Multiple Award Task Order Contract (MATOC) for Preparation, Rehabilitation and Painting of Large Industrial and Hydraulic Stationary and Floating Structures, Various Locations throughout Southwest Division
Award Notice Posted
- Solicitation number
- W912BV-09-R-1010
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Awarded
- to Hartman-Walsh Painting Company
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912BV-09-D-1010 Federal IDV award
- NAICS code
- Not on record
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
Painting large industrial structures and hydraulic stationary and floating structures to include but not limited to bridges, catwalks, sluice gates, floating bulkheads, tainter gates and tainter gate superstructures and control equipment and stoplogs. Preparation of surfaces prior to painting include sandblasting, compliance with all environmental laws and regulations to include control of sandblasting material and residue, welding, minor structural repair work, and general repair work which could include repair of pitted areas of steel structures with weld buildup prior to painting, welding of damaged gate support members and replacement of gate seals. Conditions may include working in confined spaces, staging from a barge in the navigation channel. Site evacuation may be required with 24 hours notice, without assistance from the Corps of Engineers.
Update #3 ·
Painting large industrial structures and hydraulic stationary and floating structures to include but not limited to bridges, catwalks, sluice gates, floating bulkheads, tainter gates and tainter gate superstructures and control equipment and stoplogs. Preparation of surfaces prior to painting include sandblasting, compliance with all environmental laws and regulations to include control of sandblasting material and residue, welding, minor structural repair work, and general repair work which could include repair of pitted areas of steel structures with weld buildup prior to painting, welding of damaged gate support members and replacement of gate seals. Conditions may include working in confined spaces, staging from a barge in the navigation channel. Site evacuation may be required with 24 hours notice, without assistance from the Corps of Engineers.
Update #2 ·
Painting large industrial structures and hydraulic stationary and floating structures to include but not limited to bridges, catwalks, sluice gates, floating bulkheads, tainter gates and tainter gate superstructures and control equipment and stoplogs. Preparation of surfaces prior to painting include sandblasting, compliance with all environmental laws and regulations to include control of sandblasting material and residue, welding, minor structural repair work, and general repair work which could include repair of pitted areas of steel structures with weld buildup prior to painting, welding of damaged gate support members and replacement of gate seals. Conditions may include working in confined spaces, staging from a barge in the navigation channel. Site evacuation may be required with 24 hours notice, without assistance from the Corps of Engineers.
Update #1 ·
Initial task order for Rehabilitation and Painting of Tainter Gates at Fall River Dam, Oklahoma.
Notice history
| Notice | Type | Posted |
|---|---|---|
| RECOVERY--Z--PROJECT NUMBER 18050, Tenkiller Ferry Lake, OK | Award Notice | |
| RECOVERY--Z--PROJECT NUMBER 18350, Toronto Lake, KS | Award Notice | |
| RECOVERY--Z--PROJECT NUMBER 18050, Tenkiller Ferry Lake, OK | Award Notice | |
| This notice | Award Notice |
4 of 11 notices listed here. See the rest on GovTribe.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity