Mission Voice Platform (MVP) System IDIQ
Award Notice Posted
- Solicitation number
- N00421-19-R-0117
- Agency
-
Naval Air Warfare Center
Naval Air Systems Command, Department of Defense
- Awarded
- to Compunetix Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- N00421-19-D-0056 Federal IDV award
- NAICS code
- 334290 Other Communications Equipment Manufacturing
- PSC
- Not on record
- Place of performance
- Atlantic Test Range 23013 Cedar Point Road, Builing 20670 Patuxent River, Maryland 20670, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Awarded Vendors: Compunetix, Inc. Contract Award Dollar Amount: $12,566,654.00. Contract Award Date: 2019-09-26.
Update #1 ·
1. BACKGROUND
1.1. Test Communications equipment running Mission Voice Platform (MVP) software is used by the Atlantic Test Range (ATR) at NAS Patuxent River, MD to support real-time voice processing, display, and recording capabilities. Specific systems of interest with respect to this SOW are:
-Mobile systems that deploy outside of ATR's typical footprint in order to accommodate complete test teams in a mobile environment. Mobile systems can range from 2 to 40 end units required to provide real-time voice as a safety of flight requirement. Furthermore, these mobile systems can be deployed for various lengths of time, and can be required to be standalone systems or connected remotely to get voice back to ATR real-time.
-Remote systems that will require remote control capabilities and connection back to ATR. These remote systems may consist of end unit and/or radio control as a requirement to extend ATR's footprint permanently, or for single-use purposes.
2. SCOPE
The ATR Range Safety Officer (RSO) requires real-time voice communications to be in place for all live flight tests as a go/no-go requirement. Different test programs demand unique subsets for requirements for internal and air vehicle communications. MVP software must be extremely flexible and able to update to meet new requirements for ATR. Over the next five years, ATR expects to outfit multiple mobile and remote sites with MVP systems in order to meet the ever changing demands from projects.
.
Files
| File | Type | Posted |
|---|---|---|
| Other_than_full_and_open_-_J&A_-redacted.pdf |