Mill Creek Intake Canal Baffle Replacement

Awarded Award Notice Posted

Solicitation number
W912EF18B0030
Agency
ENDIST Walla Walla US Army Corps of Engineers, Department of Defense
Awarded
to Harry Johnson Plumbing And Excavation Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
W912EF18C0031 Federal contract award
NAICS code
238110 Poured Concrete Foundation and Structure Contractors
PSC
Not on record
Place of performance
Mill Creek Project Walla Walla, Washington 99362, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Award W912EF18C0031. Awarded Vendors: Harry Johnson Plumbing and Excavation. Contract Award Dollar Amount: $200,350.00. Contract Award Date: 2018-09-21.

Update #2 ·

Provide all plant, labor, equipment, materials and incidentals to remove and replace 55 reinforced concrete baffles in the concrete intake canal located at the Mill Creek Project near Walla Walla, WA. Each concrete baffle is 18"x48"x24" tall for a total of 25 cubic yards of concrete and are reinforced with #4 reinforcing steel.

All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).


The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1.


A Site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor's on-site operations. The SSHO shall possess a minimum of 5-years' experience in construction safety on similar projects, shall have completed the 30-Hour OSHA Construction Safety training within the last 5-years, and shall have completed at least 24-hours of formal safety training each year for the past 5-years.


The Contractor will be responsible for establishing and managing an effective Contractor Quality Control (CQC) System that will require the development and submission of a comprehensive project specific CQC Plan for Government acceptance. A CQC System Manager employed by the prime contractor shall be required to be on-site for each shift of the Contractor's operations. The CQC System Manager must possess a minimum of 5-years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site. In addition, the CQC System Manager shall have completed the course entitled "Construction Quality Management for Contractors" within the last 5-years.
The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period. QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor after contract award.


The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.


Miscellaneous work within the project includes the delivery of As-Built Drawings.

.

Update #1 ·

Provide all plant, labor, equipment, materials and incidentals to remove and replace 55 reinforced concrete baffles in the concrete intake canal located at the Mill Creek Project near Walla Walla, WA. Each concrete baffle is 18"x48"x24" tall for a total of 25 cubic yards of concrete and are reinforced with #4 reinforcing steel.
The contract requires completion of all work 120 days after Notice to Proceed.

All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).


The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1.


A Site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor's on-site operations. The SSHO shall possess a minimum of 5-years' experience in construction safety on similar projects, shall have completed the 30-Hour OSHA Construction Safety training within the last 5-years, and shall have completed at least 24-hours of formal safety training each year for the past 5-years.


The Contractor will be responsible for establishing and managing an effective Contractor Quality Control (CQC) System that will require the development and submission of a comprehensive project specific CQC Plan for Government acceptance. A CQC System Manager employed by the prime contractor shall be required to be on-site for each shift of the Contractor's operations. The CQC System Manager must possess a minimum of 5-years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site. In addition, the CQC System Manager shall have completed the course entitled "Construction Quality Management for Contractors" within the last 5-years.
The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period. QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network. The Government will make the QCS software available to the Contractor after contract award.


The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.


Miscellaneous work within the project includes the delivery of As-Built Drawings.

.

Attachments

Files attached to this notice, newest first
File Type Posted
Bid_Opening_Worksheet.pdf PDF
Site_Visit_Attendee_List.pdf PDF
W912EF18B0030-0001.pdf PDF
W912EF18B0030_MLC_Intake_canal_baffles.pdf PDF
PLANS_18B0030.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity