Modified Central City Ham Branch Aquatic Habitat Mitigation
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W9126G24R3892
- Agency
-
ENDIST Fort Worth
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KB Repair Or Alteration Of Canals
- Place of performance
- Fort Worth, Texas, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is seeking a design-build contractor to conduct aquatic habitat mitigation at Ham Branch including stream modifications, native planting, site improvements, and monitoring and adaptive management. The Department of the Army Corps of Engineers Engineering District Fort Worth intends to issue a solicitation on December 12, 2023 using a two-phase design-build selection process in accordance with FAR 36.3. Offerors must be registered in SAM and no state certifications will be accepted. Proposals are due June 5, 2024 and award is anticipated in October 2024. The scope of work will be evaluated and award made to the responsible offeror with the best value proposal.
There is no set-aside designated for this opportunity. Work required includes 1300 linear feet of channel reshaping, 890 linear feet of stream features, 7.4 acres of riparian buffer zone planting, 0.6 acres of emergent wetland creation, removal of a flap gate, and a gravel parking lot. Monitoring will include a sediment trap over an unspecified period. This pre-solicitation notice does not provide budget details but the scope indicates a project value over $2 million given the extent of stream, planting, and site work required.
Notice text
2 versions
Update #2 · Latest ·
AMENDMENT 1:
A Non-Federal Government advisor may assist in the technical evaluation.
After solicitation issuance, contractors may view and or download this solicitation and all amendments at the following internet address: https://sam.gov/ and https://piee.eb.mil/.
In order to download the solicitations and amendments in PIEE, there are 10 general steps a vendor must follow. A complete list can be viewed at the following site: https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml#step5
For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.
It is the Offerors responsibility to monitor the https://sam.gov/ and PIEE at https://piee.eb.mil web sites for amendments to the solicitation.
You must be registered with the System Award for Management (SAM) and PIEE, to receive a government contract award. The Government reserves the right to use only the Internet as notification of any amendments to this solicitation.
---------------------------------------------------------------------------------------
This is not a solicitation. The Government intends to distribute the solicitation on or about the week of 12 December 2023 and will use a Two-Phase Design Build Process in accordance with FAR 36.3 – Two-Phase Design-Build Selection Procedures.
This announcement is an UNRESTRICTED acquisition to construct the aquatic habitat mitigation at Ham Branch. The proposed project will be a competitive, firm-fixed price, Design-Build contract. The contract is anticipated to be awarded in October 2024.
To be eligible for contract award, a firm must be registered with the System for Award Management (SAM) database. Register via the SAM Internet site at https://www.sam.gov/. No state level certifications will be accepted.
PROJECT INFORMATION: Required work will include stream modifications, native planting, site improvements, and monitoring and adaptive management of plantings. Stream modifications include, but are not limited to, 1300 LF channel reshaping and 890 LF of stream rock riffles/pool/run complex. Planting includes approximately 7.4 acres of native riparian woodlands to create a 50-ft wide riparian buffer zone on each side of the stream and creation of 0.6-acre emergent wetland habitat. Site improvements include removal of a hydraulic flap gate at the Ham Branch Sluice, and a gravel parking lot with a trash control system. The scope also includes monitoring and potentially modifying a sediment/litter trap. These scoped items will be subject to monitoring and applying adaptative management strategies to meet success criteria under the established mitigation Monitoring and Adaptive Management Plan.
All offerors are advised that this project may be delayed, cancelled, or revised at any time during the solicitation, selection, evaluation, and/or final award process.
The Government is not responsible for any loss of internet connectivity or for an offeror’s inability to access the documents posted at the referenced website.
Update #1 ·
This is not a solicitation. The Government intends to distribute the solicitation on or about the week of 12 December 2023 and will use a Two-Phase Design Build Process in accordance with FAR 36.3 – Two-Phase Design-Build Selection Procedures.
This announcement is an UNRESTRICTED acquisition to construct the aquatic habitat mitigation at Ham Branch. The proposed project will be a competitive, firm-fixed price, Design-Build contract. The contract is anticipated to be awarded in October 2024.
To be eligible for contract award, a firm must be registered with the System for Award Management (SAM) database. Register via the SAM Internet site at https://www.sam.gov/. No state level certifications will be accepted.
PROJECT INFORMATION: Required work will include stream modifications, native planting, site improvements, and monitoring and adaptive management of plantings. Stream modifications include, but are not limited to, 1300 LF channel reshaping and 890 LF of stream rock riffles/pool/run complex. Planting includes approximately 7.4 acres of native riparian woodlands to create a 50-ft wide riparian buffer zone on each side of the stream and creation of 0.6-acre emergent wetland habitat. Site improvements include removal of a hydraulic flap gate at the Ham Branch Sluice, and a gravel parking lot with a trash control system. The scope also includes monitoring and potentially modifying a sediment/litter trap. These scoped items will be subject to monitoring and applying adaptative management strategies to meet success criteria under the established mitigation Monitoring and Adaptive Management Plan.
All offerors are advised that this project may be delayed, cancelled, or revised at any time during the solicitation, selection, evaluation, and/or final award process.
The Government is not responsible for any loss of internet connectivity or for an offeror’s inability to access the documents posted at the referenced website.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Design-build Phase I. Ham Branch Aquatic Habitat Mitigation at Fort Worth, Texas. | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FY26 Harlingen Placement Area (PA)13 and 10 Improvements | ENDIST Galveston | No set-aside | |
| Gusg habitat hydro-logic restoration 202 | Colorado Region | Total Small Business | |
| FY27 Texas City Ship Channel Main Channel and Turning Basin | ENDIST Galveston | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity