MNA Spillway Repair Pit Lighting

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912EF25QA0036
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Umatilla, Oregon, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The US Army Corps of Engineers Walla Walla District is seeking to procure lighting equipment and components to repair the lighting circuits in spillway gate repair pits at McNary Lock and Dam. The solicitation calls for various LED lighting fixtures including 24 high-output LED wall packs, 14 adjustable output LED wall packs, along with associated electrical components such as MC cable connectors, aluminum interlock armored power cable, NEMA electrically held lighting contactors, wall mount enclosures, steel panels, drill bits, wire connectors, and heat shrink tubing. The contract will be awarded using a firm fixed price arrangement and includes standard federal contracting provisions such as Buy American requirements and various compliance certifications. While the notice indicates an August 18, 2025 posting date with a September 1, 2025 due date, the government file shows the actual offer due date as August 23, 2025 at 11:00 PM. The solicitation was issued on August 14, 2025, with delivery required within 10 weeks of contract award.

This procurement is designated as a Total Small Business set-aside, though the government file indicates it is specifically set aside for Women-Owned Small Business (WOSB) under NAICS code 335132 with a size standard of 500 employees. The contract does not identify any incumbent contractors or current service providers for this specific lighting repair work. No specific award values or budget ranges are disclosed in the available documentation. The work involves repairing lighting systems for two gate repair pits located north of 22 spillway hoists, which are used to repair spillway gates at the facility. Performance will take place at McNary Lock and Dam in Umatilla, Oregon, with all materials to be delivered FOB Destination to that location.

Notice text

The following specifications pertain to the purchase of new light fixtures, wiring, and associated parts necessary to repair the lighting circuits in the Spillway Gate Repair Pit. There are two gate repair pits located just north of the 22 spillway hoists. These repair pits are used to repair the spillway gates.

Files

File Type Posted
Solicitation - W912EF25QA036 - Released.pdf PDF

Notice history

Notice Type Posted
MNA Spillway Repair Pit Lighting Award Award Notice
This notice Latest solicitation Solicitation
MNA Spillway Repair Pit Lighting Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement Cascade Locks, Oregon 97014, United States · NAICS 237310 ENDIST Portland Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity