Mold remediation and repairs to chapter 31 veteran residence

Award Notice Posted

Solicitation number
VA101V14Q0237
Agency
Awarded
to Modecor Corporation
Set-aside
No set-aside

Opportunity facts

Contract number
VA101V14P0399 Federal contract award
NAICS code
236118 Residential Remodelers
PSC
Not on record
Place of performance
Veteran's Residence 79705 USA

Notice details come from SAM.gov. Updated .

Notice text

The US Department of Veterans Affairs, Veterans Benefits Administration, Waco VA Regional Office, Vocational Rehabilitation and Employment Service (VRE), Waco, TX is issuing a PRE-SOLICITATION NOTICE for a Request for Proposal (RFP) firm fixed price construction contract to perform home Modifications services to a Service Disabled Veteran participating in the VRE Independent Living Program located in Midland, TX. This acquisition is under NAICS 236118 (Size Standard $33.5 Million). The magnitude of the procurement is estimated to be Less than $25,000.





The contractor shall provide material, labor, tools, equipment, facilities, transportation and supervision to accomplish the work set forth in this in this statement of work (SOW), except as may otherwise be specified. The basic work required is as follows:

a) Correct Mold Problem in Master Bathroom.

b) Remove all wall paper from the master bathroom.

c) Remove and replace all damaged gypsum wall board in Master bathroom.

d) Install a proper exhaust system in bathrooms.

e) Remove and replace caulking in shower area in bathrooms.

f) Inspect, clean and replace (if needed) HAVC vents.

g) Inspect HVAC unit, make sure filters are properly installed, and that the p-traps lines are properly functioning. Correct if needed.

h) Inspect condensation drain and make sure that it is properly sealed. Correct if needed.







Performance Period: The contractor shall complete the work required under this SOW within 30 calendar days or less from receipt of the notice to proceed, unless otherwise directed by the Contracting Officer. If the contractor proposes an earlier completion date, and the Government accepts the contractor's proposal, the contractor's proposed completion date shall prevail.

Files

File Type Posted
VA101V-14-Q-0237-001.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors