Multi Fuel Platoon Power Generator
Closed Solicitation Posted
- Solicitation number
- A25D-015
- Agency
-
Office of the Secretary
Headquarters, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- More information
Notice details come from DoD SBIR/STTR (DSIP). Updated .
About this opportunity
The Department of the Army is soliciting STTR Phase I proposals for a Multi Fuel Platoon Power Generator under DoD 25.D topic A25D-015, with proposals due July 23, 2025; that deadline has passed. The set-aside is Total Small Business.
The Army's ASA(ALT) component seeks a platoon-scale generator that converts fossil and alternative fuels to electric power for Large Scale Combat Operations, reducing battery and resupply burdens. Requirements include greater than 1.5 kW of continuous output, fuel energy density of 500-2000 Wh/kg, and 120VAC or 28VDC (threshold) and 240VAC (objective) at 60 Hertz. Weight may not exceed 55 lbs (threshold), with a goal below 20 lbs without fuel. The unit must operate in parallel with two identical systems (threshold) or up to four systems of same or different types (objective). Acceptable fuels include JP-8, F-24, DF2, methanol, ALANE, and High Energy Aluminum, and the topic is marked ITAR: No.
Phase I awards are up to $250,000 over six months. Phase I work must demonstrate feasibility, identify fuel choice, develop system design, model size and weight, identify component sources, and compare the design against incumbent solutions. Phase II, reserved for Phase I awardees, requires a TRL 4 breadboard and delivery of two functional systems to the Army, each supporting 100 hours of testing.
Technical volumes are limited to seven pages in searchable PDF. Offerors must maintain active SAM registration and register on DSIP. Evaluation weights are Technical Approach at 35%, Commercial Potential at 25%, Programmatic Potential at 20%, Army Benefits at 15%, Introduction at 2%, and Proposal Quality at 2%. Awards are firm-fixed-price agreements tied to milestones. Phase I Technical and Business Assistance is discretionary, up to $6,500. Export control (ITAR/EAR), Controlled Unclassified Information handling, and foreign national disclosure obligations apply.
Notice text
DoD STTR topic A25D-015
Component: ARMY
Command: ASA(ALT)
Phase: STTR Phase I
Technology Areas: Materials
Focus Areas: Advanced Materials; Mission Readiness & Disaster Preparedness; Sustainment & Logistics
Keywords: Platoon; Power Generator; multi-fuel; methanol; High Energy Aluminum; Alane; JP8; DF2; alternative fuel; PEM fuel cell; Solid Oxide Fuel Cell; Silent; Stirling Engine
ITAR: No
Objective:
The topic aims to fulfill the need for a Platoon Scale Power Generator (PPG) that will allow Platoons to operate semi-independently over extended periods of time and distance during Large Scale Combat Operations (LSCO). PPG is one part of the Platoon’s overall power generation capabilities. It will convert an energy source, such as fossil fuels and/or alternative fuels, to electric power, to charge and recharge large quantities of a Platoon’s batteries quickly and efficiently. This will minimize the need for support from higher echelons thus, greatly reducing logistical burdens of power and battery related resupply. PPG will reduce the need for the Platoon to carry large quantities of extra batteries.
Description:
The PPG will meet the following requirements:
- The system shall produce >1.5 kW of continuous output power
- When in operation, the system’s fuel source shall have an energy density of 500-2000 Wh/kg
- PPG shall provide either 120VAC or 28VDC (T) and 240VAC (O) at a frequency of 60 Hertz
- The system shall not exceed 55lbs. (T). The goal is to minimize the system weight below 20 lbs without fuel
- System shall be able to operate in parallel with ≥two (2) systems, same model, output, and mode, (T) and up to four (4) systems of same or different types, models, outputs and modes, (O) together to produce greater power and increase overall system reliability
- PPG can be optimized to operate on one fuel type or be capable of operating on multiple fuels. Where applicable, consider operation on DoD approved lubricants and standard military fuels such as JP-8, F-24. DF2 or alternative fuels to include, but not limited to methanol, methanol-water mixture, ALANE (AIH3), High Energy Aluminum (HEA), or Activated Aluminum
- The volume of the PPG shall be between 2 – 10 cubic feet
Phase I:
This topic is accepting Phase I proposals for a cost up to $250,000 for a 6-month period of performance.
Demonstrate the feasibility of the proposed Platoon Power Generator technology. Identify the technology, fuel choice, along with supporting information. Develop the overall system design, model the size and weight of the system, component choices and sources and perform a comparative analysis of the design metrics with incumbent generator solutions and other technology/fuel implementations from literature. Provide a report on the findings.
Phase II:
Further develop and demonstrate the Platoon Power Generator designed in Phase I. Performers will source and/or build and test key components of the system leading to the demonstration of a TRL 4 breadboard system during phase II performance. Upon a successful demonstration at TRL 4, refinements will be made to improve the system design and address any findings from the breadboard demonstration. Two functional systems will be delivered to the Army for evaluation at the end of the Phase II effort to support 100 hours of testing each, at the nominal power output of the system.
Phase III:
- The generator market is currently a $35.9 billion industry and is expected to grow to $53.5 billion industry by 2032*. The product of this work is directly applicable to the commercial market.
Files
| File | Type | Posted |
|---|---|---|
| A25D-015.pdf | ||
| Army_STTR_25D_R9.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity