Mosul Youth Detention Center, Mosul Iraq
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W5J9JE-23-S-0006
- Agency
-
US Army Corps of Engineers
Department of the Army, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Y1FF Construction Of Penal Facilities
- Place of performance
- Iraq
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Transatlantic Expeditionary Division is seeking a contractor to renovate the existing Mosul Youth Detention Center in Mosul, Iraq through a design-build, firm-fixed-price contract valued between $1 million to $5 million. Renovations include demolishing and constructing a new guard barracks, replacing portions of the north and east perimeter walls, adding additional guard towers, constructing a new enclosure for the center yard, replacing the generator, and providing furnishings, fixtures and equipment. Interested contractors must respond by March 2nd, 2023 with capabilities statements demonstrating experience on similar projects, past performance, team composition, experience working with the federal government, and ability to perform work in Iraq.
There is no set-aside designation for this procurement. The primary NAICS code is 236220 and PSC code is S206. Renovations are required to improve security, force protection, and safety measures at the detention center through replacing infrastructure and adding new security technology. Interested contractors are sought to complete the required renovations to existing facilities that house youth detainees in Mosul, Iraq.
Notice text
The Mosul Youth Detention Center project in Mosul, Iraq is a renovation of an existing facility which includes demolition and new construction of a guard barracks, north and east perimeter wall replacement, additional guard towers, a new enclosure for the center yard, and a generator replacement.
The detention center needs minor renovations to include a partial perimeter wall replacement, additional guard towers, a new generator, and a new enclosure for the center yard. The perimeter wall replacement is needed to improve perimeter security by increasing the height and quality of the north and east perimeter walls to match the south and west walls. The additional guard towers are needed for the guards to better cover their respective fields of fire. The new generator is needed for power surety in the event that city power, which the detention center is connected to, is unreliable. The new enclosure for the center yard is needed to increase the space available for detainee youth to run and play without risking injury by running into support beams. Furnishings, Fixtures, and Equipment (FFE) to include metal detectors, an airport baggage scanner, new TVs and cameras for the CCTV camera system, and fire extinguishers. The FFE is needed to increase security, force protection, and safety measures at the facility.
Files
| File | Type | Posted |
|---|---|---|
| Mosul Youth Detention Center Sources Sought Notice (YW).pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Mosul Youth Detention Center | Award Notice | |
| Mosul Youth Detention Center, Mosul Iraq | Solicitation | |
| Renovation of the Mosul Youth Detention Center, Mosul, Iraq | Pre-Solicitation | |
| Mosul Youth Detention Center, Mosul Iraq | Pre-Solicitation | |
| This notice | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity