|---|---|
| B08 W9126G24Q0043 Amend 0001.pdf | ||
| B08 W9126G24Q0043 Mussel Survey.pdf |