Mud Moutain Dam Equipment Chipping
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912DW25Q8005
- Agency
- ENDIST Seattle US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238910 Site Preparation Contractors
- Place of performance
- Enumclaw, Washington 98022, United States
- Points of contact
-
- Charles Idle charles.d.idle@usace.army.mil (206) 316-3998
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Seattle District is seeking equipment and operators for debris management work at Mud Mountain Dam near Enumclaw, Washington through solicitation W912DW25Q8005. The project requires three specific pieces of equipment: a Cat D6 Low Ground Pressure Dozer with 6-way blade, a Cat 320 track-mounted hydraulic excavator, and a Cat 336 track-mounted hydraulic excavator paired with a Diamond Z DZT1352B tub grinder or similar equipment with minimum 850 HP and 10' x 10' opening capability. The equipment will be used to retrieve Large Woody Debris from debris basins, deck the material for later pickup, and process logs averaging up to 6 feet in diameter and stumps up to 12 feet in diameter into 6-inch or smaller wood chips. The contract will be awarded to the lowest-priced technically acceptable offeror based on the evaluation criteria. Quotes are due by 10:00 AM on June 27, 2025, with only ten days provided for proposal preparation.
This opportunity is designated as a Total Small Business set-aside under NAICS code 238910 (Site Preparation Contractors) with a size standard of $19 million. No incumbent contractors or current service providers are identified in the solicitation materials. While no specific contract value is disclosed, the scope includes an estimated 80 hours of work for the dozer and first excavator, and 40 hours for the second excavator with tub grinder combination. The period of performance spans two months from August 1 through September 30, 2025, providing a relatively short timeframe for completion of the debris processing work. All work will be performed at the Mud Mountain Dam site in Enumclaw, Washington, requiring contractors to mobilize heavy equipment to this specific location for the duration of the project.
Notice text
Equipment and operator is needed as descriped in the Statement of Work. The period of performance for this project is from 1 August to 30 September
Excavator will be used to retrieve Large Woody Debris throughout the debris basins. The LWD will then be decked for pickup at a later date. Excavators and dozer will be used to gather piles for chipper.
The technically acceptable sizes of the equipment is in the statement of work.
Please note: Diamond Z DZT1352B or similar tub grinder min HP 850, with a minimum 10’ x 10’ opening capable of reducing, large logs, stumps, and old growth timber, Average DBH of logs is up to 6 feet and stumps up to 12 feet in diameter, tub grinder shall reduce debris into 6" minus chips is required with the equipment and operator for this project.
Attachments
| File | Type | Posted |
|---|---|---|
| SOLICITATION W912DW25Q8005.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Mud Moutain Dam Equipment Chipping | Award Notice | |
| Mud Moutain Dam Equipment Chipping | Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity