About this opportunity

The Department of the Army Corps of Engineers Engineering District Baltimore is seeking a contractor to construct multiple features at Barren Island to facilitate ecosystem restoration efforts. This includes constructing two bird islands, removing and replacing unsuitable foundation materials, building stone sill structures, modifying the existing sill, installing geotextile structures, designing and installing spillway structures, and excavating and placing material from a nearby federal navigation channel. The contract will be awarded through a total small business set-aside, and the solicitation is due on June 26, 2024.

The project is focused on enhancing the Mid Chesapeake Bay ecosystem through the restoration of Barren Island. No incumbent contractor is specified, and the total value or budget range for the contract is not provided. The work is to be performed at the Barren Island site, and the contract will likely involve the excavation and placement of a significant quantity of materials from a nearby navigation channel.

Notice text

6 versions

Update #6 · Latest ·

This contract will include the construction of multiple features at Barren Island that facilitate the restoration efforts: (1) Construction of two bird islands adjacent to the existing island and connected to the breakwater; (2) removal of unsuitable foundation materials adjacent to the northeast corner of the existing island; (3) placement of suitable materials in the excavation of the unsuitable materials in the northeast corner of the existing island from a nearby borrow area; (4) construction of stone sill structures on top of the placed suitable materials adjacent to the northeast corner of the existing island; (5) modification of the existing sill to incorporate materials to limit material egress from the site; (6) installation of geotextile structures filled with suitable materials from a nearby borrow area; (7) design and installation of spillway structures; and (8) excavation of material from the Honga and Tar Bay federal navigation channel and placement within a contained area adjacent to Barren Island.*1111 Administrative Amendment dated 03 May 2024 is to provide an updated project title. ***1112 Administrative Amendment dated 06 May 2024 is to provide the Specs and Plans due to issues with the initial upload.**** Amendment 0001 dated 29 May 2024, the purpose of this amendment is to provide updated PLA information in the Instructions to Bidders section and to extend the bid close date to 19 June 2024 at 11:00 am (EST). All other terms and conditions remain unchanged.****Amendment 0002 dated 30 May 2024, the purpose of this amendment is to correct the bid due date and bid opening date from 19 June 2024 to 21 June 2024 and to revise the Project labor Agreement (PLA) information. All other terms and conditions remain unchanged.****Amendment 0003 dated 14 June 2024, the purpose of this amendment is to provide 1. Amendment 0003 Specification Changes 2. Amendment 0003 Solicitation Changes, 3. Request for Information (RFI Responses), 4. Revised Bid Schedule, 5. Revised Plans, 6. BA Survey Information, 7. Site Visit Sign in Sheet, 8. Update the Period of Performance, 9. Updated Liquidated Damages amount in clause 52.211-12, 10. Update the meeting code for the Bid Opening. 11. Revised the bid due date and bid opening date from 21 June 2024 to 26 June 2024 No additional RFIs will be accepted. All other terms and conditions of the solicitation remain unchanged.****Administrative Amendment 1113 dated 25 June 2024, The purpose of this administrative amendment is to change the Response date Time Zone to Daylight Savings Time. All other terms and conditions of this solicitation remain unchanged.****

Update #5 ·

This contract will include the construction of multiple features at Barren Island that facilitate the restoration efforts: (1) Construction of two bird islands adjacent to the existing island and connected to the breakwater; (2) removal of unsuitable foundation materials adjacent to the northeast corner of the existing island; (3) placement of suitable materials in the excavation of the unsuitable materials in the northeast corner of the existing island from a nearby borrow area; (4) construction of stone sill structures on top of the placed suitable materials adjacent to the northeast corner of the existing island; (5) modification of the existing sill to incorporate materials to limit material egress from the site; (6) installation of geotextile structures filled with suitable materials from a nearby borrow area; (7) design and installation of spillway structures; and (8) excavation of material from the Honga and Tar Bay federal navigation channel and placement within a contained area adjacent to Barren Island.*1111 Administrative Amendment dated 03 May 2024 is to provide an updated project title. ***1112 Administrative Amendment dated 06 May 2024 is to provide the Specs and Plans due to issues with the initial upload.**** Amendment 0001 dated 29 May 2024, the purpose of this amendment is to provide updated PLA information in the Instructions to Bidders section and to extend the bid close date to 19 June 2024 at 11:00 am (EST). All other terms and conditions remain unchanged.****Amendment 0002 dated 30 May 2024, the purpose of this amendment is to correct the bid due date and bid opening date from 19 June 2024 to 21 June 2024 and to revise the Project labor Agreement (PLA) information. All other terms and conditions remain unchanged.****Amendment 0003 dated 14 June 2024, the purpose of this amendment is to provide 1. Amendment 0003 Specification Changes 2. Amendment 0003 Solicitation Changes, 3. Request for Information (RFI Responses), 4. Revised Bid Schedule, 5. Revised Plans, 6. BA Survey Information, 7. Site Visit Sign in Sheet, 8. Update the Period of Performance, 9. Updated Liquidated Damages amount in clause 52.211-12, 10. Update the meeting code for the Bid Opening. 11. Revised the bid due date and bid opening date from 21 June 2024 to 26 June 2024 No additional RFIs will be accepted. All other terms and conditions of the solicitation remain unchanged.****

Update #4 ·

This contract will include the construction of multiple features at Barren Island that facilitate the restoration efforts: (1) Construction of two bird islands adjacent to the existing island and connected to the breakwater; (2) removal of unsuitable foundation materials adjacent to the northeast corner of the existing island; (3) placement of suitable materials in the excavation of the unsuitable materials in the northeast corner of the existing island from a nearby borrow area; (4) construction of stone sill structures on top of the placed suitable materials adjacent to the northeast corner of the existing island; (5) modification of the existing sill to incorporate materials to limit material egress from the site; (6) installation of geotextile structures filled with suitable materials from a nearby borrow area; (7) design and installation of spillway structures; and (8) excavation of material from the Honga and Tar Bay federal navigation channel and placement within a contained area adjacent to Barren Island.*1111 Administrative Amendment dated 03 May 2024 is to provide an updated project title. ***1112 Administrative Amendment dated 06 May 2024 is to provide the Specs and Plans due to issues with the initial upload.**** Amendment 0001 dated 29 May 2024, the purpose of this amendment is to provide updated PLA information in the Instructions to Bidders section and to extend the bid close date to 19 June 2024 at 11:00 am (EST). All other terms and conditions remain unchanged.****Amendment 0002 dated 30 May 2024, the purpose of this amendment is to correct the bid due date and bid opening date from 19 June 2024 to 21 June 2024 and to revise the Project labor Agreement (PLA) information. All other terms and conditions remain unchanged.****

Update #3 ·

This contract will include the construction of multiple features at Barren Island that facilitate the restoration efforts: (1) Construction of two bird islands adjacent to the existing island and connected to the breakwater; (2) removal of unsuitable foundation materials adjacent to the northeast corner of the existing island; (3) placement of suitable materials in the excavation of the unsuitable materials in the northeast corner of the existing island from a nearby borrow area; (4) construction of stone sill structures on top of the placed suitable materials adjacent to the northeast corner of the existing island; (5) modification of the existing sill to incorporate materials to limit material egress from the site; (6) installation of geotextile structures filled with suitable materials from a nearby borrow area; (7) design and installation of spillway structures; and (8) excavation of material from the Honga and Tar Bay federal navigation channel and placement within a contained area adjacent to Barren Island.*1111 Administrative Amendment dated 03 May 2024 is to provide an updated project title. ***1112 Administrative Amendment dated 06 May 2024 is to provide the Specs and Plans due to issues with the initial upload.**** Amendment 0001 dated 29 May 2024, The purpose of this amendment is to provide updated PLA information in the Instructions to Bidders section and to extend the bid close date to 19 June 2024 at 11:00 am (EST). All other terms and conditions remain unchanged.****

Update #2 ·

This contract will include the construction of multiple features at Barren Island that facilitate the restoration efforts: (1) Construction of two bird islands adjacent to the existing island and connected to the breakwater; (2) removal of unsuitable foundation materials adjacent to the northeast corner of the existing island; (3) placement of suitable materials in the excavation of the unsuitable materials in the northeast corner of the existing island from a nearby borrow area; (4) construction of stone sill structures on top of the placed suitable materials adjacent to the northeast corner of the existing island; (5) modification of the existing sill to incorporate materials to limit material egress from the site; (6) installation of geotextile structures filled with suitable materials from a nearby borrow area; (7) design and installation of spillway structures; and (8) excavation of material from the Honga and Tar Bay federal navigation channel and placement within a contained area adjacent to Barren Island.*1111 Administrative Amendment dated 03 May 2024 is to provide an updated project title. ***1112 Administrative Amendment dated 06 May 2024 is to provide the Specs and Plans due to issues with the initial upload.****

Update #1 ·

This contract will include the construction of multiple features at Barren Island that facilitate the restoration efforts: (1) Construction of two bird islands adjacent to the existing island and connected to the breakwater; (2) removal of unsuitable foundation materials adjacent to the northeast corner of the existing island; (3) placement of suitable materials in the excavation of the unsuitable materials in the northeast corner of the existing island from a nearby borrow area; (4) construction of stone sill structures on top of the placed suitable materials adjacent to the northeast corner of the existing island; (5) modification of the existing sill to incorporate materials to limit material egress from the site; (6) installation of geotextile structures filled with suitable materials from a nearby borrow area; (7) design and installation of spillway structures; and (8) excavation of material from the Honga and Tar Bay federal navigation channel and placement within a contained area adjacent to Barren Island.

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Mid-Bay James Island Restoration Phase 2 Dorchester County, Maryland 21634 · NAICS 237990 ENDIST Baltimore No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors