Multi Fuel Platoon Power Generator
Closed Solicitation Posted
- Solicitation number
- A254-040
- Agency
-
Office of the Secretary
Headquarters, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- More information
Notice details come from DoD SBIR/STTR (DSIP). Updated .
About this opportunity
The Department of the Army is soliciting Phase I SBIR proposals under DoD topic A254-040 for a Multi Fuel Platoon Power Generator, with proposals due July 23, 2025, a deadline that has passed as of this summary. The Set Aside is Total Small Business, and the topic is sponsored by ASA(ALT) under the Army's DoD 25.4 SBIR program.
The system must produce greater than 1.5 kW of continuous output power from a fuel source with an energy density of 500-2000 Wh/kg. Output is 120VAC or 28VDC at 60 Hertz (threshold), with 240VAC as an objective. The unit must not exceed 55 pounds (threshold), with a goal of under 20 pounds without fuel. It must operate in parallel with two systems of the same model, output, and mode (threshold), and with up to four systems of same or different types, models, outputs, and modes (objective). The generator may run on one fuel or multiple fuels, and where applicable should operate on DoD-approved lubricants and standard military fuels such as JP-8 and F-24. The topic is not ITAR-controlled.
Phase I proposals are limited to $250,000 for six-month periods of performance. Per the Government File summary, Phase I requires a feasibility demonstration with system design, component analysis, and comparative assessment against incumbent solutions. Phase II covers sourcing and building key components to demonstrate a TRL 4 breadboard, then delivering two functional systems to the Army for 100 hours of testing each. The Army's Phase II Enhancement Program provides up to $500,000 in dollar-for-dollar matching SBIR funds for awardees securing non-SBIR funding commitments.
Eligibility requires active registration in SAM and the Defense SBIR/STTR Innovation Portal (DSIP) and compliance with 13 CFR 121.702. Proposals must be single Adobe PDF files, with Phase I technical volumes limited to seven pages, 10-point font minimum, and one-inch margins. The Army screens for responsiveness, timeliness, and small business concern eligibility, then conducts technical evaluation with the ValidEval tool against criteria in Appendices A and B. Selection notifications occur within 90 days of topic closing, and selected proposals are not guaranteed contract awards.
Notice text
DoD SBIR topic A254-040
Component: ARMY
Command: ASA(ALT)
Phase: SBIR Program Phase I Action
Technology Areas: Materials
Focus Areas: Advanced Materials; Mission Readiness & Disaster Preparedness; Sustainment & Logistics
Keywords: Platoon; Power Generator; multi-fuel; methanol; High Energy Aluminum; Alane; JP8; DF2; alternative fuel; PEM fuel cell; Solid Oxide Fuel Cell; Silent; Stirling Engine
ITAR: No
Objective:
The topic aims to fulfill the need for a Platoon Scale Power Generator (PPG) that will allow Platoons to operate semi-independently over extended periods of time and distance during Large Scale Combat Operations (LSCO). PPG is one part of the Platoon’s overall power generation capabilities. It will convert an energy source, such as fossil fuels and/or alternative fuels, to electric power, to charge and recharge large quantities of a Platoon’s batteries quickly and efficiently. This will minimize the need for support from higher echelons thus, greatly reducing logistical burdens of power and battery related resupply. PPG will reduce the need for the Platoon to carry large quantities of extra batteries.
Description:
The PPG will meet the following requirements:
- The system shall produce >1.5 kW of continuous output power
- When in operation, the system’s fuel source shall have an energy density of 500-2000 Wh/kg
- PPG shall provide either 120VAC or 28VDC (T) and 240VAC (O) at a frequency of 60 Hertz
- The system shall not exceed 55lbs. (T). The goal is to minimize the system weight below 20 lbs without fuel
- System shall be able to operate in parallel with ≥two (2) systems, same model, output, and mode, (T) and up to four (4) systems of same or different types, models, outputs and modes, (O) together to produce greater power and increase overall system reliability
- PPG can be optimized to operate on one fuel type or be capable of operating on multiple fuels. Where applicable, consider operation on DoD approved lubricants and standard military fuels such as JP-8, F-24. DF2 or alternative fuels to include, but not limited to methanol, methanol-water mixture, ALANE (AIH3), High Energy Aluminum (HEA), or Activated Aluminum
- The volume of the PPG shall be between 2 – 10 cubic feet
Phase I:
This topic is accepting Phase I proposals for a cost up to $250,000 for a 6-month period of performance.
Demonstrate the feasibility of the proposed Platoon Power Generator technology. Identify the technology, fuel choice, along with supporting information. Develop the overall system design, model the size and weight of the system, component choices and sources and perform a comparative analysis of the design metrics with incumbent generator solutions and other technology/fuel implementations from literature. Provide a report on the findings.
Phase II:
Further develop and demonstrate the Platoon Power Generator designed in Phase I. Performers will source and/or build and test key components of the system leading to the demonstration of a TRL 4 breadboard system during phase II performance. Upon a successful demonstration at TRL 4, refinements will be made to improve the system design and address any findings from the breadboard demonstration. Two functional systems will be delivered to the Army for evaluation at the end of the Phase II effort to support 100 hours of testing each, at the nominal power output of the system.
Phase III:
- The generator market is currently a $35.9 billion industry and is expected to grow to $53.5 billion industry by 2032*. The product of this work is directly applicable to the commercial market.
Files
| File | Type | Posted |
|---|---|---|
| A254-040.pdf | ||
| Army_SBIR_254_R9.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity