Middle Logan Creek Flood Risk Management Project
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W9128F20B0027
- Agency
- ENDIST Omaha US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Randolph NE 68771 USA
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Omaha District intends to issue an Invitation for Bid for repair work to Missouri River Bank Stabilization and Navigation Project structures damaged in the 2019 floods. The solicitation will seek to rehabilitate and rebuild revetments, dikes, kickers and other structures along a 65-mile stretch of the Missouri River through the placement of stone from barges. Bids will be evaluated based on responsiveness and price. All documents will be posted to Beta SAM.gov and bids must be received by August 12, 2020.
This opportunity is set aside for total small business participation. Repairs are estimated between $5-10 million and involve approximately 450 calendar days to complete. Structures from River Mile 563 to 498 will be stabilized with stone quantities designed to return each site to its design lines and grades. The NAICS code for this project is 237990 and PSC code is R499 for levee, breakwater, and revetment construction. The incumbent is the Omaha District of the U.S. Army Corps of Engineers which maintains these structures.
Notice text
3 versions
Update #3 · Latest ·
On or about 13 July 2020, U.S. Army Corps of Engineers (USACE) – Omaha District, intends to issue an Invitation for Bid (IFB) for Middle Logan Creek Flood Risk Management Project Phase 1 The solicitation will close on or about 12 August 2020.
The scope of this project is to furnish all plant, labor, materials, and equipment and performing all work for Randolf Section 205, Middle Logan Creek, NE. Work shall be in accordance with plans and specifications issued with this solicitation. The project is a flood risk management project located along the Middle Logan Creek in Randolph, Nebraska. The work reach extends from approximately 200 feet downstream of Jackson Street bridge to approximately 220 feet upstream of Sholes Road bridge. The work in general comprises 1) earthwork/grading for the realigned and widened Middle Logan Creek channel - excavating existing channel and widening existing channel bottom to approximately 40 feet with 100 foot top for about 15% of channel and 100 foot bottom with 150 foot top for about 85% of channel 2) channel widening under Jackson Street bridge and transition to existing channel downstream of Jackson Street bridge; 3) channel improvements with erosion and grade control; areas of placement of new riprap, and miscellaneous erosion controls such as turf reinforcement mat, seeding, erosion control blanket, silt fence, etc; 4) new and extended storm drainage structures; 5) removal and replacement of Bridge Street and Sholes Road bridges with longer structures over the widened channel; 6) vertical roadway realignment for approaches to Sholes Road and Bridge Street bridges; 7) new 3 strand barb wire fencing, new concrete pavement, and new aggregate pavement; 8) approximately 425 feet of channel widening of the north-south reach of the South Branch tributary of Middle Logan Creek; and 9) installation of approximately 200 feet of 8 inch water main. The new and widened main channel of Middle Logan Creek work has an approximate length of 3400 feet. Demolition and relocation of existing utilities other than storm drainage and domestic water will be performed by the owner of the effected utility and will take place prior to the beginning of construction.
Estimated Magnitude of Construction is between $5,000,000 and $10,000,000.
All solicitation documents will be posted to the web via Beta SAM.gov (beta.sam.gov).
Update #2 ·
On or about 13 July 2020, U.S. Army Corps of Engineers (USACE) – Omaha District, intends to issue an Invitation for Bid (IFB) for Middle Logan Creek Flood Risk Management Project Phase 1 The solicitation will close on or about 12 August 2020.
The scope of this project is to furnish all plant, labor, materials, and equipment and performing all work for Randolf Section 205, Middle Logan Creek, NE. Work shall be in accordance with plans and specifications issued
with this solicitation. The project is a flood risk management project located along the Middle Logan Creek in Randolph, Nebraska. The work reach extends from approximately 200 feet downstream of Jackson Street bridge to approximately 220 feet upstream of Sholes Road bridge. The work in general comprises 1) earthwork/grading for the realigned and widened Middle Logan Creek channel - excavating existing channel and widening existing channel bottom to approximately 40 feet with 100 foot top for about 15% of channel and 100 foot bottom with 150
foot top for about 85% of channel 2) channel widening under Jackson Street bridge and transition to existing channel downstream of Jackson Street bridge; 3) channel improvements with erosion and grade control; areas of placement of new riprap, and miscellaneous erosion controls such as turf reinforcement mat, seeding, erosion control blanket, silt fence, etc; 4) new and extended storm drainage structures; 5) removal and replacement of Bridge Street and Sholes Road bridges with longer structures over the widened channel; 6) vertical roadway realignment for approaches to Sholes Road and Bridge Street bridges; 7) new 3 strand barb wire fencing, new concrete pavement, and new aggregate pavement; 8) approximately 425 feet of channel widening of the north-south reach of the South Branch tributary of Middle Logan Creek; and 9) installation of approximately 200 feet of 8 inch water main. The new and widened main channel of Middle Logan Creek work has an approximate length of 3400 feet. Demolition and relocation of existing utilities other than storm drainage and domestic water will be performed by the owner of the effected utility and will take place prior to the beginning of construction.
Estimated Magnitude of Construction is between $5,000,000 and $10,000,000.
All solicitation documents will be posted to the web via Beta SAM.gov (beta.sam.gov).
Update #1 ·
On or about 29 May 2020, U.S. Army Corps of Engineers (USACE) – Omaha District, intends to issue an Invitation for Bid (IFB) for Missouri River Bank Stabilization and Navigation Project (BSNP) – South Structures Repair. The solicitation will close on or about 30 June 2020.
The 2019 floods caused significant damage to the Missouri River BSNP structures. The damaged structures include revetments, dikes, kickers, L-head dikes and vanes. These structures are critical to maintaining a navigation channel on the Missouri River. The damaged BSNP structures will be rehabilitated by adding stone to replace areas of deterioration. In areas with substantial loss of structural material, the work will effectively rebuild parts of the structure. The quantity of stone for each site is intended to bring the structures to the lines and grades shown on the cross-sections. Due to the location of these structures, it is anticipated that the stone will be placed from a barge. The BSNP South project location extends from River Mile 563 to 498 on the Missouri River in Nebraska and Missouri. Construction Duration will be 450 Calendar Days.
Estimated Magnitude of Construction is between $5,000,000 and $10,000,000.
All solicitation documents will be posted to the web via Beta SAM.gov (beta.sam.gov).
Notice history
| Notice | Type | Posted |
|---|---|---|
| Middle Logan Creek Flood Risk Management Project | Award Notice | |
| Middle Logan Creek Flood Risk Management Project | Solicitation | |
| Middle Logan Creek Flood Risk Management Project | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity